Laserfiche WebLink
Permit 2019-04 <br /> 6. The Applicant is responsible for obtaining and compliance with all state, county and federal <br /> permits and environmental regulations: any omissions, penalty, or fines for non-compliance <br /> are solely the responsibility of the Applicant. <br /> 7. The Applicant has full responsibility for compliance with all safety rules and regulations.The <br /> presence of the City representative in no way implies City liability for the activities of the <br /> Applicant and Contractor while working on City property or easement. <br /> 8. The Applicant and Contractor will defend, indemnify, save and hold the City of Everett <br /> harmless for any claim, lawsuit, action, or judgment arising from, or relating to, its work on <br /> city property or easement. <br /> 9. Any party doing work within the City's property/easement shall maintain commercial general <br /> liability insurance coverage during the term of this permit with one million dollars <br /> ($1,000,000) combined single limits, and no less than two million dollars ($2,000,000) in the <br /> annual aggregate,which insurance shall be primary and non-contributing. Applicant shall <br /> ensure the City is endorsed as an additional insured on the policy. Insurance coverage and <br /> limits of liability as specified herein are minimum coverage and limit of liability requirements <br /> only. They shall not be construed to limit the liability of Applicant, Contractor or any insurer <br /> for any claim that is required to be covered hereunder. Moreover,the City shall be an <br /> additional insured, where additional insured status is required, for the full available limits of <br /> liability, whether those limits are primary, excess, contingent or otherwise. Applicant shall <br /> provide the City evidence of coverage and endorsement prior to commencement of any <br /> work. <br /> 10. All activities and work on the City property/easement must conform to the current City of <br /> Everett Transmission Line Standards to include all utility crossings (attached w/permit). <br /> 11.The City's Representative must be notified (3 working days prior to) of all entrances onto city <br /> property or easement. No entrance shall be made without prior notice. A City <br /> representative shall be onsite during all work, unless otherwise approved by the City's <br /> Representative. The City's Representative is authorized to stop work at any time if in their <br /> sole discretion they feel that the pipeline(s) are at risk. <br /> 12.Construction vehicles or equipment may use a portion of the City easement as designated by <br /> the City's Representative but must not stage or park on top of the pipelines or within 10 feet <br /> of any pipeline. City crews must have access to the easement at all times. <br /> 13. In case of a maintenance need or emergency involving City facilities, or for any other need as <br /> determined by the City, the City use and needs will supersede any and all conditions of this <br /> Right of Way Use Permit.This may include suspension of Applicant and Contractor activities <br /> on the City property or easement and return of the full use of the property or easement to <br /> the City of Everett. Loss of service or costs incurred by the Applicant and Contractor as a <br /> result of City maintenance, emergencies, or need are the risk of the use of this site and will <br /> be borne by the Applicant. <br /> low <br /> Page 2 of 4 <br /> 12/11/19 <br />