Laserfiche WebLink
TABLE OF CONTENTS <br />1 BNSF OVERPASS AGREEMENT & EASEMENT AGREEMENT FOR <br />BROADWAY BRIDGE 5 <br />1.1 BNSF Riverside Overpass 5 <br />1.2 Overpass Temporary Construction Agreement 6 <br />1.3 Riverside Overpass Easement 6 <br />1.4 Transfer of Riverside Overpass 6 <br />2 BENSON& WOLKEN PUBLIC EASEMENT AGREEMENT 6 <br />2.1 Benson & Wolken Existing Private Easement 6 <br />2.2 Benson & Wolken New Public Access Easement 6 <br />3 TULALIP WATERLINE EASEMENT EXTENSION 7 <br />3.1 Existing Tulalip Waterline Easements 7 <br />3.2 Expansion of Tulalip Waterline Easement 7 <br />3.3 Temporary Construction Easement 7 <br />4 STORMWATER SYSTEM 7 <br />4.1 Stormwater Drainage Easement 7 <br />4.2 Stormwater Detention Pond 7 <br />4.2.1 Location 7 <br />4.2.2 Easement Transfer of Stormwater Pond 8 <br />4.2.3 Stormwater Pond Pre -Transfer Maintenance 8 <br />4.3 Infrastructure Transfer 8 <br />4.3.1 Definition of Transferred Stormwater Infrastructure 8 <br />4.3.2 Date of Transfer 8 <br />4.3.3 Transferred Stormwater Infrastructure Free and Clear 8 <br />4.3.4 Transfer of Warranties 8 <br />4.3.5 No Other Warranties 9 <br />4.3.6 Bill of Sale 9 <br />4.4 Lot 8 9 <br />4.4.1 Lot 8 Stormwater Drainage Easement 9 <br />