My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/05/14 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/05/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 10:50:54 AM
Creation date
1/30/2020 10:49:15 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C ti <br /> Proposal No.14131 GeoTest Services Inc. April22,2014 <br /> Arlington Branch <br /> PROPRIETARY ANCHORS <br /> Periodic inspection of electrical equipment for emergency standby power. <br /> Periodic inspection of other electrical or mechanical equipment over 1,000 lb.on floors and roof. <br /> Periodic inspection of anchorage of ducts greater than 6 s.f...in cross section. <br /> Periodic inspection of pipelines greater than 8 inches in diameter. <br /> Test/Inspection Item Visits Time in Number of Unit Rate Total <br /> Man-Hours Tests <br /> Proprietary Anchor Inspections 700 $50 $35,000 <br /> Subtotal $35,000 <br /> STRUCTURAL.STEEL <br /> Prior to erection verify materials,weld procedures and welder qualifications. <br /> Periodic inspection of snug tight joints and identification markings. <br /> Continuous inspection of complete and partial joint penetration groove welds,multi-pass fillet welds,and single-pass fillet welds>5/16". <br /> Periodic inspection of single-pass fillet welds less Than or equal to 5/16",floor and roof deck welds,and verification of weldability of reinforcing <br /> steel. <br /> Continuous inspection of reinforcing steel-resisting flexural and axial forces in boundary elements of special reinforced concrete shear walls <br /> and shear reinforcement and form saver reinforcing couplers. <br /> Time in Number of <br /> Test/Inspection item Visits Unit Rate Total <br /> Man-Hours Tests <br /> Structural Steel Inspections 200 $50 $10,000 <br /> *NDE Inspection 40 $80 3,200 <br /> Subtotal $13,200 <br /> *NDE inspection will be subcontracted to Mistras. <br /> PAINT COATING INSPECTIONS <br /> Perform Paint Coating Inspections per the Approved Plans and Specifications. <br /> Item Time in Number of <br /> Test/Inspection <br /> Visits Man-Hours Tests Unit Rate Total <br /> Coating Inspections 200 $50 $10,000 <br /> Subtotal $10,000 <br /> OTHER <br /> Test/Inspection Item Visits Hours Number of Unit Rate Total <br /> Tests <br /> Project Management 100 $80 $8,000 <br /> Mileage(-350 trips x 30 miles total) 350 $0.56 $5,880 <br /> Contingency(additional funds for discretionary use by owner for testing services) $12,010 <br /> Subtotal ( $25,890 <br /> ITotal Estimate $252,215 <br /> Page 2 of 2 <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.