Laserfiche WebLink
(319)-390-0419 8/14/96 <br />AL BEN50N IST INTERSTATE BANK (WELLS FARGO BANK) <br />EVERETT BRANCH H 132 <br />ALRN STEVENS ASSOCIATES7502 EVERGREEN WAY <br />4090 7.1ST AVE SI.1 <br />EVERETT, 11A <br />CEDAR RAPIDS, IA 52404 <br />r,6 / 2 / 4IPN <br />INSTALL PABCO PRFIIIER 25 YEAR SHINGLES <br />1. <br />Tea.r. off. <br />exist:iny shake roof system. <br />2, <br />3, <br />Remove existing <br />Install <br />existing <br />cupola and save for reinstallation. <br />a 1/2" COX plYwoo(l 1.1nclerl.ayment• over the entire roof to rover <br />space sheathing. <br />4. <br />Install <br />3011) AST11 felt. <br />5. <br />6. <br />Install. <br />Install <br />s'.arter course. <br />a Fabco "Premier 25" roof system per manufacturer's specifications. <br />7. <br />8. <br />Install <br />Install <br />new ridge. <br />new "1.1" metal valley; 24 gauge coated 29" wide "W" valley metal. <br />9., <br />jr). <br />Install <br />Install <br />new drip edge metal. <br />new lead fl.ashings on soil vent pipes; one 1-1/2", one 2" an'l <br />one 3". <br />11. Install 8 new RVO-38 roof exhaust vents. <br />12. Reinstall cupola with new "L" braces. <br />Apply Karnak R97 al.uminum coating to approximately 900 square foot <br />13 section at a ate of 2 gallons per 100 square feet. <br />flat torchdowroof <br />14. Clean up and remove all debris from contracted work. <br />