My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City of Lake Stevens 1/31/2020
>
Contracts
>
Agreement
>
Interlocal Agreements
>
City of Lake Stevens 1/31/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:09 AM
Creation date
2/4/2020 11:46:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
City of Lake Stevens
Approval Date
1/31/2020
Council Approval Date
1/29/2020
Department
Public Works
Department Project Manager
Grant Moen
Subject / Project Title
91st Avenue SE Roadway Extension
Tracking Number
0002204
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br /> Cost Sharing-Replacement and Relocation of Everett Transmission Lines <br /> Due to Extension of 91st Ave SE by Lake Stevens <br /> TL2 TL3 TL4 Total <br /> Background Data: <br /> Capital Cost Estimate(2020 dollars) $ 302,000 $ 302,000 $ 302,000 $ 906,000 <br /> Pipe Material Concrete Steel Concrete <br /> Date of Original Construction 1993 1936 1960 <br /> Age in 2020(Yrs) 27 84 60 <br /> Tentative agreement:share cost based on remaining life of transmission lines(TLs). <br /> Everett Analysis of Cost Share: <br /> Assumed Total Useful Life(Yrs) 100 100 100 <br /> Remaining Useful Life(Yrs) 73 16 40 <br /> Everett Cost Share: <br /> Present Value of Construction $ 302,000 $ 302,000 $ 302,000 $ 906,000 <br /> Remaining Useful Life 73 16 40 <br /> Present Value-Everett Cost Share $ 81,540 $ 253,680 $ 181,200 $ 516,420 <br /> Everett%of Total 27% 84% 60% 57% <br /> Present Value-Lake Stevens Cost Share $ 220,460 $ 48,320 $ 120,800 $ 389,580 <br /> Lake Stevens%of Total 73% 16% 40% 43% <br /> Reconciliation $ 302,000 $ 302,000 $ 302,000 $ 906,000 <br /> Lochner/Murraysmith Design Contract,Supplement 3 <br /> • All Tasks of the Supplment 3 Murraysmith(transmission line subconsultant)scope of work fees(since they pertain <br /> directly to the Transmission Line portion of the work)are eligible for cost share per the percentages indicated above. <br /> • Task 2(Tasks 2.1 through 2.3)of the Lochner Supplement 3 Scope of Work fees(pertain to the Transmission Line <br /> relocation design)are eligible for cost share per the percentages indicated above. <br /> • Task 3 and Task 4 of the Lochner Supplement 3 Scope of Work fees(pertain to roadway design)are NOT eligible for cost share. <br /> • Task 1 and Task 5 of the Lochner Supplement 3 Scope of Work fees pertain to both transmission line and roadway work. <br /> 10%of the total of the Task 1 and Task 5 fees pertain to transmission line work and are eligible for cost share. <br /> Example: Everett cost share = 0.10*0.57*Task 1 and Task 5 Lochner fees <br />
The URL can be used to link to this page
Your browser does not support the video tag.