My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3311 WAVE DR 2020-01-30
>
Address Records
>
WAVE DR
>
3311
>
3311 WAVE DR 2020-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:31:59 PM
Creation date
1/30/2020 3:31:14 PM
Metadata
Fields
Template:
Address Document
Street Name
WAVE DR
Street Number
3311
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/9/2020 Page <br /> 12.A5.08P1VP City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1812-008 Site Address 3311 WAVE DR <br /> Applied 12/19/2018 Applicant Lot <br /> Approved 1/28/2019 Owner LESYNA MARK WILLIAMS&MADSEN ROBIN LY Block <br /> Issued 2/1/2019 Contractor OWNER Tract <br /> Parent Permit No. Description REPLACE WALLS AROUND STAIRWELL WITH RAILINGS/RI <br /> Notes ROOM WALL WITH SINK/WALL OFF FRONT ENTRY CLOSET AND INSTALL TUB AND <br /> EXHAUST FAN IN GUEST BATHROOM/FULL KITCHEN REMODEL/MOVING WALLS AND <br /> APPLIANCES/BUILD PANTRY/RELOCATE MASTER BATH/REMOVE WING WALL AND <br /> SHOWER AND REPLACE <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 5/14/2019 5/14/2019 BLDG DWF PARTIAL APPR Walls only,need mechanical RI sign off <br /> 11-INSULATION before covering ceilings. <br /> 5/14/2019 5/14/2019 BLDG DWF PARTIAL APPR Ok to cover walls only. <br /> 08-FRAMING Need Mechanical RI sign off ceilings before <br /> cover. <br /> 5/21/2019 5/21/2019 MECH 04-ROUGH SDP PARTIAL APPR eTRAKiT Inspection 5/20/2019 4:50 PM Mark Lesyna <br /> IN Request vents thru attic for kitchen&bath <br /> Contact Name:Mark Lesyna <br /> Site Address:3311 WAVE DR <br /> Phone:4259314465 <br /> e-Mail:Marklesyna@hotmail.com <br /> (5/21/2019 1:32 PM SDP) <br /> Bath exhaust is installed but must be <br /> insulated to R-4 min. <br /> Stove exhaust roof jack is installed but the <br /> duct is not as yet.Recall when ready.Duct <br /> must be insulated to R-4 min. <br /> 5/28/2019 5/28/2019 MECH 04-ROUGH SDP CORRECTION eTRAKiT Inspection 5/24/2019 5:51 PM Mark Lesyna <br /> IN Request vents for bath&kitchen through attic <br /> Contact Name:Mark Lesyna <br /> Site Address:3311 WAVE DR <br /> Phone:4259314465 <br /> e-Mail:Marklesyna@hotmail.com <br /> (5/28/2019 2:51 PM SDP) <br /> Re-call the inspection when the duct work <br /> is installed.Stove exhaust must meet the <br /> following: <br /> 1)6'minimum in diameter <br /> 2)Solid ducting with a smooth interior <br /> 3)The joints are sealed with tape or mastic <br /> 4)The duct must be insulated to R-4 min. <br /> 7/12/2019 7/12/2019 MECH 04-ROUGH SDP CORRECTION eTRAKiT Inspection 7/11/2019 8:54 PM Mark Lesyna <br /> IN Request Range hood exhaust corrected issues found <br /> by Sheltie during 5/28 inspection <br /> Contact Name:Mark Lesyna <br /> Site Address:3311 WAVE DR <br /> Phone:4259314465 <br /> e-Mail:Marklesyna@hotmail.com <br /> (7/12/2019 3:17 PM SDP) <br /> The stove exhaust must be solid ducting <br /> from the range hood exhaust to the roof <br /> jack <br /> 8/9/2019 8/9/2019 MECH 06-FINAL SDP APPROVAL corrections complete <br /> -ok final <br /> 12/16/2019 12/16/2019 PLUMB 06-FINAL SDP APPROVAL INSPECTED <br /> UNDER P1810-016 <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.