My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/01/29 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/01/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2020 9:44:34 AM
Creation date
2/4/2020 9:34:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/29/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br /> Project: Watermain Replacement"S" Project <br /> Contractor: Reece Construction Company <br /> Work Order No. PW 3664 <br /> The above mentioned project was constructed per the plans and specifications and to <br /> the satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the <br /> contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> 1— lG- zozc? <br /> P lic Works Director Date <br /> Ryan Sass <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Cassie Franklin <br /> Attest: <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> Jim Iles, City Attorney <br /> Date 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.