My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/04/23 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/04/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 11:28:14 AM
Creation date
1/28/2020 11:21:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/23/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For the Student Housing pilot project Ordinance. <br /> Section 2. Requirements. The following requirements shall apply to the subject pilot project: <br /> 1. For purposes of this pilot project"student housing" is a permitted use in the B-3 <br /> zone at the Footprint property on the southwest corner of California Street and <br /> Oakes Avenue. <br /> 2. The building is to be used exclusively for approximately 100 units of student <br /> housing. TLC shall provide a letter to the Planning Department before January 31 <br /> each year confirming that the building is used exclusively for student housing. <br /> 3. The building shall comply with all requirements of the B-3 zone except as <br /> specifically modified in this Ordinance. <br /> 4. The off-street parking standard for student housing shall be one parking space per <br /> habitable unit in the subject building. <br /> 5. For the purposes of complying with EMC 19.34.060.A and EMC 3.78.070D7, the <br /> required off-street parking is authorized in the TLC garage by providing one off- <br /> street parking space for each habitable unit of the Footprint building. <br /> 6. When the Footprint building reaches 90% occupancy for a period of three months, <br /> Footprint shall provide the City a parking monitoring report prepared by a <br /> qualified professional with expertise in analysis of parking and transportation,to <br /> document utilization of on-street parking by building tenants, and utilization of <br /> off-street parking spaces reserved in the TLC parking garage. This plan will be <br /> reviewed by the City Traffic Engineer and the Planning Director to determine if <br /> tenants are impacting the supply of on-street parking spaces, and how many <br /> spaces are being used in the TLC garage over time. If utilization is consistently <br /> lower over a period of time approved by the City's Traffic Engineer than required <br /> in this Section,the City may reduce the required amount of off-street parking <br /> required in the TLC garage to the number determined by the Planning Director <br /> and City Traffic Engineer to be necessary to provide adequate off-street parking, <br /> and authorize an amendment to the covenant recorded on both properties <br /> accordingly (provided it is first approved by the Planning Director and City <br /> Attorney). <br /> 7. The Footprint building will be eligible for consideration for the Multiple Family <br /> Property Tax Exemption of EMC Chapter 3.78 with required off-street parking <br /> provided in the TLC parking garage per this Ordinance, provided it meets all <br /> other eligibility and design requirements of EMC 3.78 and of the B-3 zone. <br /> 8. No City building permit will be issued for the Project until 1) Footprint records a <br /> covenant approved by the Planning Director and the City Attorney , with a copy <br /> of this Ordinance, restricting the use of the Project to student housing and <br /> committing to complying with the provisions of this Ordinance, including the <br /> parking requirement; 2) TLC records a covenant approved by the Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.