Laserfiche WebLink
INSPECTION REPORT <br /> s' Date S/Z) !11°j Permit: _E O -O5/ <br /> Contractor: MeHe• <br /> Owner: i !tet Ar. / _ Pe)470_____ <br /> Site Address: 74 ' .e+`i - - t n-ay <br /> TYPE OF INSPECTION REQUESTED V T, <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ■ <br /> ling Grid ❑Drywall Nailing ❑Plumbing Final <br /> 11i ctrical Final ❑Shear Nailing GAS PIPE <br /> .ITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: _20CP-4419• g_ <br /> 4.PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> a OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> \ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSP TION—2our notice required <br /> ( 753] . 35--t`3,5z---- <br /> f,...-- ......A....."1 <br /> I i . Q3- ---t q°° re <br /> 111411 <br /> 5/ZZA <br /> Inspector: Zi/AIP Date: g <br /> ri <br /> EIR(10/06) DATABAR,INC. <br />