My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3020 RUCKER AVE SNO CO HEALTH DISTRICT 2020-01-30
>
Address Records
>
RUCKER AVE
>
3020
>
SNO CO HEALTH DISTRICT
>
3020 RUCKER AVE SNO CO HEALTH DISTRICT 2020-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:43:38 AM
Creation date
1/30/2020 11:42:51 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3020
Tenant Name
SNO CO HEALTH DISTRICT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2601 4th Ave <br /> Suite 400 <br /> Seattle,WA 981121 <br /> (206)494-9400 <br /> Harris Group www.harrisgroup.com <br /> November 6,2019 <br /> City of Everett &t& C01§1 <br /> Permit Services <br /> NOVfi <br /> 2 2 2019 <br /> Reference: Plan Check Number:M1906-045 CITy OF EVERETT <br /> Owner:Snohomish Health District mit Services <br /> Job Address:3020 Rucker Ave <br /> HGI Project Number 0070565.00 <br /> The responses to the City of Everett permit review comments dated June 19,2019 are listed below: <br /> Comment#1: <br /> Two full size structural drawings have been included with this submittal.These drawings include a framing plan indicating the <br /> location of the larger MAU units with required framing and associated detail sheet. From Harris Group's calculations all other <br /> units do not require additional framing and are not shown on the sealed structural drawings.A drawing showing all unit <br /> locations and weights has been added to the structural calculations. <br /> Comment#2: <br /> The structural calculations have been updated with additional joist checks including joists supporting both new and existing <br /> units.A framing key plan has been added to the calculations. <br /> Comment#3a: <br /> The additional Trane RTU has been added to the drawings with note indicating the required curb. <br /> Comment#3b: <br /> Connection details have been added. <br /> Comment#4: <br /> See response to comment#2. <br /> Comment#5: <br /> Connection detail has been added. <br /> Please let us know if you have any questions. <br /> Sincerely, <br /> Alex Warner [ElIVE <br /> NOV 18 2019 <br /> CITY OF EVERETT <br /> Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.