My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7305 E HEATHER WAY 2020-01-29
>
Address Records
>
E HEATHER WAY
>
7305
>
7305 E HEATHER WAY 2020-01-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 2:33:02 PM
Creation date
1/29/2020 2:32:51 PM
Metadata
Fields
Template:
Address Document
Street Name
E HEATHER WAY
Street Number
7305
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
new <br /> WAC �������~���^ ELECTRICAL, PLAN ��������� <br /> EVERETT °-�~~ -�~� ~° �~ ~�°~~�~" ° " `^~~~~°� ° ~~°�"°� "~~� � �^��� <br /> _~~°° <br /> DIRECTIONS: Reae the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is <br /> required, select the box next to(b)and(c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit app|iootion. <br /> � -- -~- ` ----- -- -- - —| <br /> Ditem (e)-Uiiii,mrv1ioselected, the work must also comply with section(a)-(v ).See arrow flow chart below. <br /> (3)Electricaplan review. <br /> [~] 44E|uut/ica|p|ao/emi*wiopot required for: <br /> (i)Low voltage systems; <br /> (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> (iii)Heating and cooling specific retrofprojects tharesult in an electrical load reduction on each existing feeder <br /> - ~~ <br /> involved in the project,provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv)Stand-alone utility fed services that do not exceed 250 volts40Oamperes where the pn�ao('sdis1hbubunsystem <br /> [� include:does not ' <br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2;or <br /> (C)A required fire pump system. <br /> (v)Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground: <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C) Does not involve branch circuits or feeders ot an essential electrical system as defined in NEC 517.2; � <br /> and <br /> (D)Service orfeeder load calculations are increased Uy5Y6nrless, <br /> U � <br /> (vi)Electric power production source(s)such as solar photovoltaic,fuel cell,or wind electric system(s)with a total • <br /> L] rating cf9GOUwatts o/less. <br /> (yid For installations in(a)(ii),(iii),and iv)of this subsection to be considered,the following must be available <br /> to the electrical inspector before the work is Initiated: <br /> (A)A clear and adequate description of the projects scope; <br /> (B)A load calculation(s); <br /> (C)Whathe lead changes are,providing both before and after panelschedules as needed; and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is • <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental,and chiropractic clinic"of which is a clinic or <br /> E] physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> (b)Electrical plan review is required for all other new or altered electrical projects in educational,institutional,or health care <br /> Lei occupancies defined in this chapter. <br /> | r� <br /> (c)If a review is required,the electrical plan must be submitted for review and approvalbefore the electrical woris begun. <br /> Table 900.1 <br /> Table 900-2 <br /> w°/,"",p.rs="°/c*"mum/es ' <br /> Educational and institutional Facilities.Places of Assembly,m,Other FacilitiesPar,..onal Care Facility Plan RevieW <br /> !YPe Required <br /> —tducaLiomw/.msu^ouonal,oFiPlan Review <br /> Other Facility Types nequirea <br /> N o t es to Tables 900.1 and 900.2, <br /> _| pERNry .// pae���anRovmw <br /> _ __~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.