Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA I l'EM COVER SHEET <br /> PROJECT TITLE: <br /> Professional Services Briefing COUNCIL BILL# <br /> Agreement with GeoTest Proposed Action Originating Department Public Works <br /> Services, Inc. for Quality Consent Contact Person John Nottingham <br /> Assurance Inspection and Action Phone Number (425)257-8872 <br /> Testing for the Water Pollution First Reading FOR AGENDA OF 5/14/14 <br /> Control Facility Phase Cl Second Reading <br /> Expansion Third.Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council PresidentA <br /> Location Preceding Action Attachments Department(s)Approval <br /> Smith Island None Contract Public Works,Legal <br /> Amount Budgeted $64,000,000 Fund 339 <br /> Expenditure Required $252,215 WO#UP-3412 <br /> $64,000,000 <br /> - $251,215 (GeoTest Contract) <br /> • <br /> Budget Remaining $28,886,076 - $31,312,618 (IMCO GC/CM Contract) <br /> - $3,550,091 (Future Engineering &City Staff) <br /> Additional Required -0- <br /> • <br /> DETAILED SUMMARY STATEMENT: <br /> The Professional Services Agreement with GeoTest Services,Inc., of Arlington WA,is for the provision of <br /> quality assurance inspection and testing support services as required by the Phase C project design plans and <br /> specifications. These services represent the certification or performance of inspections and testing that are <br /> required by building codes and/or national standards.These services are generally outside the capabilities of <br /> City inspection personnel and must be performed by qualified inspectors. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with GeoTest Services,Inc. for Quality <br /> Assurance Inspection and Testing for the Water Pollution Control Facility Phase Cl Expansion, in the <br /> amount of$252,215. <br /> 3 <br />