My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/04/30 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/04/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 11:42:23 AM
Creation date
1/28/2020 11:35:51 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/30/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 8 <br /> PROJECT TITLE: - <br /> Professional Services Briefing COUNCIL BILL <br /> Agreement with the DLR Proposed Action Originating Department Facilities <br /> Group for the Service Center Consent Contact Person Chris Lark <br /> Redevelopment Project X Action Phone Number 425-257-8897 <br /> First Reading FOR AGENDA OF April 30,2014 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President 4P,, <br /> Location Preceding Action Attachments Department(s)Approval <br /> 3200 Cedar Street Project Briefing PSA Public Works <br /> Amount Budgeted $44,940.00 <br /> Expenditure Required $44,940.00 Account Number(s): <br /> Budget Remaining -0- Utility Fund(Fund 401) <br /> , Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The DLR Group has been chosen by the Public Works Department to provide a design report and cost <br /> analysis for the Service Center Redevelopment Project. <br /> The purpose of this study will be to define the space needs for the project, determine the construction phases, <br /> and develop design options and conceptual cost estimates. The study product will lead to a final <br /> recommendation of the selected design option and phasing of construction. <br /> The cost of the study shall not exceed$44,940.00 and shall be funded by the Utility Fund(Fund 401) <br /> The time line for the completion of the study is 6 months. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign a Professional Services Agreement with the DLR Group for the Service Center <br /> Redevelopment Project in the amount of$44,940.00 <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.