Laserfiche WebLink
NE 1/4, SEC 13, T.28N., R.04E., W.M. <br /> SNOHOMISH COUNTY, WASHINGTON . <br /> � �� ,i"'� `�� t' ���� BMP SELECTION FOR OF TESC <br /> 1 <br /> � �����-; ���t = 56�.�� i � '' �' _, � - � , - � <br /> _ % �� � �= ELEMENT #t - MARK CLEAR�NG LIMITS: <br /> � j � 9.5�7 �'�,��;�r�r��,�, LIMT OF CONSTRUCTION ARE CLEARLY MARKED. NOTES <br /> / � BMP C103 <br /> 5"MAX�' 1. CATCH BASIN INSERTSSHALLBE REMOVEDATTHE <br /> � END OF THE PROJECT. <br /> � ;"='� ��j � � �`` � ELEMENT �2 - ESTABLISH CONSTRUCTION ACCESS: oRniNa�eeRnre � 1��� <br /> ,� ,� c� � THE EXISTIN� PAVED ENTRANCE WILL FUNCTION AS THE STABILIZED 2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN <br /> ;'�� � �,�� ,� � ` CONSTRUCTION ENTRANCE. , , . DRAINAGE DEVICES PER THE MANUFACTURES'S �' <br /> /// � ;i RECOMMENDATIONS.CATCH BASIN INLET INSERTS j <br /> � � ' / S �1 BMP C�OS GRATE FRAME -� �. SNALL BE INSTALLED IN CURB INLETS. I <br /> � / � ` - ---BELOW IONLEI'GRATE <br /> ' � � ELEMENT 3 - CONTROL FLOW RATES: SEDIMENT DEVICE 3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO <br /> �' � ��N� ��PERMEABLE PAVEMENT AREA� � AND DEBRIS QEARING AND GRADING AGTIVITY,OR UPON <br /> ,� � �O� FLOW IS MINIMAL. PLACEMENT Of A NEW CATCH BASIN. <br /> � � � � � ` NO BMP's ARE PROPOSED. <br /> �>� ��'� FILTERED WATER .�� <br /> S� : i - 4. SEDIMENT SHALL BE REMOVED fROM THE UNIT <br /> WHEN IT BECOMES ONE THIRD fULL OR IN <br /> S �68-�- \ ELEMENT 4 - INSTALL SEDIMENT CONTROLS: � , accoRoarvice wiTH rHe nn,ervuFAcruRes� ; <br /> � '� 69 tAe� � �PB� INLET PROTECTION IS PROPOSED. �; � i 1 irvsrRucTiorvs. � <br /> p � � <br /> �/ly� � � . � p�S� �� �.'�v t. < g BMP C220 � � <br /> �� �s ', - � 14 �� 5 REMOVING T E�INLETSINSERTS,EMPTYINGSANDgY i <br /> ,(/���` � � .. � �' . ELEMENT #S - STABILIZE SOILS: ' _ ___.-_-._'>' RE-INSTALLING IT INTO THE CATCH BASIN.DO NOT � <br /> �1 ��� � � � �� ' ��V � ��� - - ALL AREAS TO BE PAVED. WASH SEOIMENT INTO STORM DRAINS WHILE ' <br /> ~ . / ,. • � NO BMP's ARE PROPOSER . c�EANi"�. ; <br /> �, <br /> ! s9 S'`'`� S CALE• 1" = 20' ' <br /> . , 6. SIZE THE BELOW iNLET GRATE DEVICE(BIGD)FOR THE � <br /> ! �' � \cb s ELEMENT #6 - PROTECT SLOPES: sroRM warER srRucTuaE ir wi��sERvicE. <br /> � � • - - <br /> :' �• S • S s �� �806+� y N/A i 7. THE BIGD SHALI HAVE A BUILT-IN HIGH-FLOW RELIEF <br /> Ss�� �Ss�� s S NO BMP"s ARE PROPOSED i SVSTEM{OVERFLOW BYPASS). <br /> � ��, r ,� = 5�&� % - � .=�� `�. `':. - '9 J� ^,`' '� 'S'�t*��y - <br /> � � .o � ��. _ � 20 10 0 20 40 I SECTION VIEW <br /> ' '' ` � • h r:' 8j ELEMENT �(7- PROTECT DRAIN INLE(S: � 8. THERETRIEVALSYSTEMMUSTALLOWREMOVALOF ; <br /> �-�- - .> ��-� , :�D� � �� � � ,� -� � 559.5 B�, 1! ' THE BIGD WITHOUT SPILLING THE COLLECTED ' �. <br /> ' �. .,-�i 5s8 � INLET PROTECTIDNS ARE PROPOSED FOR THE STORM DRAINS. I nnareRia�. <br /> � > Y �.`�' � � $ , . _ _ <br /> __ _ _ _ <br /> BMP C220 � <br /> �'� �`f`� " � � �� ��� �� ��� � 9 PERFORM MAINTENANCE IN ACCORDANCE WITH <br /> �t q j���`y, f�� '� l RETRIEVAL SYSTEM _ <br /> � - <br /> �,, , �„, ��' STANDARD SPEQFlCATION 8-013�15j. <br /> �,, ; , . , Q.� � a,/1 \ ELEMENT#8 - STABILIZE CHANNELS AND OUTLETS: � -rvPicA� <br /> ,; �'' � �� , � �� �,��• �% 1 N�q, f'� � <br /> ' :h 4�� ` � ��. NO BMP's ARE PROPOSED. ; oRAiNA�E�RArE-- - � '; <br /> EX. F.H. _ ; _` �� FH � ``" o ! ��"�� �Q,- <br /> � ' � � <br /> (TO BE RELOCATED. ' � � �c� 559.50 � � � ELEMENT #9 - CONTROL POLLUTANrS: � � �--�� � �, <br /> SEE NOTE �2) `�` '»� _ • ` ` ALL VEHICLES, EQUIPMENT AND PETROLEUM PRODUCr SrORAGE/DISPERSING AREAS " � -''" �' _ � <br /> �� g°�• <br /> ,-�;� �� -� �� � (AB � ��5 . PB) � � � � � ``�. ' fi�-- � , <br /> , <br /> � � �� � 5�g � � S�� WILL BE INSPECTED REGULARLY TO DETECT ANY LEAKS OF SPILLS, AND TO � ��r , �=- i <br /> �,. <br /> � � �5 9• 5g9• IDENTIFY MAINTENANCE NEEDS AND PREVENT LEAKS OF SPILLS. _ <br /> - _ � � � � � . � � BMPs C151, C152 & C153. <br /> o � <br /> � c� W <br /> . , h,` 3e'�"�,e.� �.� / � - _ '' r � , , W . <br /> . ��' '� �� �� ! ELEMENT ��O - CONTROL DEWATERING: S BELOW INLET GRATE � j MA N�TENANCEAME T5 NOT�ES 1-SEPTABLE SUBSTITUTE IF ' <br /> � � � ". .� �'` '� ` P� } TNERE WILL BE NO DEWATERING AS PART OF THlS CONSTRUCTION PROJECT. a I �Evice �-�P cA ow svPass ; <br /> _ ����� 559.21 (AB � � � � -- <br /> � , NO BMP's ARE PROPOSED. � � � <br /> �_, �;�` °��, � s� , ��. � �, � o , � � ; � CITY OF EVERETT ; <br /> � �4 � � - <br /> � � � � ��� � � - � � <br /> �j � • �� ELEMENT #11- MAINTAIN BMP�S: �" � PUBLIC WORKS DEPARTMENT � <br /> - � � I� S 6 ALL TEST BMPs SHALL 8E MAINTAtNED AND REPAIRED AS NEEDED. W� � °r- �•-_� �r--- - <br /> � o, _ _ <br /> � �O G S BMP's C150 & C160. ISOMETRIC VIEW <br /> S 9 ' '' x�avsnss._ J iarncacnivrwl vnuiwune�m �""Esn_ �12/30/2016� <br /> <`'.t.�Np� � �''� � . SS� N (qqJ 5,' STORM DRAIN INLET ,F���;<,..�. <br /> � o' <br /> ti a�� <br /> ..� ' '`� �' � � T MP. T K � , �s;, � PROTECTION 210 ' <br /> ,�. �.� G ELEMENT #12 - MANAGE THE PROJECT.� <br /> � � .' �ss9 9,r \ E S OC THIS CDULD 8E ACNIEVED BY MINIMIZING THE EXTENT AND DURATION OF THE AREA �� � <br /> J� � �S PIlE BMP 2.6� EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN SEDIMENT CONrROL. <br /> �'• 5�fr ,_, � C 123 I BMP's C 105, C 160 & C 162. <br /> / 1 STORM DRAIN INLET PROTECTION <br /> ---;� L' �.. / 559.57 (AB � PB� <br /> i� � _ � ,� •55g.13 � � • pB � ELEMENT #13 - PROTECT ON-SITE STORMWATER MANAGEMENT BMP'S FOR RUNOFF <br /> � :� � / � � � �a �559��5� ,' s uYI FR�M ROOFS AND OTHER HARD SURFACES: STOCKPILE EXISTING TOPSOIL PER SO(L C2 N.T.S. (STD. DWG. 210) <br /> i� �y , /� s,f,fJ" g � AMENDMENT CALCULATION PER BMP T5.13. COVER STOCKPILE WITH PLASTIC <br /> % ` .� S � �. 5g.05 A , � � COVERING TO PREVENT EROSION. PERMEABLE PAVEMENT 5HALL BE CONSTRUCTED <br /> �� /vqN � ` - ��o � lAST, AS TO PREVENT FOULING OF THE PAVEMENT. IF PERMEABLE PAVEMENT IS <br /> ,� ; \ / � f R��� FOULED WITH SEDIMENT OR NO LONGER PASSIN� AN INlTIAL INFtLrRAT10N TEST, THE <br /> �G ' , y � O �� Q � � 559.35 z PAVEMENT MUST BE CLEANED USING PROCEDURES FROM THE CITY OR THE NOTL'�S <br /> / �`� � � O o-� �r . A�� o MANUFACTURER'S PROCEDURES. GEOTECHNICAL ENGINEER TO DIRECT PREPARATION <br /> ' �' � � � O 559 2 26 � o OF THE SUBGRADE AND CONFIRM IT MEErS THE DESIGN INFtLTRA�ION RATES PRIOR CITY STREETS ARE TO BE KEPT CLEAN OF DIRT AND DEBRIS AT <br /> : <br /> c � ' \ � � � �55$' cn cN ALL TIMES DURING CONSTRUCTION, DUST SUPPRESSION AND <br /> f' ,� ,,�-��,�,C ����,�, �r ��p � � Q (T ) / �� -. TO PLACING ANY REMEDIATION SOILS OR GRAVEL HIGH VISIBIL11Y FENCE SNALL BE <br /> > � �� /'� ���- � PLACED ARDUND THE AREA PROPOSED FOR PERMEABLE PAVEMENT TO PREVENT STREE1' CLEANING MUST OCCUR AS DtRECTED BY PUBLIC WORKS <br /> , � � 0.3'(Sj & J.2'(t j �Jr C��iJEk ; ���`� � � �: � � <br /> . s� : INSPECTOR. <br /> . f - �" �p.�l LQ J �� �� � 59 22 AB 1��� 8 4� COMPACTION OF THE SOIL (BMP C 103) ' <br /> � v <br /> �,'J' � yy6$ / �. Pg � v ALL EXPOSED GROUND MUST BE RESEEDED WITHIN 30 DAYS OF <br /> � � „� j� ;,�n� r�-, ���j y� � OOo� 5a�g ( yh.7% / V COMPLETION OF CONSTRUCTION. IF RESEEDIN� IS NOT PRAT1CAL <br /> \`�j�J' iE� t�" PbC(W�= 555.8? �. ��l �/� + � DUE TO WEATHER OR SEASONAL PROBLEMS, THE GROUND MUST <br /> ,' ` � y� A �1 °° TESC& GRADING NOTES BE COVERED WITH MULCH AS DIRECTED BY THE CIT1' ENGINEER. <br /> , � � �[ � 1g <br /> % �� \,ys, yh�'' ��"� . 5� TEMPORARY EROSION CONTROL MEASURES FOR CONSTRUCTION <br /> � �� 1. THE TEMPORARY EROSION CONTROL SYSTEM SHALL BE INSTALLED PRIOR TO ACTIVITY MUST BE OPERATIONAL PRIOR TO COMMENCEMENT OF <br /> � o� � �0�� ALL OrHER CONSTRUCTION. ANY CLEARING OR EARTHWORK. <br /> �� <br /> `S8• �'S � ��� 5�4�AB� 2. WHERE POSSIBLE, MAINTAIN NArURAL VE6ETATION FOR SILT CONTROL. <br /> �6' �- '� � �y �` GRADING QUANTITIES.• <br /> S � � �G � 3. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE <br /> ��0�� �, \ Q ^ EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS CUT: 50 Cu.Yds. . <br /> � '11' REQUIRED BY THE CITY EN�INEER TO ENSURE CONTINUING TESC NOTES <br /> � �` _� EROSION/SEDIMENTATION CONTROL FILL: SO CU.YCIS. , <br /> � X� GRADIN� QUANTITIES WERE CALCULATED USIN6 THE LAND <br /> ys, 4. ALL DISTURBED AREAS THAT WILL BE LEFT FOR 30 DAY.S OR MORE DURING �, qPPROV.4l OF THIS EROSlON/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN DEVELOPMfNT DESKTOP COMPOSITE METHOD. CALCULATIONS DO NOT <br /> THE PERIDDS OF MARCH 1 TD MAY 15 AND AUGUST 15 TO OCTOBER 1 SHALL <br /> APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN EG. SlZE AND LOCATION OF ROADS, ACCOUNT FOR SOIL SWELUNG AND SHRINKA�E. <br /> u- ��,�n �� � _ �' �, BE IMMEDIATELY SEEDED WITH A MIX AND BY A METHOD APPROVED BY THE � � <br /> ?'_' � CITY OF EVERETT PUBLIC WORKS DEPARTMENT AND MAINTAINED UNTIL SEED P1PES, RESTRIC7'ORS, CHANNELS, RErENTION FACIL/TIES, UTILITIES). <br /> �,,5 - - ' GERMINATION IS ASSURED. IN ADDITIDN TO SEEDIN�, SLOPES OF 25� OR T.E:S.C. LEGE'ND <br /> GREATER WILL BE MULCHED WITH 2.0 TONS OF STRAW PER ACRE, OR WITH AN 2. THE iMPLEMENTATION OF THESE ESC PLANS AND 1}1E CONSTRUCTION, MAINTENANCE, <br /> APPROVED EOUAL REPLACEMENT AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE � � <br /> ' APPLICANT/CONTRACTOR UN7tL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND CLEARING LIMITS <br /> S , DURING TNE REST OF THE YEAR, TEMPORARY SOIL STABIUZATION MUST BE VEGETArION/LANDSCAPING IS ESTABLISNED. CL <br /> � APPLIED IMMEDIATELY TO DlSTURBED AREAS THAT WILL BE LEf7 EXPOSED FOR <br /> � - � 7 DAYS OR MORE, AND IMMEDIATELY TO SLOPES GREATER THAN 259' WILL BE 3. THE BOUNDARIES OF THE CLEARING LIM�TS SHOWN ON TH�S PLAN SHALL BE CLEARLY <br /> � -' ` `` - I LEFT ExPOSED FOR 3 DAYS OR MORE FLAccED IN rHE RELD PRroR ro coNsrRucrloN. ouRlNc rHE coNstRucrloN PER1oD, No SF SF SILT FENCE. BMP C233 <br /> �`r ~ 5. THE PUBLIC RIGNT-OF-WAY SHALI BE KEPT CLEAN. TRACKING OF MUD AND DISTURBANCE BEYOND THE FIAGGED CLEARING LIMITS SHALL BE PERMIiTED. THE FLAGGING <br /> - I �� DEBRIS FROM THE SITE WtLL NOr BE ALLOWED. FAILURE TO COMPLY W1TH rHIS SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR 7HE DURATION CATCH BASIN INSERT <br /> ` OF CONSTRUCTION. PROTECTION TYP. <br /> _ _ _ __ _ ___ _- .. _ _ _ _ CONDITION WILL RESULT IN ALL WORK ON THE SIrE BEING STOPPED. � � ) <br /> - _ __ _ __ _ _ _ _ __ _ _ �1 n BMP C220 = <br /> v � 4. THE ESC FACILITIES SHOWN ON THIS PL4N MUS7 BE CONSTRUCTEO IN CONJUNC710N WITH ALL <br /> __.__ _ <br /> 6. GRADING OUTSIDE CITY RIGHT-OF-WAY SHALL CONFORM TO CHAPTER 70, CLEARING AND GRADING ACTIVITIES, AND W SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND <br /> UNIFORM BUILDING CODE. SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br /> APPLICABLE WATER QUALIIY STANDARDS. � � � PERMEABLE PAVEMENT <br /> ( 7. COMPACT ALL FILLS TO MINIMUM 95� MAXIMUM DENSITY. <br /> 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANT(C/PATED <br /> 8. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACIUTIES SNALL 8E �� <br /> �-„p � �� � COLLECTION FACILITlES TO INSURE THAT SEDfMENT-LADEN WATER DOES NOT UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND 70 ENSURE TNA7 SED/MENT AND <br /> � '�� � SEDIMENT-LADEN WATER DO NOT LEAVE THE SlTE. <br /> - --- ENTER THE NATURAL ORAINAGE SYSTEM. AS CONSTRUCTION PROGRESSES AND <br /> UNEXPECTED (SEASONAL� CONDITIONS D�CTATE, MORE SILTATION CONTROL 6. THE ESC FACIUTIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED 8Y THE This Record Drawing has been prepared, in part, based <br /> � � FACIUTIES MAY BE REQUtRED TO INSURE COMPLETE SILTATION CONTROL OF <br /> CONTRACTOR RESPONSIBILITYFOR EROSION�SILTATION CONTROL ' ` ' THE PROPOSED PROJECL THEREFORE, DURING lHE COURSE OF CONSTRtJCTION EVEN SANT/CONTRAC70R TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECiALLY A�ER STORM on"AS-Built" information provided by others.Though <br /> IT SHALL BE THE OBLIGATION AND RESPONSIBIUIY OF THE CONTRACTOR TO the as-built information and this drawing are based on <br /> ADDRESS ANY NEW CONDITlONS THAT MAY BE CREATED BY NIS AC7IVITIES AND the best available irformation, no presumption should <br /> IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN TNAT STORM WATER RUNOFF 8E 7. THE ESC FACILITIES ON INAC7IVE SITES SHALL BE /NSPECTED AND MAINrAINED A MINIMUM OF , <br /> CONTROLLED AT ALL TIMES TO PREVENT SOII EROS�ON AND TO MAINTAIN WATER QUALITY. ANY AND ALL , �, TO PROVIDE ADDITIONAL FACILITIES THAT MAY BE NEEDED TO PROTECr ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. 2 tT18d2 I'2g8fd�flgthe dC8WIt1gS BCCUfBCy. <br /> ADJACENT PROPERTIES. , � ' <br /> MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY TNE CONTRACTOR. _ _ .__ _._._ _ _ '� � ` 8. Ar No rIME sHALL MORE tHAN oNE Foor oF sEDIMENr BE ALLowED ro AccuMUl.ArE wlrNrN A - ��'"p ����f�� <br /> � � 9, SUITABLE NAT1vE MATERIAL EXCAVATED DURING TRENCHiNG SHAII BE USED FOR TRAPPED CATCH ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO � Date � <br /> 1. REGARDLESS OF SITE, WEATHER, SOIL OR OTNER CONDITIONS, THE CONTRACTOR SHALL BE FULLY _ - TRENCH BACKFILL UNLESS NOTIFlED BY THE CI1Y ENGINEER THAT THE NATIVE PAVING. THE CLEAN(NG OPERATION SHALL NOT FLUSH SEDIMENT tADEN WATER INTO THE SI ned By <br /> RESPONSlBLE FOR ENSURtNG THAT EROSION DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR ' MATER�AL IS UNSUITABLE THE CITY ENGINEER, OR HIS REPRESENTATIVE, W�LL oowNsrREaM SrsrEM. � Permit Ins ector <br /> SILT-LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, SrREAM, WETLAND OR EXAMINE EXCAVATED NATIVE MATERIAL AT THE TIME OF EXCAVATION TO � p <br /> WATER BODY ON THE SITE. ,� DETERM(NE ITS SUITABILITY FOR USE AS BACKFILL. NATNE MATERIAL WILL BE 9. STABILIZED CONSTRUC�ION ENTRANCES SHALL BE INSTALLED Ar rHE BEGINNIN6 OF Print Name&Titie <br /> �� CONSIDERED SUITABLE FOR TRENCH BACKFILL IF IT IS: CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES <br /> 2. BEYOND rHE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE RESPONSIBLE ( \ MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF <br /> FOR SELECTING AND IMPLEMENTlNG APPROPRIATE METHODS, 'BEST MANAGEMENT PRACTICES" (BMPs), FOR � A. CAPABLE OF ATTAINiNG THE DEGRE£ OF COMPACTION SPECIFIED 1N D THE PROJECT. <br /> STORM WATER TREATMENT AND CONTROL THAT MEEr THE REQUIREMENTS OF BOTH TNE WASHINGTON STATE � � �' ,;� COMPACTION. <br /> DEPARTMENT OF ECOLOGY AND THE CITY OF EVERE77. o sr� B. WITHIN REASONABLE TOLERANCE OF OPTIMUM MOISTURE CONTENT. ]0. THE CONTRAC7oR SHALL PROVIDE PERIODIC STREE7 CLEANING TO REMOVE DEBRIs AND SEDIMENT <br /> w �' �� ,� C. REASONABLY FREE OF ORGANIC MATERIAL, CLAy FROZEN LUMPS, ROCKS TRACKED OFF TNE S17E. <br /> 3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE PROJECT ENGINEER o OR OTHER DELETERIOUS MA7TER. 11. APPROPRIATE MEASURES SHALL eE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER ' i �' <br /> AND THE CITY 1NSPECTOR. IN TNE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE = C' BODIES IF THE PROPOSED BMPS FAIL. I <br /> INEFFECTIVE AT CONTROLLING EROSION AND SILTATION, TNE CONTRACTOR SHALL IMMEDIATELY REPORT TO ;- _ � " 10. UNSUITABLE BACKFILL MATERIAL SHALL BE REMOVED FROM THE SITE AND i., ' <br /> AND CONSULT WITH THE PROJECT ENGINEER TO FIND AN APPROPRlATE REMEDY. ALL CONSTRUCTION �, HAULED �0 AN APPROVED DISPOSAL SITE. THE CITY ENGINEER SHAL! BE { <br /> rn ^ � PROVIDED WITH TNE LOCATION OF ALL DISPOSAL S1TES TO BE USED AND ALSO 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR ND �. <br /> ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION CONrROL MEASURES, SHALL CEASE UNTIL � MORE THAN 2 DAYS FROM OCTOBER i THROUGH APRIL 30, AND FOR NO MORE TNAN 7 DAYS <br /> SUCH TIME AS TNE WATER QUALlTY IS BROUGHT UNDER CONTROL. N �, -�� COPIES OF TNE PERMITS ANO APPROVALS OF SUCN DISPOSAL SITES. FROM MAY 1 THROUGH SEPTEMBER 30. <br /> � �P��9��T E6VGI�iIEERIPl6 ��m <br /> 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM ' � 11. IMPORTED MATERIAL SHALL MEET TNE REQUIREMENT OF GRAVEL BORROW AS P,O. BOX - 1475 <br /> ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF rNE WEArHER. ' SPECIFIED IN SECTION 3.16.1.3 OF THE DESIGN AND CONSTRICTION STANDARDS <br /> AND SPECIFICATIONS, OR CRUSHED SURFACING TOP COURSE AS SPfCIFIED IN EVERETT, WA 9gZOE) <br /> 5. ALL SUPPLIES AND MArERlALS NECESSARY FOR IMPLEMENTING BMPs SHALL BE STORED ON SITE AND SHALL SECr10N 9-03.9(3) OF TNE 1991 STANDARD SPECIFICATIONS FOR ROAD, (425) 303-9363 (425) 303-9362 FAX <br /> BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED � � BRIDGE AND MUNICIPAL CONSTRUCTION. ________ ____ ___ ___ __ __ INFO@INSIGHTENGINEERING.NET <br /> T0, STRAW BALES OR OTHER MULCHING MATERIAL, SIL� FENCING AND STAKES, FILTER FABRIC, ETC. <br /> �,�, � �0 12. TRENCH BACKFILL SHALL BE SPREAD !N LAYERS AND COMPACTED BY <br /> 6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR SHALL MONITOR ALL EROSION > r'�� . < ^ ' ��' ,` MECHANICAL rAMPERS OF THE IMPACT 1YPE APPROVED BY THE CI1Y ENGINEER. - -- SITE ADDRESS: 8525 EVERGREEN WAY <br /> CONTROL MEASURES AND SHALL PRIORITJZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATlON ` ;,\\ �� ��y THE BACKFILL MATERIAL SHALL BE PLACED IN SUCCESSlVE LAYERS WITH THE EVERETT, WA. 98208-2616 <br /> _ _ - - __ <br /> CONTROL MEASURES ABOVE ALL OTHERS. `���� CS �� FIRST LAYER NOT TO EXCEED 2 FEET ABOVE THE PIPE, AND THE FOLLOWIN� 1 AS-BUILr SJM 02-06-2020 <br /> '���`. ��F LAYERS NOT EXCEEDING 12 INCHES IN LDOSE THICKNESS, WITH EACH LAYER <br /> ��\' \ / p�� BEING COMPACTED TO THE DENSITY SPECIFtED BELOW: REV. N0. DESCRIPTION INITIALS DATE TAX ACCOUNT N0.'S: 28041300103900 <br /> \� � �1� /i A. IMPROVED AREA SUCN AS STREET AND SIDE WALK AREAS SHALL BE <br /> ��� = � COMPACTED TO 90% OF MAXIMUM DRY DENSfTY TO WITHIN 3 FEET OF <br /> ; <br /> L- � i' /,�� SUBGRADE. THE LASr 3 FEEf SHALL BE COMPACTED TO 95% OF MAXIMUM � R• f� <br /> �.���� � _ _ _� , ��'��---____ " �� � oRY oENsin. ,�Fw o� WAs�rl�� NE 1/4, SEC 13, T.28N.,R.04E., W.M. � . <br /> , <br /> ;�� '�� � � � � 8. UNIMPROVED AREAS OR LANDSCAPE AREAS SHALL BE COMPACTED TO 90q OF ��,�" J`� ��� B UltGER �N� <br /> /�� �i ` <br /> } \��,�, � � � MAXIMUM DRY �ENSITY. Q� �, e z <br /> �� � � <br /> 6 ;%' �� /� <br /> - '-- // 13. TEMPORARY SILTATION PONDS AND ALL rEMPORARY SILTATION CONTROLS SHALL DWG FILENAME DESI6NED BY.� DATE: SCALE: JOB NO.: <br /> ' f ,, q W <br /> /^,�; / BE MAINTAINED tN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT p� ��36499 ¢�,�,�v 180961-AB.DWG JRC 10-16-2018 1"=20� I8-0961 <br /> t l ;, � ,�� CLEARING AND/OR CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE �'s js T� Cs <br /> ,,% ��---^-t-�r�►-r , - FACIUTIES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION HAS PASSED. `sI�NAL �� AS-BUIL.T SHEEf <br /> �, <br /> �V ��`'''_,� �, <br /> ; , �. <br /> \�'� " ��"'�- 14. APPROUAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, <br /> SIZE, NOR LOCATION OF PIPES, RESTRICTORS, OR DE(ENTION FACILITIES; BUT 02-06-2020 GRADING AND SWPP PLAN C�.O <br /> IS AN APPROVAL OF GRADING AND SEDIMENTATION CONTROL PLAN ONLY. <br />