My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4920 EVERGREEN WAY STAPLES Geotech Report 2022-10-25
>
Address Records
>
EVERGREEN WAY
>
4920
>
STAPLES
>
Geotech Report
>
4920 EVERGREEN WAY STAPLES Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:10:28 PM
Creation date
2/7/2020 8:57:16 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4920
Tenant Name
STAPLES
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iierracon <br /> March 8, 2019 <br /> Hilbers, Inc. <br /> 15215 SE 272nd St. <br /> Kent, WA 98042 <br /> Attn: Dale Mote– Project Manager <br /> P: [253]243-7719 <br /> E: dale@hilbersinc.com <br /> Re: Geotechnical Engineering Report <br /> Staples Rockery Failure <br /> Everett,Washington <br /> Terracon Project Number: 81175122 <br /> Dear Mr. Mote: <br /> Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering services for <br /> the above referenced project.This study was performed in general accordance with our proposal <br /> number P81175122 dated December 13, 2017. This report presents the findings of the <br /> subsurface explorations and provides geotechnical recommendations concerning the rockery <br /> failure. Our report presents recommendations for a retaining wall that will replace the existing <br /> rockery for the northern portion of the building, which includes the failed section of rockery, and <br /> will protect the building wall from future rockery failures as well as the City of Everett public- <br /> right-of-way from further erosion. <br /> The recommendations provided herein are based on the outcome of our meeting with the City <br /> of Everett that took place on January 20, 2018. The City informed us that they would willing to <br /> grant a permanent easement for the retaining wall to encroach on the east boundary of the <br /> public right-of-way. Therefore, our design is based on a soldier pile and tieback system with the <br /> soldier piles and tieback anchors located in the right-of-way. <br /> We appreciate the opportunity to be of service to you on this project. If you have any questions <br /> concerning this report, or if we may be of further service, please contact us. <br /> Sincerely, to4,8 L. p <br /> Terracon Consultants, Inc. W <br /> "de— )14.1. 11005. ‹, ) <br /> cat <br /> Zachary L. Koehn, P.E. 3i.2 r19 Dennis R. Stettler, P.E. <br /> Senior Staff Engineer �� = Senior Engineering Consultant <br /> Terracon Consultants, Inc. 21905 64th A , , 00 Mountlake Terrace, Washington 98043 <br /> P [425] 771 3304 F [425] 771 3549 terr con.com <br /> Environmental • Facilities • Geotechnical ■ Materials <br />
The URL can be used to link to this page
Your browser does not support the video tag.