t GENERAL NOTES: GENERAL NOTES- PLUMBING:
<br /> 1. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE PRECEDENCE. 1. DO NOT SCALE DIMENSIONS FROM THIS DRAWING FOR CONSTRUCTION
<br /> PURPOSES. VERIFY PLUMBING FIXTURE DIMENSIONS IN FIELD PRIOR
<br /> 2. OWNER/CLIENT, AND/OR CONTRACTOR, IS RESPONSIBLE FOR ANY AND ALL PERMITS WHICH MAY BE TO INSTALLATION OF PIPING. FOR ANY OTHER REQUIRED DIMENSIONS 11:L7QDM7
<br /> REQUIRED FOR THE COMPLETION OF THIS PROJECT. SEE DESIGN DRAWINGS.
<br /> 3. THIS SET OF DRAWINGS/DOCUMENTS IS A REPRESENTATION OF THE DESIGN INTENT AND DO NOT INDICATE 2. WHERE APPLICABLE AND PERMISSIBLE, PIPING RUNNING THE LENGTH DL
<br /> "ALL" THE BUILDING CONDITIONS AND/OR BUILDING COMPONENTS REQUIRED FOR THE CONSTRUCTION OF OF THE BUILDING, TO BE SECURED TO BOTTOM OF EXPOSED
<br /> THE PROJECT. IT IS THE CONTRACTOR'S AND SUBCONTRACTOR'S RESPONSIBILITY TO THOROUGHLY REVIEW STRUCTURE THEREBY FOLLOWING THE SLOPE OF THE STRUCTURE.
<br /> THE DRAWINGS TO VERIFY ALL THE MATERIALS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT. 3. NO PERFORATED PIPE STRAPS OR WIRE SHALL BE ACCEPTABLE FOR Darcy J. Mertz Krewson,
<br /> 4. THE GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE FURNISHING ALL MATERIALS, EQUIPMENT, THE PIPE SUPPORT. PIPING SHALL BE SUPPORTED/SUSPENDED TO RDI,essoc.AIA
<br /> PREVENT VIBRATION AND TO PROVIDE EXPANSION AND CONTRACTION P
<br /> LABOR, AND ANY REQUIREMENTS DEEMED NECESSARY TO COMPLETE INSTALLATION AS DESCRIBED IN THESE 142516080/5 Fc 142515120270
<br /> DRAWINGS/DOCUMENTS.
<br /> (PER APPROPRIATE UPC SECTION). PO BOX &pVn� 98258
<br /> 4. AT ANY AND ALL POINTS OF CONTACT BETWEEN COPPER PIPE ':J.',;:1,41`07:.,".:,;
<br /> 0. /Y D"ykb"tlob....c.5. THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL CAREFULLY AND THOROUGHLY REVIEW THE DRAWINGS, INSTALLED IN THE WORK AND ANY IRON OR STEEL MATERIAL SUCH
<br /> SPECIFICATIONS AND OTHER CONSTRUCTION DOCUMENTS AND SHALL AGREE BEFORE SUBMITTING A BID OR AS STEEL PIPE, HANGERS, SUPPORTS, BEAMS, ETC., THE COPPER PROJECT INFORMATION:
<br /> COMMENCING WITH CONSTRUCTION, THAT THEY HAVE FOUND THE DRAWINGS, SPECIFICATIONS AND OTHER PIPING SHALL BE SUITABLY WRAPPED WITH FRICTION TAPE AND
<br /> CONSTRUCTION DOCUMENTS TO BE FREE FROM AMBIGUITIES AND SUFFICIENT FOR THE PURPOSES INTENDED. ELECTRICIAN'S PLASTIC TAPE TO PROPERLY INSULATE THE COPPER
<br /> 6. PRIOR TO THE SUBMISSION OF BIDS, THE CONTRACTOR AND ALL SUBCONTRACTORS INVOLVED SHALL VISIT PIPING AND PREVENT ANY ELECTROLYSIS AND ELECTROMECHANICAL
<br /> THE JOB SITE TO FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT, TO ACTION CAUSED BY CONTACT OF TWO DISSIMILAR METALS, ALSO
<br /> VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE ACCOMPLISHED AS SHOWN. PRIOR TO WRAP PIPE AT ALL FLOOR PENETRATIONS.
<br /> PROCEEDING WITH CONSTRUCTION ANY ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE BROUGHT TO 5. VERIFY ENTERING POINTS AND METERING LOCATIONS BEFORE
<br /> THE ATTENTION OF THE OWNER, ENGINEER AND/OR DESIGNER VERBALLY AND IN WRITING. INSTALLATION. 0
<br /> 7. ALL TRADES SHALL REFER TO THE DRAWINGS REGARDING LOCATION OF WORK TO BE INSTALLED. 6. PROVIDE BACK FLOW PREVENTORS WHERE EVER REQUIRED BY LOCAL Z
<br /> 8. ALL WORK INCIDENTAL TO THE CONTRACT AND NECESSARY TO COMPLETE THE PROJECT, ALTHOUGH NOT AND UNIFORM CODES, CROSS CONNECTION AND BACK FLOWUi
<br /> SPECIFICALLY REFERRED TO ON THE DRAWINGS OR SPECIFICATIONS, SHALL BE FURNISHED AND PERFORMED CONtROt PER APPROPRIATE UPC SECTION. U-1
<br /> BY THE CONTRACTOR. 7. MINIMUM PLUMBING DWV SLOPE = 1/4" PER FOOT.
<br /> Ct
<br /> 9. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN THESE 8. MATERIALS, CONNECTION FOR PLUMBING PER APPROPRIATE UPC I-
<br /> DRAWINGS/DOCUMENTS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS,- EDITION, PER FIELD VERIFICATION.
<br /> CD
<br /> METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES FOR COORDINATING ALL PORTIONS OF THE WORK
<br /> UNDER THE CONTRACT. 9. ALL SHOWERS AND TUB-SHOWERS SHALL HAVE A PRESSURE D
<br /> 10. ALL CONSTRUCTION SHALL OBSERVE AND COMPLY WITH ALL FEDERAL, STATE, COUNTY, AND CITY, LAWS, BALANCE, THERMOSTATIC MIXING VALVE, OR A COMBINATION 0 W
<br /> REGULATIONS, ORDINANCES, BUILDING CODES, SUBSEQUENT STATE, COUNTY, AND CITY AMENDMENTS TO THE PRESSURE BALANCE/THERMOSTATIC MIXING TYPE VALVE. Z D
<br /> CODES. - r
<br /> 10. NEW OR REPLACEMENT WATER HEATERS SHALL BE STRAPPED TO THE W
<br /> 11. THE CONTRACTOR SHALL OBSERVE AND COMPLY WITH ALL FEDERAL, STATE, COUNTY, AND CITY LAWS WALL IN TWO PLACES PER LATEST CODE. W Q CO
<br /> REQUIRED FOR THE PROTECTION OF PUBLIC HEALTH, SAFETY AND ENVIRONMENTAL QUALITY. Z .2 Q
<br /> 12. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO GENERAL NOTES - ELECTRICAL: 0 W
<br /> MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE LOCAL CODES OR CO W F-
<br /> ORDINANCES TAKE PRECEDENCE. 1. ALL ELECTRICAL PLANS INCLUDED IN THIS SET OF DRAWINGS ARE
<br /> SCHEMATIC AND REFLECT DESIGN INTENT ONLY.
<br /> 13. THE CONTRACTOR SHALL PROVIDE, AT THE PROJECT SITE, A FULL SET OF CONSTRUCTION DOCUMENTS W W
<br /> UPDATED WITH THE LATEST REVISIONS AND ADDENDA OR CLARIFICATIONS FOR THE USE BY ALL PERSONNEL 2. DO NOT SCALE DIMENSIONS FROM THIS DRAWING FOR CONSTRUCTION O Ce
<br /> INVOLVED WITH THE PROJECT. PURPOSES. VERIFY DIMENSIONS IN FIELD PRIOR TO INSTALLATION. `-I op w
<br /> 14. THE STRUCTURAL COMPONENTS OF THIS PROJECT SITE/FACILITY ARE NOT TO BE ALTERED BY THIS 3. VERIFY ENTERING POINTS AND METERING LOCATIONS BEFORE v CO W
<br /> CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE. INSTALLATION.
<br /> 15. DETAILS INCLUDED HEREIN ARE INTENDED TO SHOW END RESULT OF DESIGN. MINOR MODIFICATIONS MAY BE 4. THE ELECTRICAL CONTRACTOR SHALL COMPLY WITH ALL STATE AND
<br /> REQUIRED TO SUIT JOB CONDITIONS OR SITUATIONS. MODIFICATIONS SHALL BE INCLUDED AS PART OF THE LOCAL CODES AND REQUIREMENTS. TENANT
<br /> SCOPE OF WORK. 5. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL IMPROVEMENT
<br /> 16. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS WITH U.L. LISTED OR FIRE MARSHALL APPROVED PERMITS WHICH MAY BE REQUIRED - REFER TO GENERAL NOTES #2.
<br /> MATERIALS IF APPLICABLE TO THIS FACILITY AND/OR PROJECT SITE. DRAWINGS
<br /> 17. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR
<br /> 2-AlOBC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF PROJECT AREA DURING CONSTRUCTION.
<br /> 18. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY, AS WELL AS LIABILITY FOR THE
<br /> JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT AND SHALL ESTABLISH
<br /> AND MAINTAIN AT ALL TIMES, ALL PROTECTIVE MEASURES AS REQUIRED TO SAVE HIS/HER EMPLOYEES, THE
<br /> PUBLIC, AND ALL OTHERS FROM BODILY HARM OR DEATH RESULTING FROM OPERATIONS RESULTING FROM SCHEMATIC DESIGN 11/07/18
<br /> THE WORK UNDER THE CONTRACT. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED
<br /> TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL PAY FOR ANY AND ALL CLAIMS RESULTING FROM REVISIONS:
<br /> ANY SUCH ACCIDENT WITHOUT LIABILITY TO THE OWNER OR THE DESIGNER.
<br /> NO. DESCRIPTION DATE
<br /> 19. CONTRACTOR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD FREE DURING CONSTRUCTION AND AS-BUILT 11/13/18
<br /> DISPOSE OF ALL DIRT, DEBRIS, AND RUBBISH. CONTRACTOR SHALL REMOVE EQUIPMENT NOT SPECIFIED AS
<br /> REMAINING ON THE PROPERTY OR PREMISES. SITE SHALL BE LEFT IN CLEAN CONDITION AND FREE FROM A REVISE RESTROOM 12/05118
<br /> PAINT SPOTS, DUST, OR SMUDGES OF ANY NATURE. B FINAL TI DRAWINGS 12/07/18
<br /> 20.ALL SUBCONTRACTORS ARE TO COMMUNICATE WITH THE ENGINEER/DESIGNER THROUGH THE GENERAL REV PER CITY COMMENTS 0325119
<br /> CONTRACTOR WITH ALL QUESTIONS THEY MIGHT HAVE CONCERNING THESE DRAWINGS AND/OR L2 ROUND 2 CITY COMMENTS 08/19/19
<br /> SPECIFICATIONS.
<br /> DRAWN BY:DJMK I APPROVED BY:DJMK
<br /> 21.THE DESIGNER HAS MADE EVERY EFFORT TO SET FORTH IN THESE DRAWINGS/DOCUMENTS THE COMPLETE
<br /> SCOPE OF WORK. CONTRACTORS BIDDING THE JOB ARE NEVERTHELESS CAUTIONED THAT MINOR OMISSIONS SHEET TITLE:
<br /> OR ERRORS IN THE DRAWINGS AND OR SPECIFICATIONS SHALL NOT EXCUSE SAID CONTRACTOR FROM
<br /> COMPLETING THE PROJECT AND IMPROVEMENTS IN ACCORDANCE WITH THE INTENT OF THESE DOCUMENTS. GENERAL NOTES
<br /> E
<br /> THE BIDDER SHALL BEAR THE RESPONSIBILITY OF NOTIFYING (IN WRITING) THE DESIGNER OF ANY
<br /> CONFLICTS, ERRORS, OR OMISSIONS PRIOR TO THE SUBMISSION OF CONTRACTOR'S PROPOSAL. IN THE
<br /> EVENT OF DISCREPANCIES THE CONTRACTOR SHALL PRICE'THE MORE COSTLY OR EXTENSIVE WORK, UNLESS CITY OF E EREl
<br /> DIRECTED OTHERWISE. lr9 9 C N
<br /> �j IE A FOR ��� �� SCALE:IDRADRAWING SET
<br /> 1
<br /> 22.THE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED HOURS. ("� i 9�'9/ TI DRAWING SET
<br /> 23.THE CONTRACTOR SHALL PROVIDE OWNER WITH PROPER INSURANCE CERTIFICATES AND PROOF OF DATE ISSUED:12/28/18 /��
<br /> LICENSE(S). SHEET NUMBER:
<br /> G-1 .0
<br />
|