My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5816 WETMORE AVE 2020-01-31
>
Address Records
>
WETMORE AVE
>
5816
>
5816 WETMORE AVE 2020-01-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 7:31:49 AM
Creation date
1/31/2020 7:30:27 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
5816
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/3/2019 <br /> City of Everett Page 1 /2 <br /> 1:03:29PM / <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1712-012 Site Address 5816 WETMORE AVE <br /> Applied 12/15/2017 Applicant BONNER ROBERT Lot <br /> Approved 3/8/2018 Owner JAMES VIRGINIABIGGERS CHARLES Block <br /> Issued 3/9/2018 Contractor OWNER TO FINISH WORK 1/21/19 Tract <br /> Parent Permit No. F1709-002 Description REBUILD KITCHEN/BATHROOM/REC ROOM/3 BEDROOMS <br /> Notes (4/20/2018 8:01 AM TKJ) <br /> Added new foundation to scope of work <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 3/21/2018 3/21/2018 BLDG TMB OTHER Consultation: <br /> 01-CONSULTATIO 1.OK to place structural fill within the <br /> abandoned septic tank for solution to void <br /> at this location. <br /> 2.Please present a proposal to reuse or <br /> remove the masonry fireplace and chimney. <br /> (This struture has cracking and <br /> deterioration). <br /> Removal is highly recommended. <br /> 3/26/2018 3/26/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 3/26/2018 3/26/2018 BLDG 04-UFER KMK APPROVAL Adding UFER <br /> GROUND ground as discussed <br /> 4/5/2018 4/5/2018 BLDG DWF OTHER See notes Recommend replacement of existing <br /> 03-FOUNDATION foundation. <br /> Not acceptable for support of new structure <br /> as engineer recommended. <br /> Also post/existing beam need to be <br /> replaced. <br /> 4/18/2018 4/18/2018 BLDG DWF APPROVAL As per revised plan. <br /> 03-FOUNDATION OK for concrete <br /> 5/17/2018 5/17/2018 BLDG DWF APPROVAL 2nd visit-OK to <br /> 05-UNDERFLOOR cover <br /> 8/2/2018 8/2/2018 BLDG DWF APPROVAL Shear nailing-exterior only <br /> 07-EXTERIOR SWI OK to cover <br /> 8/22/2018 8/22/2018 BLDG DWF CORRECTION Not ready <br /> 08-FRAMING <br /> 9/21/2018 9/21/2018 MECH 04-ROUGH SDP APPROVAL <br /> IN <br /> 10/5/2018 10/5/2018 PLUMB SDP PARTIAL APPR 1.Methods and materials OK. <br /> 03-ROUGH IN 2.System does not appear to be on test, <br /> please test and recall. <br /> 10/8/2018 10/8/2018 PLUMB SDP CORRECTION Not on test <br /> 03-ROUGH IN Not ready <br /> Waste and water needs to be on test for <br /> inspection approval. <br /> 10/8/2018 10/8/2018 BLDG DWF APPRVD-PERK Not ready <br /> 08-FRAMING <br /> 10/19/2018 10/19/2018 PLUMB SDP APPROVAL As noted Left affidavit for test-have on site for final <br /> 03-ROUGH IN inspection. <br /> 10/23/2018 10/23/2018 BLDG TMB APPROVAL OK to insulate <br /> 08-FRAMING <br /> 10/23/2018 10/23/2018 PLUMB TMB APPROVAL Received test <br /> 03-ROUGH IN affidavit-waste/ <br /> vents <br /> 1/31/2019 1/31/2019 ADMIN OTHER TAH OTHER OWNER (1/31/2019 11:53 AM TAH) <br /> FINISHING WORK SEATTCG851JT-SEATTLE CONST <br /> GROUP IS NO LONGER THE <br /> CONTRACTOR ON SITE-OWNER TO <br /> FINISH WORK THEMSELVES <br /> 5/17/2019 5/17/2019 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> INSP12 ClirWS YS SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.