Laserfiche WebLink
2 <br />7.3 Quit Claim Bill of Sale on Bridge. The Quit Claim Bill of Sale on <br />Bridge shall be entered into within ninety (90) days after the later of (a) substantial completion of <br />the "throw fence" construction as provided by the above Overpass Temporary Construction <br />Agreement, and final acceptance and construction closing of this project, (b) the acquisition by <br />the Port of the Benson & Wolken New Public Access Easement, as provided for by Section 2.2, <br />and (c) the execution and recordation of the Easement Agreement referred to in Section 1.3. <br />7.4 Tulalip Waterline Easements. The Tulalip waterline easements, both the <br />permanent waterline easement and the temporary construction easements, as provided for by <br />Section 3 above, shall be entered into, executed, and recorded no later than ten (10) business <br />days of the Effective Date of this General Transfer Agreement. <br />7.5 Stormwater Drainage Easement. The Stormwater Tnfi-astructure and <br />Retention Pond Easement shall be executed and recorded within thirty (30) days after the latest <br />of: <br />(a) completion by the Port of the cleanout responsibilities of the <br />subject Stonnwater Pond as required by Section 4.2 above; <br />(b) recording by the Port of the Declaration Amendments required <br />under Sections 9 and 10 below; <br />(c) <br />delivery to the City of the Cymbaluk easement described in <br />Section 10.3 below, in recordable form and fully executed by all <br />parties thereto other than the City; and <br />(d) (i) delivery to the City of the Lot 8 easement described in Section <br />4.4.1 in recordable form and fully executed by all parties thereto <br />other than the City or (ii) the complete installation of the valve(s) <br />as described in Section 4.4.2. <br />7.6 Sanitary Sewer Easement. The Sanitary Sewer Easement shall be <br />executed and recorded within thirty (30) days after the latest of: <br />(a) recording by the Port of the Declaration Amendments required <br />under Sections 9 and 10 below; <br />(b) the Port obtaining utility easements from as described in <br />Section 5.3; and <br />(c) the completion of the Lot 8 Sanitary Isolation Work as described in <br />Section 4.4.2. <br />12 <br />68 <br />