My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2707 COLBY AVE MERRILL LYNCH 2020-02-06
>
Address Records
>
COLBY AVE
>
2707
>
MERRILL LYNCH
>
2707 COLBY AVE MERRILL LYNCH 2020-02-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 9:09:19 AM
Creation date
2/6/2020 9:08:25 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2707
Tenant Name
MERRILL LYNCH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG 04-03-2019(WED) 12:53 <br /> T REG-1 023147 <br /> CT 1 <br /> '" ' ,ETT a t ' <br /> A„s <br /> (425)257-8810 —''=1' S287 4 <br /> 03 BUILDING DEPARIME <br /> 3200 CEDAR ST <br /> EVERETT, WA. 98201-4516 <br /> 425-251 8810 Plan Check No.: B1903-043 <br /> Phone Order Application Date: 3/29/2019 <br /> VISAXXXXXzzX7799 Tenant: MERRILL LYNCH <br /> VISA Entry Method: Manual <br /> Total: $ 287.14 Owner: SKOTDAL MUTUAL LLC <br /> Account Balance: $ 78.63 Job Address: 2707 COLBY AVE 14TH FLOOR <br /> 04/03119 13.28,33 Proposed Use: COMMERCIAL <br /> Inv#: 000000019 Appy Code: 128178 <br /> Apprvd: Online Description of Work: INSTALL SECURITY DOOR/GLASS <br /> AVS Code: EXAC MATCH Y WINDOW IN RATED DOOR/INSTALL <br /> CVV2 Code: MATCH M <br /> Plan Check Fee Paid: $287.14 <br /> Customer Copv <br /> !IIHNk ,oto <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> APPLICANT COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.