My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/05/28 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/05/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:18:14 PM
Creation date
2/6/2020 10:51:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/28/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />1I <br />PROJECT TITLE: <br />Call for Bids for the <br />Construction of the Water <br />Main Replacement "N" Project <br />Briefing <br />Proposed Action <br />Consent <br />Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />Budget Advisory <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />PW/Utilities <br />Richard Hefti <br />425-257-7215 <br />5/28/14 <br />Location <br />Seahurst Avenue, 51st St <br />SW, 49th P1 SW, 9th Ave <br />W <br />Preceding Action <br />Geotechnical Services <br />PSA-12/18/13 <br />Attachments <br />Vicinity Map <br />Department(s) Approval <br />PW <br />Amount Budgeted <br />$1,400,000 <br />Fund No. 336 <br />Expenditure Required <br />$2,000 <br />Account Number(s): UP 3575 <br />Budget Remaining <br />$1,354,588 <br />Additional Required <br />-0- <br />DETAILED SUMMARY STATEMENT: <br />Watermain Replacement "N" will replace approximately 4,400 feet of existing 6-inch and 8-inch diameter <br />cast iron pipe within the Seahurst Pressure Zone (564) with 12-inch and 8-inch diameter ductile iron pipe. <br />The need for this project is to improve currently inadequate fireflows as noted in the 2007 Water <br />Comprehensive Plan. The water mains being replaced are along Seahurst Ave from 54th St SW to 49th P1 <br />SW, 49th P1 SW to 9th Ave SW, 9th Ave SW to Glenhaven Dr and 51st St SW east of Seahurst Ave. <br />The budget remaining amount is calculated by deducting the contracts for geotechnical ($13,565), surveying <br />($20,951C staff ($10,700) and this $2,000 request from the amount budgeted. <br />• <br />The project is ready to advertise for construction bids. There are no supplemental bidder requirements <br />associated with this project. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize the Call for Bids for the construction of the Water Main Replacement "N" Project. <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.