Laserfiche WebLink
. _L . _ .il. _ . .- -= ��4MAMYII_1! . . .. • <br /> �FLUSH BEAM OR HEADER <br /> PER PLAN <br /> TYP DOUBLE TOP PLATE I <br /> PER DETAIL 3/S4.0-�, � REFER DETAIL 3/S4.1 SHEARWALL (SW) SCHEDULE 9000 OO <br /> � � FOR CALLOUTS IN ; O TOP PLATE CONNECTION � BASE PLATE CONNECTION <br /> Connnnorv. MARK SHEATHING PANEL EDGE <br /> ' 16d @ 12" OC <br /> EQUA EQUAL �� STAGGERED E�SEWHERE � NAILINGOO � at TJI LSL at WOOD at CONCRETEO <br /> (8)16d @ 4 OC <br /> AT EACH SIDE OF SW1 %2' PLYWOOD 8d 6"OC 16d 6"OC A35 24"OC 16d 6"OC 5 �� �� nickerson en ineerin <br /> CS16x24"(U.N.O. ON PLAN) SPLICES, TYP TOP CHORD SPLICE @ � � �° /a �AB @ 48 OC g g <br /> 2221 Everett Ave#202 <br /> w/(22)8d SPACED EVENLY SW2 %2' PLYWOOD 8d @ 4"OC 16d @ 4"OC A35 @ 16"OC 16d @ 4"OC 5/a'Q1 AB @ 32"OC Everett,WA 98201 <br /> TYPICAL FLUSH HDR �END OF BEAM/HDR 425.610.4425 <br /> SW3� i %2' PLYWOOD 8d @ 3"OC (2)ROWS16d @ 6"OC A35 @ 12"OC 16d @ 3"OC 5/$'Ql AB @ 16"OC 6� <br /> �c Nickerson Engineering,LLC 20t8 These <br /> TYP DOUBLE TOP PLATE A35 @ EXT WALLS ONLY � SW4C � %2' PLYWOOD � 8d @ 2"OC (2)ROWS 16d @ 4 1/2"OC A35 @ 9"OC � „ 5/8'QJ AB @ 12"OC 6� drawings were prepared for the"LEACH <br /> I 4/ OC RESIDENCE"project in EVERETT,WA. <br /> PER DETAIL 3/S4.0 OMIT @ HEADERS<6'-0" BOTTOM CHORD SPLICE They are not intended for use on any otner <br /> project. . <br /> 1O BLOCK PANEL EDGES WITH 2x LAID FLAT AND NAIL PANELS TO INTERMEDIATE SUPPORTS WITH 8d @ 12"OC. Stated drawing scale is based on <br /> 36"x 24"sheet. <br /> 20 8d NAI�S SHALL BE 0.131"QJ x 2%2' (COMMON); ACCEPTABLE SUBSTITUTE FOR 8d's ARE 10d's OF 0.131°0 x 3"AT CONTRACTORS OPTION; 16d NAILS <br /> SHALL BE 0.135"P1 x 3%z" (BOX) , 0.148"f?�x 3" (SINKER), OR 0.162"fl�x 3" (COMMON WIRE) <br /> �3 EMBED ANCHOR BOLTS(AB'S)7"MIN & PROVIDE 3"x3"�4'PL WASHER AT EA AB; EXPANSION BOLTS, TITEN HD ANCHORS, OR EPDXY EMBEDDED <br /> THREADED RODS MAY BE POST INSTALLED IN LfEU OF AB'S;ALL POST INSTALLED ANCHORS SHALL HAVE 3"x3"�a" PL WASHER; EPDXY EMBEDDED <br /> 6'-0"MIN BETWEEN SPLICES OPTION SHALL UTILIZE SIMPSON SET-XP EPDXY. <br /> (6) 16d EACH END O4 (2)2x STUDS MIN ARE REQUIRED AT THE END OF ALL SHEAR WALL PANELS TO RECIEVE THE PANEL EDGE NAILING; BUILT UP 2x STUDS SHOULD FACE �PAUL� <br /> BEAM OR HEADER SPLICES TO OCCUR @ C� NAILED w/ 10d OR 16d NAILS PER THE BASE PL NAILNG REQMT'S OF THE SPECIFIC SW TYPE (PER PLAN)-SEE DETAIL B ,c,p4���� C'P�,� <br /> PER PLAN OF VERT STUD TYP � <br /> O 3x STUDS OR (2)2x STUDS ARE REQUIRED AT ABUTfING PANEL EDGES OF ALL SW3&SW4 WALLS; WHERE (2)2x STUDS ARE UTILIZED PROVIDE V � �;�;• � <br /> B A S E P L N A I L I N G A L O N G F U L L V E R T I C A L F A C E OF 2x'S �� � <br /> WHERE OPENING IS LESS <br /> MULTI-STUD PER P�AN T H A N 4'-0", P R O V I D E(1) . � FOR SW3&SW4 ANCHOR BOLT&PLATE WASHER PLACEMENT-PLATE WASHERS SHALL BE NO MORE THAN%2' FROM INTERIOR ��, '�. �� „J���w w� � <br /> NAILING PER GENERAL NOTES <br /> �- BEARING STUD, UNO FACE OF SHEATHINGlSILL PLATE EDGE WHERE NAILING OCCURS FOR SW3&SW4-SEE DETAII.C. O��i�r�y E: ��� <br /> 7O ALL EXTERIOR WALLS SHALL BE SW1, UNLESS NOTED OTNERWISE. `rS�QNAL�� ��� <br /> TYPICAL DROPPED HDR y <br /> Og ALTERNATIVE CONNECTIONS FOR A35'S: LTP4 FLAT PL'S AT SAME SPACING FROM RIM/BLOCKING/BEAM TO TOP PL'S,A 2x NAILER FOR CEILING n�`� <br /> CONNECTION, OR THE HORIZONTAL SHEATHING SPLICElJOINT TO OCCUR ON RIM/BLKG/BEAM (ABOVE TOP PL'S&BELOW BOTTOM PL)-SEE DETAIL A <br /> TY P I CAL H EAD E R S U P PO RT 4 TYP I CAL TO P P LATE S P L I C E 3 � ��s�OSB IS ACCEPTABLE SUBSTITUTE FOR%2'CDX PLYWOOD w/SIMILAR SPAN RATING. <br /> SCALE:3/4"=1'-0" S`4,.o SCALE:3!4"=1'-0" S'`/,�,.0 <br /> PANEt EDGE NAILING OVER �� �PER SW SCHED <br /> ALL HOLDOWN STUDS 8d FLOOR SH7'G NAILS SPACED AT PARALLEL FRM'G, (1)JOIST 2x OR LSL � INTO 2x NAILER <br /> PER SW TYPE BELOW(6"OC MAX) BAY OF 2x FULL DEPTH BLKG @ � EDGE NAILING �I� <br /> SHEARWAL�PER PLAN 48"OC W/(4)8d FROM SHT'G 16d NAILING "; I N T O R I M A T <br /> •� —MST HOLDOWN STRAP /�VERTICAL GRAIN BLKG TO J O i S T T Y P E, S P A C I N G, & D I R, P E R S C H E D HORIZ JOINT �'' \ <br /> S H E A R W A L L � PER PLAN EQUAL NUMBER / M A T C H H O L D O W N S T U D S AND FLR SHT'G PER PLAN <br /> PER PLAN �� OF SPECIFIED NAILS INTO HOLDOWN STRAP PER PLAN i � ' <br /> � WHERE OCCURS PANEL EDGE NAILING �� LTP4 OPTION <br /> ¢ . STUDS ABOVE AND BELOW � � ��� <br /> d I (4)8d INTO EA BLOCK PER SW TYP&SCHED �� <br /> W •o NA►LING PER SHEARWALL W <br /> ;o SCHEDULE TYP JOIST DIRECTION AND 2x4 MIN FLAT BLKG BETWEEN = � ����—A35 PER SW TYPE BELOW DETAIL A-SEE NOTE 8 U w � <br /> STUDS AT PLYWOOD/OSB SHT'G ABV SHEAR PANEL w/ <br /> SHEATHING PER PLAN SPLICE FOR PANEL EDGE � ) PLYWOOD JOINT z � o <br /> JOIST DIRECTION FULL WIDTH VERTICAL RIM JOIST SPACING PER SCHED 8d EDGE NAILIN W W � ` <br /> PER PLAN GRAIN 2x BLKG TO . � EA STUD 0 � <br /> NAILING OF BOTH SHEETS <br /> � MATCH HOLDOWN STUDS , � � (2) 16d TOE NAILS TYP <br /> A35 PER SW SCHEDULE ''i �, 5/a"�AB'S w!3"x3°�4' PL WASHERS �CH JOIST OR BLKG 16d STUD FACE � : (n � � <br /> II i �, � PER BASE PL REQMT'S OF SW NAILS PER BASE PL W Z <br /> , �!, �, 16d FACE NAILS SPACED PER � <br /> SCHEDULE REQMT DETAIL B-SEE NOTE 4 � Q f- <br /> BASE PL REQMT OF SW SCHED � W <br /> LEAVE ONE END OF STRAP / , � WHERE(2) STUDS ARE REQ'D = � � <br /> •,; UN NAtLED UNTIL JUST PANEL EDGE NAILING �� AT ABUTTING PLYWOOD EDGES U O � <br /> PRIOR TO COVERING � � PER SW TYPE&SCHED a � -SEE DET B � N W <br /> MAX- INSIDE N W <br /> Q •o �/ (2)16d THRU EA WHERE JOISTS ARE FACE OF SHT'G TO � � <br /> �' JOIST OR BLOCK PARALLEL, PROVIDE � FOUNDATION PER PLAN W <br /> W � TJI BLKG @ 48"OC PL WASHER EDGE . . <br /> :o: � J <br /> TYPICAL WALL CONSTRUCTION <br /> .a. <br /> DETAIL C-SEE NOTE 6 <br /> TYPICAL MST HOLDOWN STRAP s EXTERIOR WALL @ FLOOR 7 SHEARWALL SCHEDULE AND TYPICAL CONSTRUCTION � <br /> SCALE:3/4"=1'-0" S4.o SCALE:3/4"=1'-0" S4.o SCALE:NTS S4.Q <br /> � ��/ �/-�� ��/�����-\/-'�/��`, <br /> �� NAIL SHEATHING TO BLOCKING 2�_p�� <br /> � W/PANEL EDGE NAILING PER No. Date Issue <br /> � SHEARWALL SCHEDULE,TYP A 10.17.18 Preliminary <br /> � -- _ _--- -_ <br /> ' � PANEL EDGE NAILING 0 10.22.18 Building Permit <br /> _--__--____-- --------__ _ <br /> � ` 1 12A3.18 Revision <br /> I �' __ __ --__ __ <br /> NEW BEAM PER PLAN / HANGER PER PL.AN NOTES =(E)WALL PER PLAN <br /> � _._.___ <br /> HEADER PER PLAN i - - <br /> NEW FLOOR SHTG & FRMG `-(E) FLOOR SHTG & FRMG � <br /> �� NEW HANGER PER PLAN PER PLAN - - <br /> , , , , , , , , , , <br /> � NEW HEADER PER PLAN � � \ CS16 STRAP, TYP <br /> �' R - TH ___ ___ _ _ ---- <br /> � W � NAIL EVE Y O ER <br /> C' � <br /> HOLE <br /> � <br /> 2x FLAT BLKG TYP � ____. -- -- <br /> 'v �;i <br /> � - -_ <br /> � ; � � � -- <br /> . . . . . . . . <br /> . . . . . . . . <br /> '� __ _ <br /> a <br /> > (E)2X8 LEDGER 1 w� <br /> (6) 16d LEDGER NEW \; Sheet Contents <br /> � BEAM- EA SIDE (3) ROWS SIMPSON SDWS 0.22x5 <br /> � SCREWS @ EA EXISTING STUD I � <br /> (E) BEAM HANGER � (16"OC MAX) � . <br /> ���'� �, W�DTH oF D TAIL�S <br /> j (E) (2)2X8 PER PLAN SHEAR WALL <br /> � PLAN VtEW � � <br /> � \ <br /> � j PANEL EDGE NAILING PER SHEARWALL SCHEDULE � <br /> `� / AT FULL HEIGHT STUDS AROUND WALL OPENING TYP� Job No. �H-OCO <br /> � � <br /> `�__���_-_/\_���'�_�`�____��_��_��--� �-��---���-_,�___/'�� <br /> BEAM SUPPORT @ (E) WALL 11 NEW FLOOR CONN @ (E) WALL �o HORIZONTAL STRAPS AT UPENING Q SheetNo. <br /> SCALE:3/4"=1'-0" S'4 � SCALE:3/4"=1'-0" s'4.0 SCALE:3/4"=1'-0" S`4.� <br /> ■ <br /> CiTY �� ��ERETT <br /> ��\/I�1/�E[� �(�� �'���!?` <br />