Laserfiche WebLink
2. The rezone shall not be recorded for the subject property, or permits <br /> and business licenses issued for uses not allowed under B-1 zone <br /> until such time as the concomitant agreement is signed by all owners <br /> of the subject property and all applicable conditions of that <br /> concomitant agreement are fulfilled and/or warranted, as appropriate, <br /> to the satisfaction of the Public Works Department and the Planning <br /> Department. Certain conditions may be deferred until building permit <br /> applications are approved. Specific conditions and the timing of <br /> their implementation will be identified in this concomitant agreement. <br /> 3. All applications for Building Permits for substantial development as <br /> determined by the City of Everett Building Official or Planning <br /> Director shall be subject to a detailed administrative site plan <br /> review process. <br /> Detailed drawings in accordance with City Design and Construction <br /> Standards shall be submitted to the Public Works Department showing <br /> site parking layout, landscaping, utilities, storm drainage, <br /> temporary construction erosion control and all required improvements <br /> in the public right-of-way. Public Works Department and Planning <br /> Department approval of these drawings is required prior to any <br /> building permits being issued. All required improvements shall be <br /> completed, approved and warranted or bonded before the Occupancy <br /> Permit is issued. <br /> 4. Access <br /> a. Future development of the subject property may require <br /> improvements to the I-5 frontage street abutting the rezone <br /> area and El Capitan Way. <br /> Improvements will include, but are not limited to, curb, <br /> gutter, sidewalk, street widening and drainage control. <br /> b. The owner is required to sign a Local Improvement District <br /> Covenant for street frontages not being improved prior to <br /> recording of the rezone on the subject property. <br /> 5. Storm Water Drainage <br /> A detention system shall be provided which is designed to serve the <br /> entire rezone area. The maximum outflow rate of the detention <br /> facility shall not exceed the capacity of the existing 12 inch storm <br /> drain. The detention facility shall be sized to detain the runoff <br /> from a 25-year storm for the entire tributary area of the detention <br /> pond, under existing land use conditions, per City standards. The <br /> existing detention pond shall be retained and modified to incorporate <br /> approximately elevation 416 or the equivalent storm water capacity as <br /> determined by the Public Works Department. <br /> Costs of improvements to the storm drainage system shall be borne by <br /> the property owners in the rezone area benefitting from the storm <br /> drainage improvements. Proportionate improvements to the storm <br /> drainage system shall be constructed prior to recording the rezone on <br /> each affected property. Easements for the storm drainage system <br /> shall be executed prior to recording the rezone on the subject <br /> property. <br /> Drainage facilities for any property not served by the existing pond <br /> shall be required as a condition of building permit approval per City <br /> Standards. <br /> -2- <br />