My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1336 MADRONA AVE 2020-01-30
>
Address Records
>
MADRONA AVE
>
1336
>
1336 MADRONA AVE 2020-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 7:32:34 AM
Creation date
1/30/2020 7:32:19 AM
Metadata
Fields
Template:
Address Document
Street Name
MADRONA AVE
Street Number
1336
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
elIPPA46/0.1 PUBLIC1ORKS PERMIT Applied: 9/20/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1809-038 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> wit-4 <br /> (425)257-8810 Public Works Fee: $65.00 <br /> 20 EP201S <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MUDALIAR SELVA L MUDALIAR SELVA L <br /> 1336 MADRONA 1336 MADRONA <br /> EVERETT, WA, 98203 EVERETT, WA, 98203 <br /> PHONE: 4252992391 PHONE: 4252992391 <br /> TAX PARCEL ID#: 00505700002102 SITE ADDRESS: 1336 MADRONA <br /> DESCRIPTION: REPAVE EXISTING DRIVEWAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 9/20/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen to schedule an inspection prior to paving and after <br /> paving. All inspections must be formally requested. Call 425-257-8881 to request an inspection. This is a voicemail <br /> inspection line. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. <br /> Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled in order to close out this permit. Call the inspection line to request a Final for this permit <br /> when all items have been completed. 425-257-8881. <br /> Public Works Permit Fee Breakdown: �� r <br /> Paving (-300SF) $45.00 <br /> PW Site Inspection $20.00 2018 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / i The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> ,1 � / 7�,r' mg expenses,or causes of action that may arise because of installation and <br /> ®/ CXJ 11 maintenance of the improvement or other right-of-way use here to applied <br /> pp •ve• for Construction (Public Works) Dat for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date pr <br /> i <br /> Approved as Constructed (PW Inspector) Sig - re o ppiicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.