My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3125 OAKES AVE 2020-01-30
>
Address Records
>
OAKES AVE
>
3125
>
3125 OAKES AVE 2020-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 9:35:25 AM
Creation date
1/30/2020 9:34:30 AM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
3125
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/10/2019 Page <br /> City of Everett <br /> 9:45:47AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1911-001 Site Address 3125 OAKES AVE BLDG A <br /> Applied 11/7/2019 Applicant Lot <br /> Approved 11/7/2019 Owner HOUSING HOPE Block <br /> Issued 11/7/2019 Contractor ALLIED CONSTRUCTION ASSOC INC Tract <br /> Parent Permit No. B1807-024 Description REMOVE&REPL BATHROOM FIXTURES AND MECH ITEMS <br /> Notes BLDG ENVELOPE COMPLIANCE LETTER REQ'D PRIOR TO FINAL(PER RCW 64.55) <br /> Scheduled Completed Tune Inspector Result Remarks • Insnector's Comments <br /> 11/8/2019 11/8/2019 PLUMB SDP OTHER consultation see (11/8/2019 12:09 PM SDP) <br /> 03-ROUGH IN notes The scope of work is to remove the <br /> bathroom fixtures,replace the floors,tubs, <br /> toilets,lays.They are not moving any <br /> plumbing in the walls except the shower <br /> valve. It is ok to do this work without a <br /> rough in inspection provided at final,the <br /> tubs are filled with water up to the overflow <br /> to test for leaks. <br /> 11/8/2019 11/8/2019 MECH 04-ROUGH SDP OTHER consultation see am preferrable.Will Swanson,Allied <br /> IN notes Construction 425-740-4843 <br /> (11/8/2019 12:16 PM SDP) <br /> The bathroom exhaust fans will require an <br /> upgrade of the fire protection.If you choose <br /> to box around the exhaust fan,please call <br /> for an inspection before you cover.If you <br /> are going to use a radiation damper,the <br /> exhaust fan can be looked at on the final <br /> inspection,please have the cover off so the <br /> inspector can see the damper in place. A <br /> construction tip sheet is scanned into the <br /> attachments. <br /> 12/5/2019 12/5/2019 PLUMB 06-FINAL DXW CORRECTION 425-640-4843 <br /> AM inspection requested <br /> (12/5/2019 2:34 PM DXW) <br /> completegrab bars and wrap for pipes under <br /> sinks. <br /> 12/5/2019 12/5/2019 MECH 06-FINAL DXW APPROVAL 425-640-4843 <br /> AM inspection requested <br /> 12/9/2019 12/9/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 12/9/2019 12/9/2019 PLUMB 06-FINAL SDP APPRVD-PERN 425-740-4843 <br /> PM inspection requested <br /> INSP12 arl lll/$YSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.