My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
506 OLYMPIC BLVD 2020-01-30
>
Address Records
>
OLYMPIC BLVD
>
506
>
506 OLYMPIC BLVD 2020-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 9:41:58 AM
Creation date
1/30/2020 9:41:48 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEI PUBL 1A/ORKS PERMIT IIIIII'' IIII Date Applied: 6/13/2019 <br /> City of Everett Permit Services PutlVorks Permit#: PW1906-026 <br /> EVERETT 3200 Cedar Street, 2"d Floor <br /> Everett, WA 98201 Associated Bldg Permit#: <br /> Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $308.73 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: 13 JUN 2019 <br /> KRETZSCHMAR JOHN REVOCABLE TRUST KRETZSCHMAR JOHN REVOCABLE TRUST <br /> 506 OLYMPIC BLVD 506 OLYMPIC BLVD <br /> EVERETT,WA,98203-2006 EVERETT,WA,98203-2006 <br /> PHONE:3104895656 PHONE:3104895656 <br /> TAX PARCEL ID#:00606200001100 SITE ADDRESS: 506 OLYMPIC BLVD <br /> DESCRIPTION: NEW PAVED DRIVEWAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 06/13/2019.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon completion of <br /> the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt,mud, rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed <br /> on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires <br /> use of the right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: Se 1 rte' <br /> 0 <br /> Paving(XXXXSF) $45.00 <br /> PW Site Inspection $20.00 JUN 1 3 2019 <br /> Stormwater System Developement Fee $243.73 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> j �— r3 2O�_ causes of action that may arise because of installation and maintenance of <br /> -� the improvement or other right-of-way use here to applied for and further <br /> Approved for Cons ruction(Public Works) gate agrees to remove same upon notice from the City and to replace public <br /> dApiwo h- .� 64. —?17 <br /> ✓r <br /> FINAL INSPECTION Date =� ��� � ' <br /> Approved as Constructed(PW Inspector) ,nature of Apia,. Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE.STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.