[6 <br />d. Continued support as requested. <br />213.6. Prepare Schedule for Sewer M and Related Outfall Projects <br />a. Update schedule for completion of Sewer M design. <br />b. Add in schedule of Sewer M construction for earliest completion. <br />c. Add in schedule for design and construction of Single HDD. <br />d. Add in schedule for design and construction of Utility Bridge. <br />e. Add in schedule for design of Sewer M Phase 2. <br />f. Arrange schedule to assure that the system can handle flows. <br />g. Continued support in modifications to schedule as requested. <br />213.7. QA/QC <br />Deliverables: <br />1. Updated figures and cost tables. <br />2. Schedule for Completion of Sewer M and outfall through Phase 2. <br />3. Analysis of frequency of storms producing flushing velocities. <br />4. Model run for ESM Phasel, Interim Construction Period, 14 Storm Series. <br />5. Model run for Post-PS03 Replacement, 50-Year Storm Frequency, LSO8 Off. <br />6. Model run for Post-PS03 Replacement, 100-Year Storm Frequency, LSO8 On. <br />Subtask 214 — Prepare Final Summary TM <br />214.1. Project Management - same as in current agreement. <br />214.2. Meetings — None <br />214.3. Prepare Summary TM <br />a. Review findings of City with respect to final decision on: Utility Bridge <br />Alternative. <br />b. Summarize planning work to date on PS03 Replacement. <br />G. Edit figures, tables and text to reflect final alternatives considered. <br />d. Issue draft to City for review. <br />214.4. QC <br />Deliverables: <br />1. Draft Technical Memorandum with updated figures and tables reflecting final alternatives <br />considered and selected alternative. <br />Task 220 — Grand Avenue Park Bridge Design -Build Application Assistance <br />This task was authorized by the City on December 20, 2013. The purpose of this task is to <br />assist the City in preparation of an application to the Washington State Department of <br />Version 3 19 4/29/14 <br />141 <br />