My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4920 EVERGREEN WAY STAPLES Geotech Report 2022-10-25
>
Address Records
>
EVERGREEN WAY
>
4920
>
STAPLES
>
Geotech Report
>
4920 EVERGREEN WAY STAPLES Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:10:28 PM
Creation date
2/7/2020 8:57:16 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4920
Tenant Name
STAPLES
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report <br /> Staples Rockery Failure Everett,Washington lierracon <br /> March 8, 2019 Terracon Project No. 81175122 <br /> retain the unsupported soil. Furthermore, removal of the rockery in short sections, or slots, <br /> will help mitigate the potential for sloughing after the rockery is deconstructed and before <br /> lagging is placed. <br /> Backfilling. For temporary excavations, trenches,voids behind the retaining wall, and the <br /> headscarp of the failed section, backfilling should occur after temporary wood lagging has <br /> been placed for the full height of the retaining wall. This will help reduce the further loading <br /> on the building wall within the existing failed section. <br /> As of the publishing of this report, overhead utilities exist adjacent to the rockery and will be an <br /> obstruction during retaining wall construction. The contractor will need to work with the City and <br /> other public utilities to relocate the overhead utilities. <br /> Surface water should not be allowed to pond on the site and soak into the soil during or after <br /> construction. Construction staging should provide drainage of surface water and precipitation <br /> away from the retaining wall.Any water that collects over or adjacent to construction areas should <br /> be promptly removed. Surface water control in the form of sloping surfaces, drainage ditches and <br /> trenches, and sump pits and pumps will be important to avoid ponding and associated delays due <br /> to precipitation and seepage. <br /> 4.3 Seismic Considerations <br /> Code Used Site Classification <br /> International Building Code (IBC) and 2010 ASCE 71 D2 <br /> S5—Short Period Spectral Acceleration for Site Class B 1.378 g <br /> Si — 1-Second Period Spectral Acceleration for Site Class B 0.523 g <br /> Fa—Short Period Site Coefficient for Site Class D 1.0 <br /> Fv— 1-Second Period Site Coefficient for Site Class D 1.5 <br /> PGA-ASCE 7-10, Peak Ground Acceleration 0.570 <br /> FPGA-Peak Ground Acceleration Site Coefficient 1.0 <br /> 1. The 2010 ASCE 7 document indicates that the seismic site classification is based on the average <br /> soil and bedrock properties in the top 100 feet. The current scope does not include a 100-foot soil <br /> profile determination. This seismic site class definition considers that soil encountered at depth in <br /> our explorations continue below the termination depths. Additional exploration to deeper depths <br /> would be required to confirm the conditions below the current depth of exploration. <br /> 2. Site Class D applies to an average soil profile within the top 100 feet consisting predominantly of <br /> stiff and dense to very dense soils. This soil is characterized by Standard Penetration Test blow <br /> counts between 15 to 50, a shear wave velocity of between 600 and 1,200 feet per second, and an <br /> undrained shear strength between 1,000 and 2,000 pounds per square foot. <br /> Responsive • Resourceful ■ Reliable 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.