Laserfiche WebLink
11/27/2019 City of Everett Page 1 <br /> 12:22:37PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1908-097 Site Address 6220 FLEMING ST <br /> Applied 8/15/2019 Applicant Lot <br /> Approved 8/15/2019 Owner LUNA GABRIEL Block <br /> Issued 8/15/2019 Contractor OWNER Tract <br /> Parent Permit No. Description RELOCATION OF POWER METER <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 9/19/2019 9/19/2019 ELEC 08-OTHER MCB NOT READY Gabriel 206-941-0310 <br /> (9/19/2019 11:19 AM MCB) <br /> Grounding and bonding.Scope of work to <br /> include new wiring in the house. <br /> 9/26/2019 9/26/2019 ELEC 05-SERVICE SKB CORRECTION 206-941-0310 Gabriel <br /> (9/26/2019 1:16 PM SKB) <br /> Physical protection for the meter.Provide <br /> AFCI and GFCI protection where required <br /> AFCI especially at the breakers.All wiring <br /> to be inspected after swing over for a new <br /> circuit and extended circuits. <br /> 10/7/2019 10/7/2019 ELEC 05-SERVICE SKB APPROVAL as noted. (10/4/2019 10:59 AM TKJ) <br /> Gabriel 206-941-0310 <br /> (10/7/2019 12:10 PM SKB) <br /> A final inspection required for new branch <br /> circuits that were extended or added. <br /> 10/24/2019 10/24/2019 ELEC 09-FINAL SKB NO ACCESS Gabriel 206-941-0310 <br /> 10/29/2019 10/29/2019 ELEC 09-FINAL TRA CORRECTION Plugs wired reverse <br /> polarity(backward) <br /> 11/4/2019 11/4/2019 ELEC 09-FINAL SKB CORRECTION Gabriel:206-941-0310 <br /> garage door will be opened <br /> (11/4/2019 2:54 PM SKB) <br /> All breakers have to be AFC I protected <br /> breakers for new wiring. <br /> 11/7/2019 11/7/2019 ELEC 09-FINAL TRA NOT READY AM inspection requested. <br /> 206-941-0310. <br /> 11/26/2019 11/26/2019 ELEC 09-FINAL SKB APPRVD-PERN Garage door will be opened if someone isnt <br /> present. <br /> Gabriel 206-941-0310 <br /> 11/26/2019 11/26/2019 ADMIN USE HPC APPROVAL <br /> ONLY** <br /> INSP12 <br /> airWs <br />