My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3020 RUCKER AVE SNO CO HEALTH DISTRICT 2020-01-30
>
Address Records
>
RUCKER AVE
>
3020
>
SNO CO HEALTH DISTRICT
>
3020 RUCKER AVE SNO CO HEALTH DISTRICT 2020-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:43:38 AM
Creation date
1/30/2020 11:42:51 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3020
Tenant Name
SNO CO HEALTH DISTRICT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 Washington State Energy Code Compliance Forms for Commercial,R2 and R3 over 3 stories and all R1 <br /> Mechanical Summary MECH-SUM <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> Project Information Project Title: Snohomish Health-IRS 3020 Rucker Date 6/13/2019 <br /> Applicant Information. Provide contact information for individual who can respond to For Building Dept.Use <br /> inquiries about compliance form information provided. <br /> Company Name: Evergreen State Heat&A/C <br /> Company Address: 2120 Pacific Ave,Everett,WA 98201 <br /> Applicant Name: Mark Payne <br /> Applicant Phone: 425-252-3114 <br /> Project Description ❑ New Building ❑ Building Addition ❑ Tenant Improvement 0 System Retrofit ❑ No System Changes <br /> Briefly describe mechanical systems in Replacing 5X 3 ton heat pump RTU, 13 splits and 2 make-up air units.All with same capacity. RTU'sare like for <br /> the text box provided like,the 13 splits are being replaced with a Hyper heat simatanious-heat and cool. Removing 13 ODU and <br /> ❑ Total Bldg Performance(TBP) replacing with 2 units in same location as 3-4 removing-new unit weighs less.Make up air will be replaced with <br /> 10 ton gas packs with full economizer controls withthe ability to supply 150%of calcuated fresh air requirement. <br /> This path includes all mandatory Unit is also set with demand ventlation and Co2 control. <br /> provisions per C401.2 Option 2. <br /> MECH-SUM,MECH-CHK,and C407 <br /> Energy Analysis forms required. <br /> O Load calculation summary MECH-LOAD-CALC Form <br /> Design Load Calculations Provide design load calculations for all mechanical systems and equipment serving the building heating,cooling or <br /> ventilating needs.If a load calculation summary is provided with the permit documents that includes all applicable <br /> compliance information then the MECH-LOAD-CALC form is not required. <br /> • Mechanical Plans 0 MECH-EQ Forms(TBD) <br /> Mechanical Schedules Indicate location of equipment compliance information.If provided on plans then MECH-EQ forms are not required, <br /> however,include on plans all applicable compliance information listed in MECH-EQ tables. <br /> O DOAS is required per C403.6 effective July 1,2017(office,retail,education,library and fire station occupancies) <br /> All occupied,conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does <br /> not require space conditioning fan operation.Space conditioning fans cycled off when no heating or cooling is required. <br /> Dedicated Outdoor Air 0 Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS(C403.6,Exception 1) <br /> O Ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS(C403.6,Exception <br /> System Requirements and <br /> High Efficiency VAV ❑ DOAS included in project,although not required(occupancy not office,retail,education,library or fire station) <br /> Alternate ❑ DOAS related allowances included in project: <br /> O Prescriptive vertical fenestration maximum area allowance increased to 40%per C402.4.1.4 with 100%of <br /> conditioned floor area in building served by DOAS. <br /> O Exception to air economizer per C403.3 Exception 1,include MECH-ECONO form. <br /> O Project includes HVAC air distribution systems that provide heating and/or cooling <br /> If yes,provide a MECH-FANSYS-SUM form. <br /> Fan Power <br /> 0 For one or more systems,the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. <br /> If yes,provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. <br /> Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. <br /> O Hydronic chilled water 0 Water-loop heat pump 0 No hydronic systems <br /> HVAC Hydronic Systems <br /> 0 Hydronic heating water 0 Geothermal <br /> O C406.2 More efficient HVAC equipment and fan systems <br /> Requires 90%of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9)or air-to-water heat <br /> pumps and heat recovery chillers.All equipment listed in tables C403.2.3(1)-(7)must be 15%more efficient than <br /> minimum requirements.All stand alone supply,retum,and exhaust fans over 1 hp must have FEQ Z 71 and must be <br /> C406 Additional Efficiency selected within 10%of maximum total or static pressure. <br /> C406.6 Dedicated outdoor air system(DOAS) <br /> Options-Mechanical Requires 90%of conditioned floor area to be served by a DOAS per C403.6 that delivers required ventilation air in a <br /> manner that does not require space conditioning fan operation. <br /> O C406.7 Reduced energy in service water heating <br /> Requires 90%of floor area be in occupancy types listed in C406.7.1 and that 60%of annual hot water energy use be <br /> provided by heat pump,waste heat recovery or solar water-heating systems. <br /> e4.); <br />
The URL can be used to link to this page
Your browser does not support the video tag.