Laserfiche WebLink
presence of hazardous substances in the Riverside Business Park not released by the City, such <br />as for example all costs related to the handling and disposal of arsenic -contaminated excavation <br />soils; (2) all costs related to the operation, maintenance and replacement of the Stormwater Pond; <br />(3) all costs related to operation, maintenance and replacement of the outfall into the Snohomish <br />River connected to the Stormwater Pond, including costs associated with any clean-up of the <br />discharge area of the outfall; and (4) all costs related to the operation, maintenance and <br />replacement of stoiinwater pump stations. <br />4.5.3 Stormwater System Capacity. The parties acknowledge that the Port of <br />Everett Riverside Business Park Stormwater Site Plan (Comprehensive Hydraulics Report) <br />revised April 2000 accurately states the capacities of the Stormwater Detention Pond and other <br />associated stormwater infrastructure. <br />5. Sanitary Sewer System. <br />5.1 Sanitary Sewer Easement. Presently existing within the Riverside <br />Business Park is a sanitary sewer system and associated equipment. The Port shall grant to the <br />City, by recordable document, substantially in the form attached hereto as Exhibit "12," a non- <br />exclusive utility easement for the general purpose of sanitary sewer access, maintenance, and <br />operation of (the "Sanitary Sewer Easement"). The Sanitary Sewer Easement does not include <br />Lot 8. As described in Section 5.4 below, the City does not intend to operate or maintain the <br />sanitary sewer system within Lot 8. <br />5.2 Infrastructure Transfer. <br />5.2.1 Definition of Transferred Sewer Infrastructure. For the <br />purposes of this Agreement, the team "Transferred Sewer Infrastructure" refers to all sanitary - <br />sewer related infrastructure marked as Transferred Utilities on the attached Exhibit "13". <br />5.2.2 Date of Transfer. As of the date of the recording of the Sanitary <br />Sewer Easement, all of the Port's right, title, and interest in the Transferred Sewer Infrastructure <br />are transferred and conveyed to the City. <br />5.2.3 Transferred Sewer Infrastructure Free and Clear. The Port <br />warrants that the Transferred Sewer Infrastructure as of the recording date of the Sanitary Sewer <br />Easement are free and clear of all liens and all other monetary encumbrances. The Port warrants <br />the Transferred Sewer Infrastructure will not become subject to any liens or other monetary <br />encumbrance arising from the construction and installation of the Transferred Sewer <br />Infrastructure. <br />5.2.4 Transfer of Warranties. As of date of recording of the Sanitary <br />Sewer Easement, the Port assigns to the City all warranties by contractors or suppliers or others <br />related to the construction and installation of the Transferred Sewer Infrastructure. If a warrantor <br />later asserts that its warranty cannot be assigned to the City, then the Port will, at the request and <br />cost of the City and in coordination with the City, take all reasonable steps to enforce the <br />warranty on behalf of the City. <br />10 <br />66 <br />