Laserfiche WebLink
� _ _ . _ . <br /> � -- __ <br /> �� <br /> 3 4 5 <br /> 1 2 <br /> D <br /> � � <br /> e� <br /> � � � � � • , <br /> . . � .. <br /> • . • ' I <br /> � � <br /> GENERAL NOTES ABBREVIATIONS <br /> HnRGIS `� , <br /> 1. PERFORM WORK IN ACCORQANCE WITH APPLICABLE 8P8C 8-POSITION, 8-CONDUCTOR PNL PANEL <br /> NATIONAL AND STATE CODES AS AMENDED LOCALLY PP PATCH PANEL <br /> mechanicai 1201 third avenue,suite 600 <br /> AND ENFORCED BY THE AHJ, ABV ABOVE electrical <br /> AC AIR CONDITIONING;ALTERNATING CURRENT PVC POLYVINYL CHLORIDE telecommunications seattle,washington 98101 <br /> 2. OBTAIN AND PAY FOR PERMITS REQUIRED FOR AFF ABOVE FINISHED FLOOR security t 206.4�78.3376 w hargis.biz - <br /> INSTALLATION OF WORK.ARRANGE AND SCHEDULE energy <br /> REQUIRED INSPECTIONS. AFG ABOVE FINISHED GRADE <br /> AWG AMERICAN WIRE GAUGE RCP REFLECTED CEILING PLAN <br /> 3. DRAWINGS ARE DIAGRAMMATIC IN NATURE. PROVIDE REC RECEPTACLE ' � • ' ' . <br /> COMPONENTS AS REQUIRED FOR A COMPLETE BEP BUILDING ENTRANCE PROTECTION REF REFER TO <br /> OPERATtONAL SYSTEM WHETHER OR NOT BLDG BUILDING <br /> SPECIFICALLY SHOWN ONTHE DRAWINGS. REV REVISION � � �# <br /> 4. DEVICE ROUGH-IN LOCATIONS SHOWN ARE G CONDUIT RM ROOM ' <br /> APPROXIMATE. CAT CATEGORY RMFC RACK MOUNT F�BER CABINET `. � <br /> C CATV COMMUNITY ANTENNA TELEVISION C , <br /> 5. COMPLETION OF WORK SHAL� BE EXECUTED IN CONTRACTOR-FURNISHED RU RACK UNIT <br /> ACCORDANCE WITH THE PROJECT SCHEDULE. CFCI CONTRACTOR-INSTALLED f <br /> SCHEDULE INSTALLATION WITH OTHER TRADES TO SNT SHEET � <br /> ENSURE PROJECT MILESTONES ARE MET. (E) EXISTING <br /> SM SINGLEMODE L '�29/t"� <br /> EIA ELECTRONIG INDUSTRIES ASSOCIATION SMFC SURFACE MOUNTED FIBER CABINET <br /> NON-STRUCTURAL ELECTRICAL EMT ELECTRICAL METALLIC TUBING SMR SURFACE METAL RACEWAY <br /> COMPONENT NOTES ' � • � ' • ' <br /> EQUIP EQUIPMENT SPEC SPECfFICATIONS <br /> 1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM F FUSE; DEGREES FAHRENHEIT TBB TELECOMMUNICATIONS BONDING BACKBONE S i I ve r L a ke E S 2 018 <br /> THE 2015 INTERNATIONAL BUILDING CODE AND FROM TEL TELEPHONE � <br /> THE AMERICAN SOCIETY OF CIVIL ENGINEERS(ASCE} FA FIRE ALARM TELCO TELEPHONE COMPANY P O 1 t��I✓I�iS <br /> STANDARD 7-05. THE CONTRACTOR SHALL REFER TO FAAP FIRE ALARM ANNUNCIATOR PANEL ' y <br /> THE ABOVE FOR AQDITIONAL INFORMATION, TGB TELECOMMUNICATIONS GROUNDING BUSBAR <br /> EXCEPTIONS,AND FURTHER DESCRIPTIONS. THE FACP FIRE ALARM CONTROL PANEL TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION FO R <br /> CONTRACTOR SHALL ADHERE TO REQUIREMENTS AND FURNISHED BY OWNER INSTALLED BY <br /> AS SUCH, SHALL BE INCLUDED WITHIN BID.ALSO REFER FOIC CONTRACTOR TELECOMMUNICATIONS MAIN GROUNDING � ` <br /> TO SPECIFICATIONS. TMGB gUSBAR Eve rett P u b I i c <br /> FO10 FURNISHED BY OWNER INSTALLED BY OWNER TR TELECOMMUNICATIONS ROOM <br /> 2. 2015 IBC, 1G13.1, SCOPE:ARCHITECTURAL, MECHANICAL, FSD FIRE SMOKE DAMPER TTB TELEPHONE TERMINAL BOARD h <br /> ELECTRICAL,AND NON-STRUCTURAL COMPONENTS N TELEVISION S CI I OO I S , <br /> THAT ARE PERMANENTLY ATTACHED TO STRUCTURES <br /> AND THEIR SUPPORTS AND ATTACHMENTS SHALL BE G GROUND TYP TYPICAL AT <br /> DESIGNED AND CONSTRUCTED TO RESIST THE <br /> EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE GFI GROUND FAULT INTERRUPTER <br /> WITH ASCE 7-10, EXCLUDING CHAPTER 14 AND GFCI GROUND FAULT CIRCUIT INTERRUPTER UG UNDERGROUND � 2�� 5 BOthGII EVerett HW�/ �. <br /> APPENDIX 11A. <br /> GND GROUND UL UNDERWRITERS LABORATORIES Everett WA 98208 � � <br /> 3. DIVISION 26,27&28 RESPONSIBILITIES: UON UNLESS OTHERWISE NOTED <br /> A. HANGERS AND SEISMIC BRACING FOR HC HORIZONTAL CROSS CONNECT UPS UNINTERRUPTIBLE POWER SUPPLY <br /> ELECTRICAL SYSTEMS SHALL BE DESIGNED AND UTP UNSHIELDED TWISTED PAIR B u I L D 1 N G P E RM I T <br /> SPECIFIED BY DIVISION 26, 27&28. DIVISION 26, IDF INTERMEDIATE DISTRIBUTION FRAME Q <br /> 27&28 SHALL REFER TO THE ELECTRICAL V VOLTS O3/ZO/ZO� V g <br /> DRAWINGS FOR LOCATIONS OF EQUIPMENT AND <br /> B • <br /> ELECTRICAL SYSTEMS. J JUNCTION VA VOLT AMPERES <br /> B. DNISION 26,27&28 SHALL GOORDINATE THE This drawing is: <br /> SUPPORT SYSTEMS AND DESIGN LOADS FOR VP VIDEO PROJECTOR 1. Copyright 2018 Dykeman, Inc. <br /> HUNG RACEWAYS AND OTHER ELECTRICAL KCMIL THOUSAND CIRCULAR MILS VPP VOICE PATCH PANEL 2. The Architect's Instrument of Professional Service. <br /> SYSTEMS (INCLUDING COMBINED MULTIPLE 3. For use on this project only. Obtain Architect's �. <br /> RACEWAY RUNS)WITH THE PORTABLE written permission for any other use or reproduction. <br /> MANUFACTURER. LAN LOCAL AREA NETWORK W WATT;WIRE �;`¢ <br /> LEC LOCAL EXCHANGE CARRIER W/ WITH � � � <br /> LTG LIGHTING W/O WITHOUT <br /> WA WORKSTATION AREA ZO� H—003 . <br /> MC MAIN CROSS CONNECT; METAL CLAD(CABLE) <br /> WAN WIDE AREA NETWORK <br /> MDF MAIN DISTRIBUTION FRAME N/qp WIRELESS ACCESS POINT <br /> • <br /> MH MANHOLE �/G WIRE GUARD ' <br /> MIN MINIMUM <br /> MM MULTIMODE �NP WEATHERPROOF MARK DATE DESCRIPTION <br /> MPOE MAIN POINT OF ENTRY <br /> MPOP MAIN POINT OF PRESENCE XMFR TRANSFORMER <br /> �� <br /> MTD MOUNTED <br /> {N) NEW <br /> NEC NATIONAL ELECTRICAL CODE . <br /> NEMA NATIONAL ELECTRICAL MANUFACTURERS <br /> ASSOCIATION <br /> NIC NOT IN CONTRACT <br /> . . � . <br /> OFC OPTICAL FIBER CABLE PRINCIPAL IN GHARGE: � <br /> OFCt OWNER-FURNISHED CONTRACTOR-INSTALLED PROJECT MANAGER: � <br /> OFOI OWNER-FURNISHED OWNER-INSTALLED PROJECT ARCHITECT: � <br /> �� <br /> JOB CAPTAIN: � <br /> OSP OUTSIDE PLANT <br /> A <br /> A � � <br /> Electrical General . � <br /> Notes & Abbreviations <br /> . , : <br /> �, <br /> 1 . : <br /> 2 3 4 5 " <br /> 1 <br /> � <br />