Laserfiche WebLink
PUBLIC <br />WORK <br />Cy H <br />Item <br />Unit <br />Quantitv <br />Unit Price <br />Amour. <br />t" <br />PAVING <br />HEX <br />HEN <br />K y 0 <br />AC Pavement Pacching <br />O IF,! <br />H <br />(includes removal <br />g,y, <br />9.00 <br />CODH <br />of old oavement <br />Mz o <br />9" crushed rock, <br />S.Y. <br />4.00 <br />O H t7 <br />6" crushed rock, <br />S.Y. <br />6.00 <br />HC <br />O <br />2" Class B <br />S.Y. <br />4.00 <br />• <br />y�„ n <br />H <br />3" Class B <br />4" Class B <br />S.Y. <br />Co 80 <br />6.00 <br />t4 H <br />S.Y. <br />8.00 <br />y <br />Bank Run Gravel, 3" <br />H.y <br />(screened) in place <br />C.Y. <br />7.50 <br />N <br />0 C y <br />5/8" - crushed rock, <br />' <br />in place <br />C.Y. <br />-7 5• <br />15.00 <br />1 125.00 <br />x �-3 to <br />HO,rJ2 <br />Saw Cut AC oavement <br />it <br />¢,UO <br />2.00 <br />12 oO.00 <br />Other H. R T 3 <br />.._ <br />S. Y. <br />1 3 o <br />6.00 <br />8,1Go.00 <br />PAVING TOTAL <br />$ <br />1-4 565. oo <br />CtiRB AND GUTTER <br />.,a <br />I <br />v � <br />Curb 8 Gutter <br />Lc <br />4GO <br />6.50 <br />2,990.00 <br />Other <br />Re�+�ovc C-vrs'I uv C.vr(� <br />,( <br />LF <br />�, <br />,�lr� <br />I.nn <br />340.00 <br />CURB AND GUTTER <br />TOTAL <br />5 <br />3.3 30 .00 <br />