<br /> T.E.S.C. NOTES
<br /> ___ _ �j
<br /> �, APPROVAL OF THIS STORMWATER SITE PLAN DOES NOT CONSTITUTE AN P O RT I O N O F S E C ■ S TW N . 2 9 N ■ R G E . 0 5 E ■ W■ M ■
<br /> APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN. ' �
<br /> 2. THE IMPLEMENTATION OF THESE TESC BMPS AND THE CONSTRUCTION, Y WA H I N G T O N ■ ■ �
<br /> MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS C I TY C� F EV E R E TT S N O H C) M I S H C O U N T S
<br /> THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL � �
<br /> CONSTRUCTION IS APPROVED.
<br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE
<br /> HYDROSEEDING NOTES TACOMA • SEATTLE • SPOKANE • TRI-CITIES
<br /> CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE 1. HYDROSEEDING SHALL BE APPLIED IN ACCORDANCE WITH THE "T.E.S.C. NOTES" ON THIS 2215 North 30th Street, Suite 300 Tacoma, WA 98403
<br /> CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE F�AGGED CLEARING SHEET. 253.3832422 TE� 253.383.2572 FAX www.ahbl.com WEB
<br /> LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE
<br /> ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 2. HYDROSEEDING TO BE THE FOLLOWING MIXTURE: Proiect Title:
<br /> 4. THE TESC BMPS SHOWN MUST BE CONSTRUCTED PRIOR TO ALL CLEARING COMMON NAME % % % , �� �
<br /> AND GRADING ACTIVITIES, AND IN SUCH A MANNER TO ENSURE THAT ��`
<br /> SEDIMENT-LADEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR BY WEIGHT PURITY GERMINATION ���� G LAC I E R
<br /> VIOLATE APPLICABLE WATER STANDARDS. REDTOP (Agostis alba) 10 92 90 � P EAK AT
<br /> ANNUAL RYE (Lolium multiforum) 45 98 90 �
<br /> 5. THE PERMITTEE SHALL NOTIFY THE CITY ENGINEER OR DESIGNEE TO CHEWING FESCUE (Festuca rubra commutata) 45 97 80 �� � RIVE RS I D E
<br /> SCHEDULE INSPECTIONS AT THE COMPLETION OF THE FOLLOWING PHASES (Jamestown, Banner, Shodow, or Koket) m� �
<br /> OF WORK: �� �
<br /> � Client:
<br /> • PRECONSTRUCTION INSPECTION. PRIOR TO THE COMMENCEMENT OF ANY 3. APPLICATION TO BE 100LBS/ACRE ��m
<br /> OTHER WORK, THE INSPECTION OF EROSION AND SEDIMENT CONTROL �'� � �� PANATTONI DEVELOPMENT
<br /> DEVICES SHALL TAKE PLACE WHEN INSTALLATION OF ALL THE EROSION 4. 500 LBS/ACRE 10-20-20 FERTILIZER, '1500 LBS/ACRE WOOD FIBER CELLULOSE WITH SOIL BINDER mC� � ���
<br /> AND SEDIMENT CONTROL DEVICES HAS BEEN COMPLETED ACCORDING TO OR TACKING AGENT TO BE APPLIED WITH SEED MIXTURE. �"� � '� COM PANY LLC
<br /> APPROVED PLANS. ONLY THE MINIMUM AREA NECESSARY FOR �� � ��� �
<br /> � m �������►����PT� °��
<br /> INSTALLATION OF EROSION AND SEDIMENT CONTROL DEVICES SHALL BE 5. SEED BEDS PLANTED BETWEEN MAY 1 AND AUGUST 31 WILL REQUIRE IRRIGATION AND OTHER � �, ��� 900 SW 16TH STREET
<br /> CLEARED AND/OR GRADED PRIOR TO THIS INSPECTION. MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE.
<br /> � 3 �lrv���� �{lF N��C�ED� SUITE 300
<br /> � � "`"� - _.� ���.��p,����f,���� RENTON, WA 98057
<br /> • ROUGH GRADING INSPECTION. WHEN ALL ROUGH GRADING IS COMP�ETE, 6. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF THE SEED BED — —�,�� ;�.,:� ,' 45�����-���T�� CONTACT: DONNIE BELK
<br /> WILL BE NECESSARY. (E.G., GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING.) �`" i �
<br /> INSPECTION OF THE SITE SHALL TAKE PLACE TO DETERMINE THE �---•����- -=,-- � BY�XCAV�TIt�N
<br /> SATISFACTORY FUNCTIONING OF ALL EROSION AND SEDIMENT CONTROL � '
<br /> DEVICES. 7. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS i „ , � - : ` ,��'��� �`�.� � �, Job No.
<br /> GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS AND SEDIMENT ` ` 1'�f'"-3° �``�-1`�F t�UARF�Y ��,^
<br /> � 1NASHE[7 f�{7GK SPALLS FILTER��BRt� 2150808.10
<br /> aasiNs. m ��r�c���r�a�i��
<br /> • FINAL INSPECTION. UPON COMPLETION OF ALL CONSTRUCTION, G7 �.�,_ � ����Q����-� �q.���p}����A�
<br /> INSPECTION OF THE SITE SHALL TAKE PLACE TO DETERMINE THAT ALL 8. THE SEEDBED SHALL BE FIRM WITH A FAIRL.Y FINE SURFACE, FOLLOWING SURFACE � STC�RAGE{MIN.} Issue Set & Date:
<br /> TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN ROUGHENING. PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE. � SL?ll.TYP���PEI�RANT
<br /> REMOVED AND THAT THE SITE HAS BEEN PERMANENTLY STABILIZED. � ���'������'�� F i LL AN D G RAD E
<br /> 9. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS �
<br /> 6. THE TESC BMPS SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS USED SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS. �
<br /> FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, �
<br /> THESE TESC FACILITIES SHALL BE UPGRADED (E.G., ADDITIONAL SUMPS,
<br /> 10. SEED SHALL NOT BE USED IN AREAS SUBJECT TO WEAR BY CONSTRUCTION TRAFFIC. �
<br /> RELOCATION OF DITCHES AND SILT FENCES, ETC.)AS NEEDED FOR 6/3/2016
<br /> UNEXPECTED STORM EVENTS AND AS THE CITY REQUIRES.
<br /> 7. FROM OCTOBER 1 THROUGH APRIL 30, NO SOILS SHALL REMAIN EXPOSED AND
<br /> UNWORKED FOR MORE THAN 2 DAYS. FROM MAY 1 THROUGH SEPTEMBER 30, �; ~::
<br /> NO SOILS SHALL REMAIN EXPOSED AND UNWORKED FOR MORE THAN 7 DAYS. `r:'� '?..� �`��IEW jY
<br /> THIS CONDITION APPLIES TO ALL SOILS ON SITE, WHETHER AT FINAL GRADE �(� � � � oF ASkj���
<br /> OR NOT. SEE THE DEPARTMENT OF ECOLOGY 2005 STORMWATER � � � ����' � �o�',,�
<br /> M A N A G E M E N T M A N U A L F O R W E S T E R N W A S H I N G T O N, V O L U M E E I, F O R v�+i€�E��,���c;—�F '� � '
<br /> ADDITIONAL SOIL STABILIZATION REQUIREMENTS. ° ,�.u..
<br /> ���v�.����c�c�� � _
<br /> ���°ru�e������ � '
<br /> 8, ANY AREA NEEDING TESC MEASURES, NOT REQUIRWG IMMEDIATE ��-���'N�,, S E D I M E NT TRAP �0�o R 34858 9 <v�
<br /> ATTENTION, SHRLL BE ADDRESSED WITHlN 15 DAYS. � �������:��R�� � r��,s �'GISTER��`�'
<br /> `� �p���p���L..—�,, NOT TO SCALE SIONAL
<br /> 9. AT NO TIME SHALL MORE THAN 1 FOOT OF SEDIMENT BE ALLOWED TO � �-. �
<br /> ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE �' ;�, �� ; 06/07/2�/6
<br /> LWES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANlNG OPERATION
<br /> SHALL NOT FLUSH SEDIMENT-�ADEN WATER INTO THE DOWNSTREAM SYSTEM.
<br /> 10. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE
<br /> BEGWNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE �"'�"
<br /> �--- .��.._._�._.� .�.A
<br /> ,� ._ ___.
<br /> � , �
<br /> 0�As4:K�IL�.P��+1D �"""`�� NOTiCE
<br /> PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL � ��
<br /> �QR���°��T�� , �.- � �V iu.t�nar a�tns ooaworr siui.Mv,woet�n�
<br /> PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. � �� -�_ �, '��i�r � ��
<br /> � ,� � t, �� C3 �ar+�s�Mo 5ouutur�.aua�chna a�
<br /> �r '�.s� , �. aFF�_ "�i� � �1 50
<br /> � �.,,I���.i� £-g�...�tt, ,�,,, f �. �L �� 1HS DOq11QlT DOES NOT OFIiO(3AlE FRpI FESERIED
<br /> r.`�;�..� �ffr, � ,,r� '�•., � ��lt� � orr�srw��s M n.n�s ooa,�.nr�Faa use
<br /> 11. PROVISIONS SHALL BE MADE TO AVOID THE TRACKING OF SEDIMENT BY � �, � �`�� `, ,� '� '�r �'ti � � �" �t��`�y a�r�n�r��r n�n�m N n�m��aa
<br /> �� ; , �
<br /> „ ir �1� �.a.. �-� u,
<br /> � ��,' / '--��' d � -� �°,. �r- AIW IS N07 TO BE t7SED FOR REPAY�kE1100E1.OR
<br /> �, r i� .� -� �,� _ ��Ma�i_s. � j �,.✓ � AOpiION 70 1NAi PRO�ECT Oft FOR ANY OiFER PRQECT.
<br /> CONSTRUCTION VEHICLES ONTO PAVED PUBLIC ROADS. IF SEDIMENT IS �� � � �� ; �� �, ;.,. � � ��o� � �c��; ,..-
<br /> DEPOSITED, THE ROADS ARE TO BE CLEANED EVERY DAY BY SWEEPWG. � � `��� _ � ����i°r���°��s��.��;�', '� `� �,:.-'�
<br /> _��. �,$
<br /> ,.__ 1� _ , {�� r;;
<br /> _� � �t�� �a �? �—�a e a � a ,`
<br /> � _` „ �` � �)v��Gl �L.'C� ,t�t� t'F�u°�. _ '';".w!�i.
<br /> 12. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS ATEMPORARY � � , � � ' � , `, �; �� 'r 1' �'�� 't-�' �'�:,r f��f"f'�`"t':�'`�'�-�.� �-:�?�� �r
<br /> �2 :ETl'L1P�Gi��F'_H < � � — � ��� � �,s �..��� � c,� � , .��. ra � ���
<br /> `'" { F.�. ��.,��.�� r�c� � ��. i�.",�'�k;� � -�. r�`�""",.
<br /> SETTLING BASIN SHALL BE MODIFIED W1TH THE NECESSARY � � ` � ;� � � ��- �� � � �� ,��� `� � �"' �� . - � �- �� �+ � �9?,�
<br /> EROSION-CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE ��`���`�'� � ''�� �'� �� �
<br /> ��CTk�'Jhi A-A �--�='"'�'�"`�`"",�,Y�''� � ; Y'�f' ��- � r � .:_� 4 � � '�"�;� ���--r�
<br /> .�- ,,�,, r�. . �� - ��, �, ,� �..� �
<br /> c,,,-
<br /> �
<br /> CAPACITY AND SHALL BE CLEANED OUT ENTIRELY FOLLOWING PROJECT � �`'� r, � , � � 3� ��.�
<br /> �
<br /> COMPLETION. �i�T'����+�t�i��,��`��zi�,� ���..�. ----".----� �--�`"` _
<br /> t�t�t�� �����:c�� � �� .,... __ __ __ � : �.___ � .� 4
<br /> ..... �
<br /> o`-` � E :. ` _
<br /> �
<br /> �Ct�7�VALEiSIT Wlii�}���1�� � 2"x4"x9A t'aAtJ€�� _,_..--°~'" i
<br /> 13. AS CONSTRUCTION PROGRESSES AND UNEXPECTED SEASONAL CONDITIONS �''� ,-� �-- t'�� �E 3� � � — l �( `— � -.
<br /> DICTATE, AND AS THE CITY REQUIRES, THE PERMITTEE SHOULD ANTICIPATE >>.� ,'`` {-����'°�� � '�'�'������'�'����ABR�G � �4�y�,����,���;� � �'
<br /> THAT MORE TESC MEASURES W(LL BE NECESSARY TO PROTECT ADJACENT �y ' ������� � ���� � �
<br /> f,,-'`� i QUAFtf2Y Si�ALLS �'"'�-�.,;,_ 3 �"�
<br /> PROPERTIES AND ENSURE ADEQUATE WATER QUALITY FOR SITE RUNOFF. IT � 1��.a.
<br /> SHALL BE THE RESPONSIBILITY OF THE ESC SUPERVISOR TO ADDRESS ,, r [s��-�.�'
<br /> DEFICIENT TESC CONDITIONS AND PROVIDE ADDITIONAL FACILITIES, OVER •'` ��������������
<br /> AND ABOVE MINIMUM REQUIREMENTS OUTLWED ON THE APPROVED PLANS. � �
<br /> 14. THE ESC SUPERVISOR SHALL INSPECT ALL TESC MEASURES MONTHLY *�'
<br /> DURING THE DRY SEASON (MAY 1 TO SEPTEMBER 30), WEEKLY DURING THE �
<br /> WET SEASON (OCTOBER 1 TO APRIL 3Q), AND IMMEDIRTELY FOLLOWING �
<br /> SIGNIFICANT STORMS (0.4 INCHES OF PRECIPITATION IN 24 HOURS). WRITTEN "
<br /> Revisions:
<br /> RECORD OF THESE INSPECTIONS SHALL BE RETAINED ON SITE, WITH A COPY
<br /> OF THE INSPECTION REPORT BEING FORWARDED TO THE CITY ENGINEER OR "
<br /> DESIGNEE WITHIN 48 HOURS OF EACH INSPECTION. ESC SUPERVISOR SHALL
<br /> Sheet Title:
<br /> BE RESPONSIBLE FOR MAINTAINING ALL TESC BMPS AS NECESSARY TO " NOTES AN D
<br /> ENSURE CONTINUED SATISFACTORY FUNCTION AND OPERATION. �
<br /> 15. RETURN SILTATION CONTROL AREAS TO ORIGINAL OR BETTER GROUND � � � � � � � I D ETAI LS
<br /> CONDITIONS AT PROJECT COMPLETION. � � [ [ � � � � (
<br /> [ [
<br /> � � s-r�����s-r� I � 1 �
<br /> �°�.�. � U U Desiqned bv: Drawn bv: Checked bv:
<br /> � �� �L�v�,�z�r��v �`�;�� ��5 i � �(��1 � BEB BEB s�-K
<br /> � �`�,� �' �� �IT"Y t�F �1f�R�"fT ��I�I�IENT �'R�F� ��1T��" �.
<br /> 0 � d �/i 1,�2�� 1 �v��.�� �r+���� r�
<br /> ����r.
<br /> �, �["�'Y �F` �'1/�I��TT T�MF'C}�RY �ILT FE�J�E
<br /> �'��;t�: ,�'YE; TT �E�}��T�EM� .G � � Sheet No.
<br /> � A, �►���.�+c w���c�
<br /> ������� �����►��r����r ��� � � � ������ �t,� ��� -�
<br /> `� q �'
<br /> �! �' J��� �,�� ���:
<br /> � ��
<br /> Knowwhat�sbelow. SILT FENCE SEDIMENT TRAP OUTLET '
<br /> C11I before you dig. � NOT TO SCALE � NOT TO SCALE 4 of 4 Sheets