Laserfiche WebLink
(79 <br /> lerracon <br /> Staples Replacement <br /> PROJECT: Retaining Wall PROJECT NO.: 81175122 TASK: 2 <br /> SUBJECT: Retaining Wall Calculations BY: Z. Koehn, F. Madrona DATE: 3/12/19 <br /> REVIEWED BY: R. Luark DATE: 3/12/19 <br /> ATTACHED ARE THE SOLDIER PILE CALCULATIONS FOR PERMANENT TIEBACK <br /> RETAINING WALLS WITH SHOTCRETE FACING FOR THE STAPLES ROCKERY <br /> REPLACEMENT PROJECT ON 4920 EVERGREEN WAY IN EVERETT,WASHINGTON. <br /> THE FOLLOWING CALCULATIONS ARE ATTACHED: <br /> • SOLDIER PILE SIZING <br /> o COMPENSATION PLATE <br /> • TIEBACK ANCHOR LOADS <br /> • WOOD LAGGING SCHEDULE <br /> • SHOTCRETE FACING <br /> o MINIMUM THICKNESS <br /> o REINFORCING BARS FOR HORIZONTAL AND VERTICAL <br /> o HEADED STUDS <br /> P►RD D.41, <br /> , digir <br /> *wi, WAS ., <br /> air <br /> ;474 <br /> , 4-',- 41*,,4 <br /> Rk2 .° `� <br /> Permit#: PWW1903-0O1 <br /> Site Address: 4920 EVERGREEN WAY <br /> Owner: EVERGREEN WAY HOLDING LLC <br /> Tenant: [TenName] <br /> App. Date: 3/13/2019 <br /> Proposed Use: <br /> Description: REPAIR EXISTING ROCKERY WALL WITH <br /> NEW RETAINING WALL <br /> Reviewed By: Date: 4/' 4(Zeds <br /> Office Set Job Site Set Fire/Planning Set <br />