Laserfiche WebLink
t6 <br />d. Summarize Findings - in brief memorandum or slide presentation, using tables, <br />figures, and / or bullet -point format. <br />212.6. QA/QC <br />Deliverables: <br />1. Model Run memo or slide presentation. <br />2. Revised alternatives and cost tables, with comparison. <br />3. Presentation/Meeting to review. <br />Subtask 213 - Update Costs, Schedule, Figures, Model <br />213.1. Project Management - same as in current agreement. <br />213.2. Workshop <br />a. Presentation at Everett PWD on 11-5-13 with DeMuth, de Steiguer, Chae, Kim <br />and King (DK through phone) in attendance. <br />213.3. Meetings - Preparatory to Workshop <br />a. Meeting with Snohomish County PUD to discuss clearances from power lines <br />and costs to bury power and communications. <br />b. Meeting with HDD contractor on site to review HDD conditions, approach and <br />cost. <br />c. Meeting with City to discuss outfall configurations. <br />d. Continued support as requested. <br />213.4. Revise Alternatives, Figures, and Costs <br />a. Revised alternatives to reflect current thinking on routing of SD to PSO3 and CS <br />to PSO1 and PSO2 in the near term, and to route CS, in addition to SD, to the <br />Kimberly-Clark site in the future. <br />b. Revise figures <br />c. Revise Cost Tables - all. <br />d. Follow-up to workshop. <br />Version 3 <br /># <br />Description: <br />1 <br />For bridge alternative, add park and property restoration to the costs. <br />2 <br />Add PS&E to estimates. <br />3 <br />Increase contingency on additional cost to convert bridge to pedestrian <br />use to 50%. <br />4 <br />Add cost to replace bridge at 75 years, to match up with life expectancy of <br />pipelines (100 years). <br />5 <br />Change frequency for pigging to once every 20 years. <br />17 <br />4/29/14 <br />139 <br />