My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7502 EVERGREEN WAY 1ST INTERSTATE BANK 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
7502
>
1ST INTERSTATE BANK
>
7502 EVERGREEN WAY 1ST INTERSTATE BANK 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 11:00:11 AM
Creation date
2/11/2020 8:01:37 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7502
Tenant Name
1ST INTERSTATE BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H C3 <br />K A <br />A <br />I.n0O <br />H d <br />OH <br />N@8 <br />yQ Y (] <br />t' H <br />H•H <br />gy <br />00rn <br />H1-3M- <br />.....-._..,,.,.. <br />I <br />a e <br />7. <br />t <br />0 <br />Name of Project: <br />First Interstate Bank Remodel -Evergreen Way Branch <br />Construction Site Address: <br />7502 Evergreen Way, Everett, WA 98203 <br />Permit Reference: <br />ASSIGNMENT OF FUNDS TO THE CITY OF EVERETT <br />For: (describe improvements) <br />Provide off site curbs gutters and sidewalks as rpnliirpd by +hp City of Fyprptt <br />on 75th Street and Evergreen Way. <br />Improvements to be installed per City standards by <br />June <br />1990. <br />We hereby agree that the sum of Forty -Six Thousand Five Hundred and Eig <br />Uollars ($ 46,518.00 . ) will be held in RRRXRY'X Account <br />No. 303143238 in First Interstate Bank of Washington (hereinafter <br />referred to as "Bank") whose address is 999 Third Avenue, Fl. 5, Seattle, <br />WA 98104 , in the name of Evergreen Way Remodel <br />to assure performance of the above -described improvements and guarantee that <br />these funds will not be released without prior written approval from the <br />City of Everett Public Works Department (hereinafter referred to as <br />"City"). We agree that upon completion of the installation of the <br />above -described improvements per City standards and approval by the City, <br />the City will provide written notice to the Bank authorizing the release of <br />these funds. We further agree that these funds will be released to the City <br />upon notice by the City that the improvements have not been installed pet - <br />City standards. <br />Provided <br />further, however, that in tire event tire <br />auove-uescrrueu <br />improvements are installed per City standards and <br />a certificate <br />of partial <br />compliance is <br />signed by the City, their in that <br />event, <br />we are further <br />instructed to <br />release progress payments for the <br />amount <br />of improvements <br />installed per <br />City standards and approved by the City. <br />the <br />City shall have <br />first claim <br />and priority to the remaining <br />balance <br />of said sun <br />of Forty -Six <br />Thousand Five Hundred Uullars ($ 46 <br />518.00 <br />)• <br />and Eighteen <br />5/8B <br />SArG <br />IZ r3-Y� <br />teen <br />
The URL can be used to link to this page
Your browser does not support the video tag.