Laserfiche WebLink
15 <br />o Evaluation Committee members then discussed their initial scoring for the <br />Qualifications and Experience of Contracting Party, Key Subcontractors, and <br />Key Personnel based on a total of 20 points. Following discussion, Committee <br />members concluded that all proposers demonstrated met the requirements of the <br />Qualifications and Experience Criterion, and developed their final scoring which averaged <br />as follows: <br />Qualifications and Experience of Contracting Party, Key Subcontractors, and Key <br />Personnel <br />Frank Coluccio Construction Company <br />IMCO Construction <br />18 out of 20 points <br />17 out of 20 points <br />• Ability of proposed key professional <br />• Ability of proposed key professional <br />personnel: <br />personnel: <br />Civil, Geotechnical and Dewatering <br />Civil, Shoring, Geotechnical and <br />personnel average 37 years in the <br />Dewatering personnel average 31 years in <br />industry. <br />the industry. <br />• Ability of key construction personnel: <br />• Ability of key construction personnel: <br />Project manager, construction manager and <br />Project manager, construction manager <br />superintendent average 30 years in the <br />and superintendent average 17 years in <br />industry. <br />the industry. <br />• Past performance of team members <br />• Past performance of team members <br />including engineer(s) and construction <br />including engineer(s) and construction <br />team members: <br />team members: <br />All have excellent past performance <br />All have excellent past performance <br />history. <br />history. <br />• Experience of team members working <br />• Experience of team members working <br />together on similar projects: <br />together on similar projects <br />Coluccio and Shannon & Wilson, geotech <br />IMCO and MHW worked together on <br />engineers, worked together on river <br />Water Transmission Line 3 Phase 7. <br />crossing. <br />• Specialized experience and technical <br />• Specialized experience and technical <br />competence <br />competence: <br />Dewatering, Shoring, Fish Biologist <br />Dewatering, Riverbed Restoration, Fish <br />• Demonstrated capability to perform as <br />Relocation, Permitting. <br />evidenced by successfu/ experience on <br />• Demonstrated capability to perform as <br />similar projects <br />evidenced by successful experience on <br />Large diameter water pipelines - <br />similar projects: <br />Transmission Lines 2 and 5; in -water <br />White River water main crossing. <br />work Mount Vernon; large dewatering - <br />• Accident prevention program: <br />Anacortes. <br />Provided general company program. <br />• Accident prevention program <br />Provided site specific plan. <br />120 <br />Page 13 <br />