My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6304 FLEMING ST 2020-02-07
>
Address Records
>
FLEMING ST
>
6304
>
6304 FLEMING ST 2020-02-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 1:44:31 PM
Creation date
2/7/2020 1:44:12 PM
Metadata
Fields
Template:
Address Document
Street Name
FLEMING ST
Street Number
6304
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/28/2019 Page <br /> City of Everett <br /> 10:29:53AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1806-009 Site Address 6304 FLEMING ST <br /> Applied 6/28/2018 Applicant TOM ROCHON Lot <br /> Approved 7/20/2018 Owner STEWART CURT&MARGARET Block <br /> Issued 8/16/2018 Contractor GREG ROMO CONSTRUCTION LLC Tract <br /> Parent Permit No. Description KITCHEN REMODEL,REPLACE LOAD BEARING WALL W/B] <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 8/22/2018 8/22/2018 BLDG DWF APPROVAL Footing in basment <br /> 03-FOUNDATION <br /> 9/20/2018 9/20/2018 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 10/23/2018 10/23/2018 MECH 04-ROUGH SDP APPROVAL As noted Bath exhaust and stove exhaust OK as <br /> IN noted: <br /> Insulate sotve exhaust to R-4 minimum. <br /> Please add another hanger to stove exhaust. <br /> 10/25/2018 10/25/2018 BLDG DWF APPROVAL <br /> 08-FRAMING <br /> 10/29/2018 10/29/2018 BLDG KMK APPROVAL <br /> 11-INSULATION <br /> 10/31/2018 10/31/2018 BLDG DWF APPROVAL OK to cover <br /> 09-DRYWALL <br /> 1/17/2019 1/17/2019 PLUMB 06-FINAL DXW APPROVAL AM inspection requested <br /> 1/17/2019 1/17/2019 MECH 06-FINAL DXW APPROVAL <br /> 1/18/2019 1/18/2019 BLDG 14-FINAL DWF CORRECTION AM inspection requested <br /> Phone:425-501-5100 <br /> Correction: Need to install handrailing to <br /> 2nd floor upstairs as per IRC. <br /> 1/25/2019 1/25/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 1/25/2019 1/25/2019 BLDG 14-FINAL DWF APPROVAL As noted AM inspection requested <br /> Phone:425-501-5100 <br /> (1/25/2019 9:21 AM DWF) <br /> Secure hand-railing to wall as discussed <br /> with contractor, <br /> Not installed completely need more <br /> brackets and screws/positive connection. <br /> INSP12 ClilltVs VS TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.