Laserfiche WebLink
wz..r <br /> Run Date: 5/9/2014 City of Everett-Public Works Department Cutoff Date: 4/11/2014 <br /> Time: 9:18 AM Contract Estimate Voucher - i <br /> . <br /> For Work Order#3545 Contractor: PETERSEN BROSINC • <br /> Project: 311 Estimate#4 <br /> CITYWIDE GUARDRAIL 2008 EAST VALLEY HIGHWAY <br /> IMPROVEMENTS <br /> WO 3545 BID:$521,951.08 SUMNER WA 98390 <br /> TOTAL BID:$521,951.08 • <br /> Unit Plan Total Previous Present Total Previous Present i <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 16,175.00 1.00 1.0000 1.0000 0.0000 16,175.00 16,175.00 0.00 <br /> 0002 Temporary Traffic Control LS 8,867.40 1.00 1.0000 1.0000 0.0000 8,867.40 8,867.40 0.00 <br /> 0003 Flaggers&Spotters HR 45.30 448.00 919.0000 919.0000 0.0000 41,630.70 41,630.70 0.00 <br /> 0004 Removing Guardrail LF 3.85 6,200.00 8,214.5000 7,361,0000 853.5000 31,625.83 28,339.85 3,285,98 <br /> 0005 Removing Guardrail Anchor EA 185.00 8.00 9.0000 9.0000 0.0000 1,665.00 1,665.00 0.00 <br /> 0006 Removing Extruded Curb LF 5.40 180.00 207.0000 207.0000 0.0000 1,117.80 1,117.80 0.00 <br /> 0007 Beam Guardrail Type-1 8'Long LF 27.10 6,133.00 7,173.1300 7,173.1300 0.0000 194,391.82 194,391.82 0.00 <br /> • <br /> 0008 Beam Guardrail Transition Type 1 EA 1,685.00 5.00 4.0000 4.0000 0.0000 6,740.00 6,740,00 0.00 <br /> 0009 Beam Guardrail Transition Type 4 EA 1,675.00 10.00 10.0000 10.0000 0.0000 16,750.00 16,750.00 0.00 r"-- <br /> . 0010 <br /> "- <br /> 0010 Beam Guardrail Flared Terminal EA 1,755.00 6.00 7.0000 7.0000 . 0.0000 12,285.00 12,285.00 0.00 '- <br /> 0011 Beam Guardrail Non-Flared Terminal EA 2,260.00' 33.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0012 Beam Guardrail Anchor Type 1 EA 710.00 36.00 38.0000 38.0000 0.0000 26,980.00 26,980.00 0.00 <br /> 0013 Extruded Curb LF 17.35 180.00 213.6000 213.6000 0.0000 3,705.96 3,705.96 0.00 <br /> 0014 Raising Existing Beam Guardrail LF 7.55 1,026.00 87.5000 87.5000 0.0000 660.63 660.63 0.00 <br /> 0015 Thrie Beam Retrofit Baluster Rail LF 44.00 720.00 722.0000 722.0000 0.0000 31,768.00 31,768.00 0.00 <br /> 0016 Permanent Signing LS 16,896.18 1,00 1.0000 1.0000 0.0000 16,896.18 16,896.18 0.00 <br /> 0017 Profiled Plastic Wide Line LF 14.00 300.00 300.0000 300.0000 0.0000 4,200.00 4,200.00 0.00 <br /> 0018 Unanticipated Underground Conflict EST 1.00 10,000.00 23,519.6600 23,519.6600 0.0000 23,519.66 23,519.66 0.00 <br /> 0019 Potholing EST 1.00 10,000.00 7,090.7100 7,090.7100 0.0000 7,090.71 7,090.71 0.00 <br /> 0020 Reimbursement of Third Party Damage EST 1,00 5,000.00 2,536.5700 2,536.5700 0.0000 2,536.57 2,536.57 0.00 <br /> 0021 Private Improvement Restore&Modifications EST 1.00 5,000.00 1,316.4000 1,316.4000 0.0000 1,316.40 1,316.40 0.00 <br /> 0022 SPCC Plan LS 630.00 1.00 1.0000 1.0000 0.0000 630.00 630.00 0.00 <br /> 0023 Beam Guardrail Anchor Type 5 EA 915.00 5.00 1.0000 1.0000 0.0000 915.00 915.00 0.00 <br /> 0101 Test Level-2 SKT End Terminal EA 1,530.00 32.00 32.0000 32.0000 0.0000 48,960.00 48,960.00 0.00 <br /> 0102 Addtnl.Potholing&Unantcpd Undrgrnd Cnflcts FA 1.00 15,000.00 5,877.8300 5,877.8300 0.0000 5,877.83 5,877.83 0.00 <br /> i <br />