My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6707 HARDESON RD UMBRA CUSCINETTI INC 2020-01-29
>
Address Records
>
HARDESON RD
>
6707
>
UMBRA CUSCINETTI INC
>
6707 HARDESON RD UMBRA CUSCINETTI INC 2020-01-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 1:49:36 PM
Creation date
1/29/2020 1:46:32 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6707
Tenant Name
UMBRA CUSCINETTI INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS <br /> Report Number: M7171835.0001 <br /> Service Date: 10/27/17 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 11/10/17 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> R. Miller, Inc.. Umbra Cuscinetti <br /> Attn:Accounts Payable 6707 Hardeson Rd. <br /> 18321 98th Ave NE Everett, WA <br /> Bothell, WA 98011 <br /> Project No.: M7171835 <br /> Permit No.: B1708-038 Weather: Inside Building <br /> Samples: (4) 4x8" cylinders <br /> On site to inspect rein . . - __ d monitor concrete placement of machine footings. <br /> Inspected reinforcement per plan page A-1 and detail 1/A-2. Verified bar size, grade, spacing, cover and <br /> clearances. Monitored concrete placement of(20) cubic yards of CalPortland mix#3341 via line pump with <br /> mechanical consolidation. Cast(3) Milling Machine foundations and (4) 4x8" cylinders for compression testing <br /> (4000 psi required at 28 days per General Note G-1). <br /> To th- o ou • -' les.e, the items inspected today are in conformance with approved plans and <br /> •-cifications. <br /> ft 11 <br /> V it <br /> "l 11/ <br /> Services: Special Inspections/Materials Testing <br /> Mayes Testing Engineers Rep.: Jesse Kane <br /> Reported to: R. Miller Construction <br /> Contractor: R. Miller Construction <br /> Report Distribution: <br /> (1)City of Everett,Dave Foster (1)Mayes Testing Engineers,Inc,Bob <br /> Gardner s4 <br /> (1)R.Miller,Inc.,Jim Rodgers (1)R.Miller,Inc.,Rosario Koenig Reviewed By: „� 1` i <br /> (1)R.Miller,Inc.,Tyler Hale Robert Gardner <br /> Senior Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client \ <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 Pa <br />
The URL can be used to link to this page
Your browser does not support the video tag.