Laserfiche WebLink
Craig Investments, Inc. <br /> Rezone 6-88 <br /> Page -10- <br /> 20. Special charges for connection to sewer system in accordance with <br /> Ordinance 984-83 are applicable. The actual cost will be computed by <br /> the Building Department per the ordinance in effect at the time and in <br /> accordance with the information provided on the approved plans on the <br /> date the permit is issued. <br /> 21. A Notice of Construction must be obtained from the Puget Sound Air <br /> Pollution Control Agency for the installation of the underground fuel <br /> tanks prior to the issuance of any permits. <br /> 22. The fueling area must be covered and isolated from the drainage <br /> system. (SEPA Water Policy) <br /> 23. The new fuel tanks must be registered with Ecology's Storage Tank Unit <br /> of the Hazardous Waste Program within 30 days of being put into <br /> service. The notification form can be obtained by calling Ms. Jean <br /> Witt at 1-800-826-7716. (SEPA Water Policies) <br /> 24. The new fuel tanks must be installed in accordance with the <br /> Environmental Protection Agency's Underground Storage Tank <br /> Regulations. (SEPA Water Policies) <br /> StWATION <br /> The proposed contract rezone has been reviewed with the provisions of the <br /> Everett General Plan and the Everett Zoning Code. Testimony and evidence of <br /> all parties have been considered. Based upon all of this input, it is my <br /> impression that the site can be developed with a B-1 use for a convenience <br /> store with the amenities allowed in my recommendation. <br /> The main objections to the contract rezone were the lack of parking, the <br /> excessive traffic, and the lack of demand of such a facility. The Applicant <br /> has presented a parking plan that proposes fourteen spaces. Of these fourteen <br /> spaces, eleven are projected to be for customers while three are for <br /> employees. It is noted that these spaces do not include the parking spaces <br /> near the gas island. Although this appears to be, at the very minimum, <br /> adequate parking, the removal of one of the gas pump islands on-site and the <br /> removal of the car wash will allow additional parking to be developed <br /> on-site. This will effectively create a safer area within the site to park <br /> the vehicles, will reduce the amount of on-site traffic circulation, and will <br /> provide alternative spaces to park other than adjacent to the load and unload <br /> area near the southeastern corner of the site. <br /> As testified to by witnesses who are involved in the convenience store <br /> business, there is a demand for parking at these facilities. In fact, the <br /> property immediately to the west of this property is developed with a <br /> convenience store. The owner of the property and the lessee of the property <br /> testified that there is a constant demand for parking at this type of <br /> facility. This testimony implies that there is adequate demand for the <br /> services of the convenience store to support and allow for the develcpmer t—of <br /> this proposal. With the removal of the car wash and one of the gasa],ir}r,. <br /> pumps, this site will definitely have sufficient parking to meet the demands. <br />