My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/05/28 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/05/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:18:14 PM
Creation date
2/6/2020 10:51:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/28/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Background <br />• Broadway Avenue is a Principal Arterial within the <br />City of Everett's CBD (30,000 ADT) <br />• Spans the BNSF Mainline; Seattle to Chicago <br />• 100-foot span bridge built in 1912 based on a 1900 <br />agreement with the railroad; modified in 1931 <br />• Load restricted, parking removed — June -July 2008 <br />• Non-destructive testing — February 2009 <br />• Major deficient elements identified, Replacement <br />recommended over rehabilitation <br />• Initial Design Funds — December 2009 <br />• Design Team selected — August 2010 <br />• Initial BRAC Award - November 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.