Laserfiche WebLink
12/24/2019 Page <br /> City of Everett <br /> 8:28:23AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1907-084 Site Address 9025 EL CAPITAN WAY <br /> Applied 7/15/2019 Applicant Lot <br /> Approved 7/15/2019 Owner WASHINGTON STATE DEPT OF TRANSPORTATIOI Block <br /> Issued 7/15/2019 Contractor OWNER Tract <br /> Parent Permit No. Description PROVIDE 100A,208/120V,3 PH PANEL FOR 2 CAR CHARGER <br /> Notes <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 9/19/2019 9/19/2019 ELEC 02-GROUND SKB APPROVAL Cronan 206-510-6116 <br /> WORK <br /> (9/19/2019 12:43 PM SKB) <br /> Building to charger.Contractor extending <br /> PVC above grade at building. <br /> 12/23/2019 12/23/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 12/23/2019 12/23/2019 ELEC 09-FINAL SKB APPRVD-PERF eTRAKiT Inspection 12/19/2019 6:33 AM Jason Hough <br /> Request <br /> Contact Name:Jason Hough <br /> Site Address:9025 EL CAPITAN WAY <br /> Phone:2064404047 <br /> e-Mail:houghja@wsdot.wa.gov <br /> INSP12 C'/i111/S YSTE MS <br />