My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/05/28 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/05/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:18:14 PM
Creation date
2/6/2020 10:51:23 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/28/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />File No. 201201310149, is a stormwater detention pond owned by the Port on Port property (the <br />"Stormwater Pond"). <br />4.2.2 Easement Transfer of Stormwater Pond. By the above <br />recordable utility easement, as specified in Section 4.1, the City shall be granted an easement for <br />the operation and maintenance of the Stormwater Pond, "AS IS" without any warranties, express <br />or implied, and without recourse, so that the City will take over, subject to Section 4.6 below, the <br />responsibilities of maintenance and control of the Stormwater Pond; such responsibilities shall <br />include, but not be limited to, the landscaping within the inside of the currently -existing fence <br />surrounding the Stormwater Pond. Such responsibilities do not include any landscaping outside <br />of the currently -existing fence. <br />4.2.3 Stormwater Pond Pre -Transfer Maintenance. Prior to the <br />execution and recording of the utility easement referred to in Section 4.1 above, the Port shall <br />complete maintenance of the Stormwater Pond pursuant to the terms and provisions of that <br />certain agreed -upon plan attached hereto as Exhibit "9" and incorporated herein by this <br />reference. The City has no obligations regarding the Stormwater Pond until completion of such <br />maintenance by the Port and recording of the Stormwater Drainage Easement. <br />4.3 Infrastructure Transfer. <br />4.3.1 Definition of Transferred Stormwater Infrastructure. For the <br />purposes of this Agreement, the term "Transferred Stormwater Tnfrasstructure" refers to all <br />stormwater-related infrastructure marked as Transferred Utilities on the attached Exhibit "10." <br />4.3.2 Date of Transfer. As of the date of the recording of the <br />Stormwater Drainage Easement, all of the Port's right, title, and interest in the Transferred <br />Stormwater Tnfrastructure are transferred and conveyed to the City. <br />4.3.3 Transferred Stormwater Infrastructure Free and CIear. The <br />Port warrants that the Transferred Stormwater Infrastructure as of the recording date of the <br />Stormwater Drainage Easement are free and clear of all liens and all other monetary <br />encumbrances. The Port warrants the Transferred Stormwater Infrastructure will not become <br />subject to any liens or other monetary encumbrance arising from the construction and installation <br />of the Transferred Stormwater Infrastructure. <br />4.3.4 Transfer of Warranties. As of date of recording of the <br />Stormwater Drainage Easement, the Port assigns to the City all warranties by contractors or <br />suppliers or others related to the construction and 'installation of the Transferred Stormwater <br />Infrastructure. If a warrantor later asserts that its warranty cannot be assigned to the City, then <br />the Port will, at the request and cost of the City and in coordination with the City, take all <br />reasonable steps to enforce the warranty on behalf of the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.