|
`'i` s 4�� w'ry a°r� Z" �` � b,lycy� j "�r i�-�• Y` �k ,i�.,t f'� �y� � a{. `'ax s ��;*c t.�:v�y$��,� .�t �3� �.�,, 1-��y �f� . �, :r �§y g �, .
<br /> ,v���`' &� � .�A' t" � a x,�3 � a�.• �,a ��3,:�. �_..� .:,?'< z...,.� '�� 5 e�' .x..w�.��.e,�„ �'�.� , ,� s..,a�` t �3` �.��5.w � ' }. � ,e'��'x �e`_.
<br /> . � �.�
<br /> /RR/GA T/ON S�HEDULF ^ �
<br /> SYMBOL MANUFACTURER/MODEI/DESCRIPTION � pg� /RR/GA T/ON S�HEDUL,E /RR/�A T/ON SPEC/F/CA T/ONS Q � o
<br /> �
<br /> GENERAL REQUIREMENTS/)OB CONDITIONS N ,�
<br /> � � � �' � � � HUNTER PROS-04 ADJ 78 40 � WATER METER 1" 1
<br /> TURF SPRAY,4.0"POP-UP. CO-MQLDED WIPER SEAL WfTH UV RESISTANT 1.} SCOPE: 12.) CONTROL WIRE FOR VALVES:
<br /> MATERIAL. ,ti,�� �' £
<br /> 1NATER METER 1" 1 WORK INCLUDES ALL DESIGN,IABOR,MATERIALS,EQUIPMENT,AND SERVICES NEGESSARY TO COMPLETE THE IRRIGATION SYSTEM,BALANCED AND READY 1.)INSULATED,SINGLE STRAND COPPER DESIGNED FOR 2450 VOLTS AND UL APPROVED AS UF(UNDERGROUND FEEDER) UL AND UF DESIGNATIONS =
<br /> s� � � ry � {�. F;� FOR OPERATION AS SPECIFIED.PROVIDE AUTOMATIC SYSTEM IN ALL LANDSCAPED,SODDED AND SEEDED AREAS INDICATED ON PLAN PROVIDED BY CLEARLY MARKED OR EMBOSSED ON THE INSULATION JACKET OF THE WIRE COPPER CONDUCTOR MUST MEfT OR EXCEED ASTM B-3 SPECIFICATIONS. Q
<br /> HUNTER PROS-06 SMORT RADIUS NOZZLES 325 40 WATER METER 1" 1 OWNER. "
<br /> SHRUB SPRAY,6.0"POP UP. CO MOLDED WIPER SEAL WITH liV RESISTANT IN NO CASE SHALL WIRE BE LESS THAN 14 GAUGE. �
<br /> MATERIAL -- IRRIGATION LATERAL LINf:PVC SCHEDULE 40 35,980 L.F. 2.) GODES AND QRDINANCES: 2.)WHERE CONTROL WIRE LEAVES MAIN OR�ATERAL LINE ENCIOSE IT IN CLASS 200 PVC CONDUIT, v
<br /> 3.)SEPARATE"HOT"(RED OR BLACK)LEAD FOR EACM VALVE. COMMON WIRE(WHITE)FOR EACH CONTROLLER.SPARE WIRE(DIFFERENT COLOR THAN W
<br /> � � � � � PVC SCHEDULE 401RRIGATION PIPE.ONLY LATERAL TRANSITION PIPE SiZES ALL�QCAL,MUNICIPAL,AND STATE LAWS,RULES,AND REGULATIONS GOVERNING OR RELATING TO ANY PROTION OF THIS WORK ARE HEREBY HOT OR COMMON)TO RUN FR�M CONTROLLER TO THE END VALVE ON EACH LEG OE�THE MAINLINE.IDENTIFY EACH SPARE AT THE CONTROLLER. p �
<br /> HUNTER PROS-06 5 STRIP SPRAY 269 40 1 AND ABOVE ARE INpICATED ON THE PLAN,WITH ALL OTHERS BEWG 3/4 IN INCORPORATED INTO AND MADE A PART OF THESE SPECIFICATIONS. IDENTIFY WIRE COLOR ON THE AS-BUILTS. � �i
<br /> SHRUB SPRAY,6.0"POP-UP. CO-MOLDED WIPER SEAL WITH UV RESISTANT SIZE � q
<br /> MATERIAL. 3.) SUBMITTALS:
<br /> 13.}SPUCES: � c�'.�
<br /> �j �.� � I R R I G A T I O N M A W L I N E:B l.U-L O C K A N D P V C C L A S S 2 0 0 8,261 L.F. PRODUCTS AND MATERIALS:IMMEDIATELY AFTER AWARD OF CONTRACT,SUBMIT CUT SHEETS FOR THOSE PRODUCTS NOT SPECIFIED B Y M A N U F A C T U R ER WATERTRIGHT ELECTRICAL SPLICES WITH 3M,SCOTf'S LOCK SEAL TACK 3567-78,PEN-TITE PVC SOCKET OR RAINBIRD ST-03 WITH PT-S5 SEALER. N � �
<br /> HUNTER PROS-06 5� RADIUS 19 40 BLU-LOCK PIPE,AS MANUFACTURED BY HYDRO RAIN,1/2"TO 1",THEN PVC OR THOSE SUBMITTED FOR APPROVAL o � Q
<br /> ' SHRUB SPRAY,6.0"POP-UP. CO-MOLDED WIPER SEAL WITH UV RESISTANT CLASS 200 FOR 1-1/4"AND LARGER. 14.)SLEEVES: � � �,
<br /> MATERIAI. 4.) PERMITS AND FEES:
<br /> PROVIDE PVC PIPE SLEEVES AT MINIMUM SIZE DOUBLE THE DIAMETER OF THE ENCLOSED IRRIGATIONS LINES.USE SCHEQULE 40 PVC FOR SLEEVES,SAME
<br /> �;� �; �-; t= ��..�.�.�,�� PIPE SLEEVE;PVC CLASS 200 SDR 21 4,973 L.F. OWNER WILL OBTAIN AL�PERMITS AND PAY A(�L FEES TO ANY GOVERNMENTAL AGENCY HAVING JURISDICTION OVER THE 4VORK;CONTRACTOR TO � W �
<br /> �.e..,.�...�.,_v��.
<br /> � � DEPTH AS REQUIRED FOR PIPING,EXTfND 12"INTO PLANTING BED,CAP AND FLAG ENDS. �
<br /> HUNTER PROS-06 8� RADIUS 147 40 Valve Caliout = �
<br /> ARRANGE FOR INSPECTIONS,TESTING,AND CERTIFICATION IF REQUIRED.
<br /> SHRUB SPRAY,6.0"POP-UP. CO-MOLDED WIPER SEAL WITH W RESISTANT - Valve Number � �
<br /> MATERIAL # � #• 5.) IRRIGATION BIQDER DESIGN SHOP DRAWINGS: INSTALLATION � �
<br /> � - Valve Fiow CONTRACTOR SNALL PREPARE A COMPLETE SET OF SHOP DRAWINGS FOR THE ENTIRE SYSTEM FOR APPROVAL BY LANDSCAPE ARCHITECT.CONTRACTOR � Q Z -
<br /> HUNTER PROS-06 9' SIDE STRIP SPRAY 4 40 - � �
<br /> SHRUB SPRAY,6.0"PQP-UP. CO-MOLDED WIPER SEAL WITH UV RESISTANT ° � - SHALL SUBMIT IRRIGATION DESIGN DRAWINGS AND HYDRAULIC CALCULATIONS A MINIMUM OF TWO(2)WEEKS PRIOR TO START OF IRRIGATION SYSTEM W = Q
<br /> # Valve Size 1.)PRIOR TO STARTING WORK: �
<br /> MATERIAL. -- -- INSTALLATION FOR REVIEW BY LANDSCAPE ARCHITECT.LANDSCAPE ARCHITECT WILL REVfEW DRAWINGS FOR NOT MORE THAN A ONE(1)WEEK PERIOD � � � �
<br /> AND SUBMIT COMMENTS TO THE CONTRACTOR. APPROVAL OF PLANS AND MATERIALS BY THE LANDSCAPE ARCHITECT DOES NOT CHANGE THE CONTRACTOR SHALL ATTEND A PRE-CONSTRUCTION CONFERENCE WITH OWNER'S PROJECT MANAGER SUPERINTENDENT,OWNER'S REPRESENTATIVE
<br /> '`�"�a> �� �'�'i,) � CONTRACTOR'S RESPONSIBILITY FOR THE DESIGN AND INSTALLATION OF A PROPERLY WORKING SYSTEM. CONSTRUCTION WORK WILL NOT PROCEED AND/OR LANDSCAPE ARCHITECT TO DISCUSS PROJECT REQUIREMENTS,CHANGED SITE CONDITIONS,PHASING AND OTHER ISSUES. �
<br /> HUNTER PROS-06 10� RADIUS 321 40 � W Q
<br /> UNTIL THE DESIGN REVIEW PROCESS IS COMPLETE. SUBMIT PRODUCT QATA WITH DESIGN PtAN.INCLUDE DATA FOR ALL SUBSTITUTE PRODUCTS TO BE 2,}INSPECTIONS/VERIFICATION/ADJUSTMENTS: 0 � �
<br /> SHRUB SPRAY,6.0"POP-UP. CO-MOLDED WIPER SEAL WITH UV RESISTANT PRQPOSED FOR USE IN THIS SYSTEM. WCLUDE MATERIAL SHOWING MANUFACTURER'S NAME,CATALOG CUTS,TECHNICAL DATA,AND MANUFACTURER'S � � �
<br /> MATERIAL. 1.D I S C R E P E N C I E S:U P O N I N I T I A T I O N O F W O R K O R A T E A R L I E S T T I M E D I S C O V E R E D,R E P O R T A N Y D E V I A T I O N S B E T W E E N T H E C O N T R A C T O R-P R E P A R E D Q �v �
<br /> 1/.4L VE SCHEDULE INSTALLATION,OPERATION,AND MAINTENANCE INSTRUCTIONS FOR EACH PRODUCT.SHOP DRAWINGS SHALL lNCLUDE,BUT NOT BE LIMITED T0,THE IRRIGATION DRAWINGS AND THE SITE. FAILURE TO DO SO PRIOR TO THE INSTALLING OF EQUIPMENT,AND RESULTING IN REPLACING,AND/OR v � �
<br /> � � � � � � HUNTER PROS-0612� RADIUS 78 40 FOLLOWING ITEMS: R E L O C A T I N G,O R A D D I T I O N A L E Q U I P M E N T,S H A L L B E D O N E A T C O N T R A C T O R'S E X P E N S E. o .��
<br /> SHRUB SPRAY,6.0"POP-UP. CO-MOLDED WIPER SEAL WITH UV RESISTANT NUMBER MODEL SIZE TYPE PSI PSI C�POC GPM PRECfP 1.)PIPING LAYOUT AND SIZING FOR BOTH MAIN AND LATERALS 2.AVAIIABLE PRESSURE VERIFICATION: PRIOR TO THE START OF ANY WORK,VERIFY THE STATIC PRESSURE AT POINT OF CONNECTION. NOTIFY OWNER
<br /> MATERIAI. PRIVATE 1 HUNTER PGV-151 ANGLE 1-1/2° SHRUB ROTARY 47.01 55.41 15.37 0.53 in/h 2.)VA�VE TYPES,SIZES AND LOCATIONS. IN WRITING OF PRESSURE AVAILABLE FOR APPROVAL TO PROCEED.
<br /> ,.,� � � ,- 2 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.04 62.45 28.08 2.60 in/h 3.)LOCATIONS FOR MANUAL DRAINS AND QUICK COUPLERS. 3.CONFLICT WITH UTILITIES AND PLANT MATERIALS: LOGATE IRRIGATiON LiNES TO AVOID EXISTING AND PROPOSED UTILITY L�NES,AND PROPOSED
<br /> � � � HUNTER PROS-06 15� RADIUS 7 40 3 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 46.41 65.34 17.81 2.55 in/h 4.)PO1NT OF CONNECTION SHOWING BACKFLOW PREVENTION DEVICE,STRAINER,PRESSURE REGULATOR,AND SHUT-OFF VALVE. PLANT MATERIAL LOCATIONS AND ANY EXISTING TREES.MINOR FIELD ADJUSTMENTS TO SHRUBS MAY BE MADE WITH APPROVAL,TO AVOID �� ��
<br /> SNRUB SPRAY,6.0"POP-UP. CO-MOLDED WIPER SEAL WITH UV RESISTANT 4 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 45.90 76.53 24.66 2.53 in/h EQUIPMENT. �
<br /> MATERIAI. 5 NUNTER PGV-151 ANGLE 1-1/2" SNRUB SPRAY 46.44 55.31 15.42 1.23 in/h 5.)HEAD TYPES AND LOCATIONS{USE DIFFERENT SYMBOLS FOR EACH HEAD TYPE AND EACH PATfERN OF SPRAY) � �
<br /> � � � ��� HUNTER PROS-06 ADJ 637 40 7 HUNTER PGV-151 ANGLE 1-1/2° SHRUB SPRAY 48.78 68.35 29 48 1.51 in/h THE ABOVE tTEMS SHALL BE INCLU�ED ON A SYMBOL LEGEND. THE SHOP DRAWING SHALL BE SUBMITTED ON A 24"x36"REPRODUCIBLE SHEET,DRAWN
<br /> IN PENCIL OR INK WITHOUT COLOR FOR DIFFERENTIATION,AND SHALL BE NEAT AND LEGIBLE. 3.)REVIEW BY OWNER/AGENCIES:
<br /> SHRUB SPRAY,6.0"POP-UP. CO-MOLDED WIPER SEAL WITH UV RESISTANT 8 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 46.07 57.01 24.34 1.36 in/h
<br /> MATERIAL. 9 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 45.42 52.94 16.58 1.83 in/h 1.)OWNER'S REPRESENTATIVES OR LANDSCAPE ARCHITECT WILL REVIEW THE IRRIGATIGN SHOP DRAWING FQR GENERAL CONFORMANCE WITH THE
<br /> - - - 10 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 44.64 50.39 4.45 0.52 in/h 6.)AS-BUILT DRAWINGS: SPECIFICATIONS AND DETAILS. APPROVAL DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY TO GUARANTEE COMPLETE COVERAGE FOR THE
<br /> HUNTER MP1000 PROS-04-PRS40-CV 24 40 11 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 49.07 59.77 24.71 1.16 in/h FURNISH THE OWNER WITH TWO SETS OF BLUELlNEPRINTS SHOWING ALL IRRIGATION WORK REQUIRED UNDER THIS CONTRACT.RECORD ON THESE STATE OF
<br /> ENTIRE SYSTEM.
<br /> PRINTS,ON A DAILY BASIS,ALL GHANGES MADE DURING THE ACTUAL INSTALLATION OF THE SYSTEM. AS-BUILTS ARE TO BE ON-SITE AT ALL TIMES FOR 2,}AFTER APPROVAL OF THE IRRIGATION LAYOUT SHOP DRAWING,NO ADJUSTMENTS SHALL Bf MADE WITHOUT WRITTEN APPROVAL OF OWNER. WASHI NGTON
<br /> TURF ROTATOR,4"(10.16 CM)POP-UP WITH CHECK VALVE,PRESSURE 12 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 46.53 57.06 19.68 1.62 in/h REVIEW. 3.)WATER SERVICE CONNECTIONS SHALL CONFORM TO THE REQUIREMENTS SET FORTH BY THE SUPPLYING AGENCY. REGISTERED
<br /> REGUTATED TO 40 PSI(2.76 BAR),MP ROTATOR NOZZLE ON PRS40 BODY. 13 HUNTER PGV-151 APIGLE 1-1/2" SHRUB SPRAY 46.68 61.91 28.68 1.39 inJh
<br /> M=MAROON ADJ ARC 90 TO 210,L=LIGHT BLUE 210 TO 270 ARG,0=0LIVE 14 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 43.08 48.90 2.65 0.99 in/h 7.�oaER�TioNs�naNUA�: LANDSCAPE ARCHiTECT
<br /> 360 ARC. 15 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 43.19 49.32 4.15 4.57 in/h 4.)LAYOUT OF SPRINKLER IRRIGATION SYSTEM:
<br /> - - - 16 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.37 61.5Q 20.40 1.56 in/h �0 MANUA�S,BOUND IN HARDBACK COVER,SHALL BE SUBMITfED FOR APPROYAL AT THE TIME OF PRESSURE TESTING. IT SHALL WCLUDE AS A STAKE THE SPRINKLER IRRIGATION SYSTEM FQLLOWING THE APPROVED DESIGN SHOWN ON THE PLANS BEFORE THE CONSTRUCTION BEGINS.MAKE
<br /> _ _ _ HUNTER MP20Q0 PROS-04-PRS40-CV 14 40 17 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.91 65.21 27.62 1.35 in/h MINUMUM THE FOL�OWING INFORMATION FOR ALL ITEMS USED ON THE SYSTEM: MINOR ALTERATIONS AND CHANGES IN THE LAYOUT IN ORDER TO CONFORM TO THE GROUND CONDITIONS AND TO OBTAIN FULL AND ADEQUATE
<br /> TURF ROTATOR,4"(10.16 CM)POP-UP WITH FACTORY WSTALLED CHECK 18 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 43.18 49.09 3.76 0.60 in/h 1.)LIST OF AUTHORIZED DISTRIBUTORS AND SERVICE REPRESENTATIVES FOR EACH PIECE OF IRRIGATION EQUIPMENT,INCLUDING NAMES, COVERAGE OF WATER,WHICH IS THE CONTRACTOR'S RESPONSIBILITY.
<br /> VALVE,PRESSURE REGULATED TO 40 PSI(2.76 BAR),MP ROTATQR NOZZLE 19 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.46 58.15 20.47 1,41 in/h JOSHUA PENNIN TON BEARD
<br /> ON PRS40 BODY. K=6LACK AD1 ARC 90-210,G=GREEN AD1 ARC 210-270, 20 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 46.99 59.10 23.47 1.53 in/h ADDRESSES,AND PHONE NUMBERS. 5.)TRENCHING:
<br /> R=RED 360 ARC. 21 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 48.01 59.52 25.26 1.63 inJh 2.)GUARANTEE/WARRANTY CERTIFICATES. 1.)TRENCHES SHAL�BE EXCAVATED FOR ALL PIPE TQ PROVIDE A MINtMUM DEPTH OF COVER BELOW FINISH GRADE OF 15"FOR LIVE LINES(MAINS} CERTIFICATE N0. 938
<br /> - - 22 HUNTER PGV-151 ANGLE 1-1 2" SHRUB SPRAY 50.61 65.50 32,46 1.14 in/h 3.)tNSTRUCTION MANUALS.
<br /> � 4.J PARTS LISTS FOR EACH ITEM WI7H EXPLODED VIEWS OF EACH ITEM SHOWING PART NUMBERS AND 12"FOR LATERALS AND ALL OTHERS.ALLOW ENOUGH WIDTH FOR MINUMUM 3"BETWEEN PARALLEL PVC LINES. �
<br /> ♦ /♦ /� '! HUNTER MP3000 PROS-04-PRS40-CV 22 40 23 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 43.01 48.71 0.87 0.67 inJh 5. COMPLETE TROUBIE-SHOOTING GUIDE TO COMMON IRRIGATION PROBLEMS. 2.)EXGAYATE TO DEPTH REQUIRED IN ANY MATERIAL ENCOUNTERED WITH NO EXTRA COMPENSATION.MATERIALS UNSUITABLE FOR BEDDING OF PIPE �y
<br /> TURF ROTATOR,4"(10.16 CM)POP-UP WITH FACTORY INSTALLED CHECK 24 HUNTER PGV-151 ANGLE 1-1f2" SHRUB SPRAY 47.85 61.31 29.35 1.45 in/h � TO BE REMOVED TO DEPTH 4"BELOW TRENCH BOTTOM AND REPLACED WITH SUITABLE BEDDING MATERIAL SUITABLE MATERIAL INCLUDES Q Z •
<br /> 6.)WINTERIZATION AND SPRING START-UP PROCEDURES. PREVIOUSLY EXCAVATED SOIL THAT IS FREE FROM OBJECTS WHICH MAY DAMAGE THE PIPE SUCH AS ROCKS,ROOTS,DEBRIS,OR OTHER SHARP � � � y.
<br /> YALVE,PRESSURE REGULATED TO 40 PSI{2.76 BAR),MP ROTATOR NOZZLE 25 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 43.16 48.99 2.73 0.68 in/h 7.)BAGKFLOW PREVENTOR TEST CERTIFICATION. OBJECTS OVER 1"DIAMETER,OR PIPE BEDDING SAND. :? o � w
<br /> ON PRS40 BODY.B=BLUE ADJ ARC 90-210,Y=YELL.OW AD1 ARG 210-270, 26 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 45.33 52.39 8.24 1.01 in/h • �
<br /> A=GRAY 360 ARC. 27 HUNTER PGY-151 ANGLE 1-1/2" SHRUB ROTOR 50.84 59.89 15.00 0,54 inJh 3.J EXERCISE CARE WHEN EXCAVATWG TRENCHES NEAR EXISTING TREES. REPLACE ANY CONTRACTOR DAMAGED MATERIAL WITH OWNER APPROVED v', a h
<br /> 8.)COORDINATION WITH OTHERS: c.i
<br /> � � 28 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 49.70 74.28 35.30 1.09 in/h REPLACEMENT. � c � �
<br /> 1.)WATER SOURCE:COORDINATE WITH GENERAL CONTRACTOR. a o
<br /> ��♦ HUNTER MP3500 PROS-04-PRS40-CV 3 40 29 HUNTER PGY-151 ANGLE 1-1/2" SHRUB SPRAY 47.78 57.14 17.99 1.24 in/h 4.)tF TOPSOIL EXISTS ON-SITE,REPLAGE IT AS THE TOP LAYER OF BACKFILL. a z3i � N
<br /> 2.)SLEEVING:REFER TO SLEEVING SECTION
<br /> TURF ROTATOR,4.0"POP-UP WITH FACTORY INSTALLED CHEGK VALVE, 30 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 49.96 64.24 30.05 1.73 in/h 3.)OTHER TRADES:COORDINATE ALL WORK WITH THAT OF OTHER TRADES ^ L
<br /> P R E S S U R E R E G U L A T E D T O 4 0 P SI,MP R OTATOR NOZZLE ON PRS40 BODY. 31 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 45.67 56.47 24.79 1.64 in/h 4.)AVAItABLE WATER PRESSURE:VERIFY WATER PRESSURE AT POWT OF CONNECTIQN PRIOR TO SHOP DRAWING SUBMITfAL.SYSTEM DESIGN 6.)P I P I N G: N a � ,
<br /> L6=�IGHT BROWN ADJUSTABLE ARC,90-210. 32 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.68 55.86 18.32 1.75 in/h 1.)DRAIN VALVES:INSTALL AT POINT OF CONNECTION ONLY,WITH MIN.1/�CU.YD.DRAIN ROCK SUMP.INSTALL VALVES AS PER DETAIL.LOCATE w � ^
<br /> 33 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 49.65 64.36 33.96 1.78 in/h SHALL TAKE INTO ACCOUNT ALL PRESSURE LOSSES FROM POINT OF CONNECTION TO FARTHEST HEAD IN SYSTEM. SUMPS OUTSIDE QF PAVED AREAS.USE OFFSETS IF NECESSARY. SYSTEM WILL BE WINTERIZED BY COMPRESSED AIR BLOWOUT THROUGH QUICK ? � � C�
<br /> � HUNTER MP800SR PROS-04-PRS4�-CV 52 40 34 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 48.65 58.21 23.38 1.18 in/h COUPLER. ^ � ao Z
<br /> v 9.} PROTECTION: 2.)PIPE PLACEMENT:PLASTIC PIPE SHALL BE�NSTALLED AS RECOMMENDED BY THE MANUFACTURER. ? m "�
<br /> TURF ROTATOR,4.0"POP-UP WITH CHECK VALVE,PRESSURE REGULATED TO 35 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 43.09 48.95 4.30 0.90 in/h PRQTEGT WORK,ADJACENT PROPERTY,PUBLIC,AND BE RESPONSIBLE FOR ANY DAMAGE OR INJURY ARISING FROM THIS CONTRACT. REVIEW ALL UTILITY, m � Z
<br /> 40 PSI(2.76 BAR),MP ROTATOR NOZZLE ON PRS40 BODY.ADJ=ORANGE AND 36 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.30 58.20 18.94 2.06 in/h 3.)SIZE ALL PIPE FOR MAXIMUM 5'PER SECOND VElOCI7Y.
<br /> GRAY(ARC 90-210),360=LIME GREEN AND GRAY(ARC 360) 37 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.94 62.09 26.59 1.80 in h �RRIGATION,MECHANICAL,AND ELECTRICAL PLANS,SO THAT DIGGING/DRILLING OPERATIONS DO NOT DAMAGE LINES. REPLACE OR REPAIR AT Z
<br /> � CONTRAGTOR'S EXPENSE ANYTHING DAMAGEQ AS A RESULT OF CONTRACTOR'S OPERATIONS,IN A MANNER SATISFACTORY TO THE OWNERS,BEFORE FINAL 7��OINTING:
<br /> 38 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 50.68 65.42 34.98 1.15 in/h .�
<br /> PAYMENT IS MADE. 1.)SEAL ALl THREADED JOINTS(PVC OR GALV.)WITH TEFLON TAPE OR REGTORSEAL°HEAVY DUTY"#100 VIRGW TEFLON THREAD SEALING PASTE a,
<br /> � HUNTER MP CORNER PROS-04-PRS40-CV 40 40 39 HUNTER PGV-151 ANGLE 1-1/2° SHRUB SPRAY 44.27 50.91 11.48 1.18 in/h ONLY(NO SUBSTITUTES}. Z
<br /> TURF ROTATOR,4"(1Q.16CM)POP-UP WITH FACTORY INSTALLED CHECK 40 HUNTER PGV-151 ANGLE 1-1/2" TURF SPRAY 47.54 54.36 14.12 2.64 in/h 10.) GUARANTEE: 2.j USE TWO-STEP SOLVENT WELD PROCESS ONLY FOR SLIP FITfINGS,APPLY AND INSTALL AS PER MANUFACTURER'S RECOMMENDATIONS. (� �
<br /> VALVE,PRESSURE REGULATED TQ 40 PS)(2.76 BAft},MP ROTATOR NOZZLE. 41 HUNTER PGV-151 ANGLE 1-1/2" TURF RQTARY 47.12 54,69 15.09 0.58 inJh GUARANTEE THE SATISFACTORY OPERATION OF EQUIPMENT,MATERIA�S,AND WORKMANSHIP,INCLUDING THE RESTORATION OF THE AREA FOR A PERIOU -... �
<br /> T=TURQUdISE ADJ ARC 45-105 ON PRS40 BODY. 42 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 46.45 53.82 17.60 0.57 In/h OF ONE YEAR FROM THE DATE OF ITS ACCEPTANCE.REPAIR OR REPLACE ANY DEFECT IN EQUIPMENT OR WORKMANSHIP OCCURING WITHIN THAT YEAR 3.)CURE JOINTS AT LEAST 24 HOURS BEFORE PRESSURE IS APPLIED TO SYSTEM. t� �
<br /> 43 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.48 55.01 18.04 1.35 in/h 4.)NO MALE PVC ADAPTERS PERMITTED. USE FEMALE PVC ADAPTERS WITH GALVANIZED STEEL PIPE OR SCHEDULE 80 PVC NIPPLES(3"MIN. W
<br /> � L PROMPTLY,UPON NOTIFICATION,AT CONTRACTOR'S EXPENSE. [� Z
<br /> -- -- HUNTER MP STRIP PROS-04-PRS40-CV 37 40 44 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.82 59.49 29.66 2.52 in/h LENGTH).STREET"ELLS"PERMITTED ONLY FOR TRIPIE SWING JOINTS,RND ONLY"MARLEX"SCHED.40 HIGH-DENSITY POLYETHYLENE(NO _
<br /> SUBSTITUTES) �
<br /> TURF ROTATOR,4"(10.16 CM)POP-UP WITH FACTORY INSTALLED CHECK 45 HUNTER PGV-151 ANGLE 1-1/2° SHRUB SPRAY 47.76 63.61 35.73 2.82 inJh w
<br /> VALVE,PRESSURE REGULATED TO 40 PSI(2.76 BAR),MP ROTATOR NOZZLE 46 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 51.68 72.63 36.85 0.35 in/h PRODUCTS AND MATERIALS 8.)HEAD INSTALLATION: LL'
<br /> ON PRS40 BODY.LST=IVORY LEFT STRIP,SST=BROWN SIDE STRIP, 47 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 44.26 50.22 5.65 0.57 injh Z
<br /> RST=COPPER RIGHT STRIP. 48 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 46.71 63.40 35.51 2.44 in/h 1.)PROVIDE SUFFICIENT CLEARANCE FOR MATERIALS REQUIRING MAINTENANCE.INSTALL ALL MATERIALS AS PER MANUFACTURER'S SPECIFICATIONS. _
<br /> .. .. ..
<br /> 49 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 46.13 64.55 37.09 2.59 in/h 1.) MATERIALS AND SUBSTITUTIONS: 2.)SPRINKLER HEADS/QUICK COUPLER: (�
<br /> HUNTER MP - PARATE Y WHERE P SSIBL . LAWN AND VED.
<br /> 1000 PROS 06-PRS40-CV 81 40 50 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.98 59.18 28.57 2.10 in/h ALL MATERIALS TO BE INCORPORATED IN THIS SYSTEM SHALL BE NEW AND WITHOUT FLAWS OR DEFECTS AND OF QUALITY AND PERFORMANCE AS a.)VALVE EACH HEAD SE L 0 E SHRUB AREAS TO BE SEPARATELY VAI. Z
<br /> SHRUB ROTATOR,6°{15.24 CM POP-UP WITH CHECK VALVE PRESSURE " b.)SYSTEM SHALL BE DfSIGNED TO PROVIDE SEPARATE IRRtGATiON ZONES FOR AREAS BASED ON DIFFERENT CLIMATIC EXPOSURES AND PLANT � W
<br /> ) , 51 HUNTER PGV-151 ANGLE 1-1/2� TURF ROTARY 48.08 54.24 8.98 0.55 in/h SPECIFIED,AND MEETING THE REQUIREMENTS OF THE SYSTEM. MATERIAL TYPES. SOUTH ANd WEST EXPOSURES MAY BE GOMBINED,AND NORTH AND EAST EXPOSURES MAY BE COMBINED,PROVIDED THAT
<br /> REGULATED TO 40 PSI(2.76 BAR),MP ROTATOR NOZZLE. M=MAROON AD1 52 HUNTER PGV-151 ANGLE 1-1/2 TURF SPRAY 49.62 59.Q0 24.10 2.64 in/h
<br /> ARC 90 TO 210,L=LIGHT BLUE 210 TO 270 ARC,0=0LIVE 360 ARC ON PRS40 53 HUNTER PGU-151 ANGLE 1-1/2" SHRUB SPRAY 46.72 55.39 22.12 1.85 in/h THE HEAD TYPE IS THE SAME.CONFORM WITH APPLICABLE CODES AND REQUIREMENTS.
<br /> BODY. 54 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 51.04 60.55 24.80 0.38 in/h 1.)NO SUBSTITUTIONS OF SMALLER PIPE SIZES WILL BE PERMITTED BUT SUBSTITUTIONS OF LARGE SIZES OF SAME TYPE AT NO EXTRA COST WITH c.)USE ONLY HEADS WITH MATCHED PRECIPITATION RATES,AND ADJUST AS REQUIRED.
<br /> APPROVAL ARE ACCEPTABLE. d.)MAXIMUM SPACING FOR LAWN HEADS=50%OF THE DIAMETER OF THE HEAD.MAXIMUM SPACING FOR ALL OTHER HEADS 60%OF TME
<br /> ^ ^ ^ 55 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 49.77 62.53 32.48 0.37 in/h 2.)NO SUBSTITUTIONS WILL BE PERMITTED WHICH HAVE NOT BEEN SUBMITTED FOR PRIOR WRITfEN APPROVAL. DIAMETER.TIGHTER SPACINGS MAY BE REQUIRED TO CONFORM TO SPECIFIC SITE CONDITIONS. �
<br /> �,, �,,, �,, HUNTER MP2000 PROS06-PRS40-CV 19 40 56 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 46.00 55.75 23.36 2.50 in/h e.)RISERS FOR ALL SPRINKLER HEADS AND QUICK GOUPLER VALVES SHALL BE STANDARD TRIPLE-SWING 101NT TYPE OR FLEXIBLE NIPP�E AS
<br /> SHRUB ROTATOR,6"(1524 CM)POP-UP WITH FACTORY INSTALLED CHECK 57 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 44.77 55.95 26.19 1.53 in/h 2.) METER: '
<br /> VAIVE,PRESSURE REGULATED TO 40 PSI(2.76 BAR),MP ROTATOR NOZZL.E. 58 HUNTER PGV-151 ANGLE 1-1/2" TURF ROTARY 46.49 54.33 16.18 0.38 in/h PER LOCAL CODE,ALL METERS WI�L BE PERMITfED IN PLACE,BY OWNER. DETAILED;MADE WiTH SCHEDULE 80 PVC THREADED FITTINGS.
<br /> K=BLACK ADJ ARC 90-210,G=GREEN ADJ ARC 210-270,R=RED 360 ARC ON 59 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 47.55 63.37 36.43 3.01 in/h f.)SET ALL SPRINKLER HEADS AND QUICK COUPLING VALVES PERPENDICULAR AND FLUSH TO FINISHED GRADE.HEADS TO BE BETWEEN 4"AND
<br /> PRS40 BODY. S1 HUNTER PGV-151 ANGLE 1-1 2 SHRUB ROTARY 49.79 69.79 18.92 0.51 in/h 6"BACK FROM PAVEMENTAND BEDLINES. �
<br /> STREET � � 3.)PVC PIPE AND FITTINGS:
<br /> � � �+ S2 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 49.60 75,07 21.56 0.54 in/h
<br /> t Jt Jt'J HUNTER MP3Q00 PROS-06-PRS40-CV 4 40 S3 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 51.35 58.21 14.74 0.51 in/h 1.)PVC PIPE AND FITTINGS SHALL BE PVC COMPOUND TYPE 1,GRADE 1,OR TYPE 1,GRADE 2,CONFORMING TO ASTM 1784. ALL FITTINGS SHALL 8E gJ SPRAY PATTERN SHALL NOT OVERTHROUW ONTO STRUCTURES,GLASS, PARKING LOTS,WALKWAYS,OR ROADS IN PUBLI RI HT- - . �
<br /> SCHEDULE 40 UNLESS OTHERWISE NOTED. n.)LOCATE MEADS TO AVOID POSSIBLE DAMAGE BY CARS.(AVOID MEADS ALONG CURBS WHERE THERE IS HEAD-IN PARKING.) �/�
<br /> SHRUB ROTATOR,6"(15.24 CM}POP-UP WITH FACTORY INSTALLED CHECK S4 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 51.24 58.43 14.30 0.52 in/h 2.)PVC SO�VENT WELD PIPE: PVC 1120 AND 1220 MATERIAL,200 PSI MINIMUM PRESSURE RATING WITH SDR 21 WAL�S WHIGH CONFORM TO �
<br /> 9.)VALVE INSTALLATION: W` � �
<br /> VALVE,PRESSURE REGULATED TO 40 PSI(276 BAR),MP ROTATOR NQZZLE. S5 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 51.72 60.52 17.60 0.53 in/h ASTM D 2241. ENCLOSE VALVES IN VALVE BOXES EXCEPT DRAIN VALVES WHICH ARE TQ BE ENCLOSED IN PROTECTIVE SLEEVES WITH IOCKING CAPS. VALVE BOX ^ �
<br /> 6=6LUE ADJ ARC 90-210,Y=YELLOW ADJ ARC 210-270,A=GRAY 360 ARC ON S6 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 51.60 59.66 17.60 0.39 in/h 3.)PVC THREADED PIPE: PVC 1120 OR PVC 1220,SCHEDULE 80,CQNFORMING TO ASTM D 1785. EXTENSIONS MRY BE REQUIRED.INSTALL AS PER DETAIL �
<br /> PRS40 BODY. S7 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 51.28 65.19 15.40 0.39 in/h O �
<br /> 4.)PLASTIC PIPE FITTINGS:CONFORM TO ASTM D 2466,TYPE 1,GRADES 10R 2.MOLDED FITTINGS MANUFACTURED OF THE SAME MATERIAL AS THE r ` �
<br /> S8 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTARY 51.68 68,83 17.60 0.52 inJh PIPE,SUITABLE FOR SOLVENT WEID,UNLESS OTHERWISE SPECIFIED. PLASTIC SADDLE AND FLANGE FITTINGS NOT PERMITTED. � y �
<br /> (;,)
<br /> HUNTER MP800SR PROS-06-PRS40-CV 47 40 T1 HUNTER PGV-S51 ANGLE 1-1/2" SHRUB SPRAY 47.29 60.69 28.23 1.72 in/h 5.)SOLVENT WE�D COMPOUND: TWO STEP APPLICATION,WITH PRIMER AND SOLVENT COMPOUNDS. 10.)FLUSHING:
<br /> ADJ. 360 TEMP. 1.)MAINS:TWO FULL-OPEN FLUSHINGS;ONE PRIOR TO PLACEMENT OF VALVES,THE SECOND AFfER PLACEMENT OF VALVES AND PRIOR TO TESTING. W �
<br /> SHRUB ROTATOR,6.0"POP-UP WITH CHECK VALVE,PRESSURE REGULATED TO T2 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 48.77 56.34 15.�0 1.60 in/h 4.)IRRIGATION HEADS: 2.)IATERALS:ONE FULLY-OPEN FLUSHING PRIOR TO PLACEMENT OF SPRINKLER HEADS AND/OR DRAIN VALVES. � � � �
<br /> 40 PSI(2.76 BAR),MP ROTATOR NOZZLE ON PRS40 BODY.OR=ORANGE ADJ T3 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 5266 72.77 37.50 0.42 in/h 1a)SMAIL LAWN AREAS:HEAVY-DUTY PLASTIC POP-UP HEADS,MINIMUM 4"POP-UP HEIGHT, INTEGRAL FILTER,REMOVABLE BODY CAP,MATCHED t . , � OO
<br /> ARC 90 TO 210. T4 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 53.38 69.85 29.00 0.39 inJh PRECIPiTATION RATES. (SEE SCHEDULE OR APPROVED EQUAL) 11.)BACKFILL: W � �
<br /> T5 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 44.35 50.45 7.35 1.38 in/h
<br /> � HUNTER MP CORNER PROS-06-PRS40-CV 5 40 T6 HUNT�R PGV-151 ANGLE 1-1/2" SNRUB ROTOR 55.18 73.91 37.50 0.46 in/h 1b.)LARGE LAWN AREAS: HEAVY-DUTY PLASTIC POP-UP HEADS,MIMMUM 3-3/4"TO 4"POP-UP HEIGHT,INTEGRAL FILTER,MATCHED PRECIPITATION 1.)COMPLETE BACKFILL ONLY AFTER COMPLETION OF PRELIMINARY INSPECTION OF SYSTEM.SEE PARAGRAPH 14.(WITH THE REVIEW AND V �
<br /> SHRUB ROTATOR,6"(15.24 CM)POP-UP WITH FACTORY INSTALLED CHECK T7 HUNTER PGV-151 ANGLE 1-1/2" SHRUB SPRAY 48.43 60.94 28.03 1.65 in/h RATES. (SEE SCHEDULE OR APPROVED EQUAL) APPROVAL OF THE OWNER'S PROJECT MANAGER,THE PIPE MAY BE PARTIALLY BACKFILLED AS IT IS LAID,BUT LEAVE ALL JOINTS EXPOSED FOR � � � � � �
<br /> VALVE,PRESSURE REGULATED TO 40 PSI(2.76 BAR),MP ROTATOR NOZZLE. TS HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 52.97 66.62 30.00 0.56 injh 2.)SHRUB/GROUNDCOVER AREAS: HEAVY DUTY 6°PLASTIC POP-UP HEADS,INTEGRAL FILTER,ADJUSTABLE RADIUS,NO STREAM SPRAY PATTERNS. FLUSHING,TESTING,INSPECTION,APPROVAL,AND AS-BUILT LOCATION). O
<br /> T=TURQUOISE AD1 ARG 45-105 ON PRS40 BODY. T9 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 52.28 73.15 35.00 0.84 in/h FULLY ADJUSTABLE F�OW,MATCHED PRECIPITATION RATES.(SEE SCHEDULE OR APPROVED EQUAL) 2.)ALL ROOTS,ROCKS,AND SURPLUS EXCAVATION SHALL BE REMOVED FROM THE SITE. Q O � � �
<br /> T10 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 52.35 73.23 35.00 0.53 in/h 3.)SHRUB/GROUNDCOVER STRIPS: HEAVY DUTY 6"PLASTIC POP-UP HEADS,tNTEGRAL FILTER,REMOVABLE BODY CAP.PRECIPITAl'ION RATES 3.)TRENCHES OR TUNNELS UNDER ROADS OR PAVED AREAS SHALL BE BACKFILLED AND TAMPED WITH A MECHANICAL TAMPER IN SUCCESSIVE 6" W � � � _
<br /> � � HUNTER MP STRIP PROS-06-PRS40-GV 363 40 T11 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 56.63 76.39 33.00 1.38 in/h MATGHED TO SHRUB HEADS. (SEE SCHEDULE OR APPROVED EQUAL) uFTS.
<br /> SHRUB ROTATOR,6"(15.24 CM)POP-UP WITH FACTORY INSTALLED CHECK T12 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 51.31 67.03 28.00 0.52 inJh 4.)NARROW AREAS:FLOOD OR UMBRELLA BUBBLER,FULLY ADJUSTABLE FLOW,BRASS OR PLASTIC AS APPROVED ON FIXED 2°GALV.RISER OR 4" �' ` � � �
<br /> V
<br /> VALVE,PRESSURE REGULATED TO 40 PSI(2.76 BAR),MP ROTATOR NOZZLE. T13 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTQR 50.77 70.26 35.00 0.63 in/h POP-UP. 12.)CONTROLLER: 'A � �
<br /> LST=IVORY LEFf S7RIP,SST=BROWN SIDE STRIP,RST=COPPER RIGHT STRIP T14 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 52.59 68.25 30.00 0.67 in/h 5.)WSFALL HEADS WITH'CHECK-O-MATIC'OR'SAM'FEATURES WHERE POTENTIAL FOR LQW FLOW DRAINAGE. LOCATE AS DIREC7ED BY OWNER.COORIDINATE INSTAILATION OF SEPARATE 120V A.C.15 AMP CIRCUIT.CONDUIT ALL WIRE AT CONTROLLER AS PER N.E.G. ��� Z �
<br /> ON PRS40 BODY. T15 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 50.78 65.86 30.00 0.48 in/h AND OWNER dIRECTiON.GROUND CONTRO�LER AS REQUIRED. � W � W
<br /> T16 HUNTER PGV-15 1 A N G L E 1-1/2° SHRUB ROTOR 51.1 1 63.26 2 5.0 0 0.5 5 i n/h 5.)BACKFLOW PREVENTION DEVICE: O \ O � �
<br /> T17 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 50.02 64.71 31.00 0.87 in/h SEE SCHEDULE FOR SPECIFICATIONS.LOCATE AT POINT OF CONNECTION AS PER DETAIL AND IN ACCORDANCE WITH MANUFACTURER'S 13.)CLEAN UP: w
<br /> SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI GPM T18 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 51.80 66.79 33.00 0.90 in/h RECOMMENDATION. KEEP THE PREMISED FREE FORM RUBBISH AND DEBRIS AT ALL TIMES,AND ARRANGE MATERIALS SO AS NOT TO INTERFERE WITH OTHER OPERATIONS AT i� � � �
<br /> T19 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 52.71 61.51 20.50 0.63 in/h
<br /> THE JOB SITE.REMOVE ALL UNUSED MATERIAL,RUBBISH,AND QEBRIS FROM THE SITE. ^ � �
<br /> S HUNTER I-20-00 55 45 1.50 T20 HUNTER PGV-151 ANGLE 1-1/2" SHRUB ROTOR 53.77 69.47 34.50 1.29 in/h 6J VALVES: �
<br /> SHRUB ROTOR,FIXED RISER.ADJUSTABLE AND FULL CIRCLE.PLASTIC RISER. 1.)SHUT-OFF VAIVE:BRONZE,NON-RISING STEM TYPE,MANUAL OR ANGLE VAIVE,MINUMUM 200 PSI PRESSURE RATfNG. (RED-WHITE OR CHAMRION 14.)INSPECTIONS AND TESTlNG: �1� � �
<br /> DRAW CHECK VALVE.STANDARD NOZZLE. 100 SER(ES) 1.)IF ANY PART OF THE SPRINKLER SYSTEM IS BACKFILLED BEFORE LOCATION,TESTING,OR INSPECTION,IT MUST BE COMPLETELY UNCOVERED AND � ��� �
<br /> 2,)QUICK COUPLER VALVES:BRASS,ONE OR TWO PIECE WITH SPRING-LOADED GOVER.(SEE SCHEDULE OR APPROVED EQUAL}. EXPOSED UNTIL APPROVED FOR BACKFILLING BY THE OWNER. � � �
<br /> S HUNTER 1-20-00 27 45 2.00 3.)PRESSURE REGULATING VALVE:BRONZE,COMMERCIAL GRADE,WITH SPRING RANGE OF 25-75 PSI(WATfS OR WILKINS OR APPROVED). 2.)THE OWNER RESERVES THE RIGHT TO DIRECT THE REMOVAL AND REPLACEMENT OF ANY ITEMS WHICH,IN HIS OPINION,DO NOT PRESENT AN '
<br /> SHRUB ROTOR,FIXED RISER.ADJUSTABLE AND FULL CIRCLE.PLASTIC RISER. ^ 4.)MANUA�DRAIN VA�VES:BRASS,'/<"SIZE,COMMERCIAL QUALITY,NON-RISING STEM TYPE,(SEE SCHEDULE OR APPROVED EQUAL). ORDERLY,REASONABLY NEAT,OR WORKMANLIKE APPEARANCE,PROVIDED SUCH ITEMS CAN BE PROPERIY INSTAL�ED IN SUCH ORDERLY WAY BY � �
<br /> DRAIN CHECK VALVE.STANDARD NOZZLE. VRIT/CAL ANAL YS/S 5.)CONTROL VALVES:PLASTIC OR BRASS WITH FLOW GONTROL(SEE SCHEDULE OR APPROVED EQUAL}CR.MINIMUM MANUFACTURER'S WARRANTY THE USUAL METHODS IN SUCH WORK. SUCH REMOVAI.AND REPLACEMENT SHALL BE DONE,WHEN DIRECTED IN WRITING,AT THE CONTRACTORS � W �
<br /> OF 5 YEARS. EXPENSE WITHOUT ADDITIONAL COST TO THE OWNER. \
<br /> - HUNTER I-20-00 17 45 2.50 p,O.C.NUMBER:01 P.O.C.NUMBER:03 3.)PRELIMINARY INSPECTION/PRESSURE TESTING: '�+
<br /> P.O.C.NUMBER:02 7.)VALVE BOXES AND PROTECTNE SLEEVES: �
<br /> SHRUB ROTOR,FIXED RISER.ADJUSTABLE AND FULL GIRCLE.PLASTIC RISER. a.)PRIOR TO REQUEST FOR PRELIMINARY INSPECTION,ACCOMPLISH THE FOLLOWiNG:
<br /> DRAIN CHECK VALVE.STANDARD NOZZLE. Water Source information: Water Source Information: Water Source Information: 1.}GENERAL ENCLOSE ALL VALVES IN VALVES BOXES;PROVIDE EXTENSIONS TO FINISH GRADE AS REQUIRED.
<br /> -ALL PIPE AND VALVES AND ALL OTHER EQUIPMENT EXCEPT SPRINKLER HEADS IN PLACE.
<br /> FLOW AVAILABLE FLOW AVAILABLE 2.)VALVE BOXES: -CAP A�L RISERS EXCEPT FIRST RISER FROM VALVE ON EACH LATERAL(ONE UNCAPPED RISER PER LATERAL),TYPICAL.
<br /> - HUNTER 1-20-00 5 45 3.00 FLOW AVAILABLE a.)CONTROL VALVE ONLY OR PRESSURE-REDUCING VALVE ONLY.(SEE SCHEDULE OR APPROVED EQUAL),WITH EVERGREEN COVER#10-181-015 -PURGE ALL AIR FROM MAIN LINES.
<br /> SHRUB ROTOR,FIXED RISER.ADJUSTABLE AND FULL CIRCLE.PLASTIC RISER. Water Meter Size: 1" Water Meter Size: 1" Water Meter Size: 1° TWIST LOCK,OR APPROVED.
<br /> Flow Available: 37.50 gpm Flow Available: 37.50 gpm Flow Available: 37.50 gpm b.)SHUT-OFF VALVE AND STRAINER;DOUBLE-CHECK VALVE ASSEMBLY:(SEE SCHEDULE OR APPROVED EQUAL),ALL WITH EVERGREEN COVER# b.)TEST OF MAINS AND VALVES:WITH ALL VALVES IN PIACE AND CLOSED,TEST AT 150 PSI MINIMUM FOR 30 MINUTES WITHOUT
<br /> DRAfN CHECK VALVE.STANDARD NOZZLE. INTRODUCTION OF ADDITIONAL SERVICE OR PUMPING PRESSURE.TESTING SHALL BE DONE WITH ONE PRESSURE GAUGE INSTALLED ON
<br /> PRESSURE AVAILABLE PRESSURE AVAILABLE 10-192-101 WITM PLASTIC LQCKING DEVICE. THE LINE WHERE DIRECTED BY OWNER.LINES WHICN SHOW LOSS OF PRESSURE EXCEEDING 5 PSI ATTHE END OF SPECIFIED TEST
<br /> - PRESSURE AVAILABLE
<br /> HUNTER I-20-00 11 45 4.00 Static Pressure at POC: 80.00 psi Static Pressure at POC: 80,00 psi PERIODS SHAIL BE REJECTED.THE CONTRACTOR SHAII CORRECT INSTALLATIONS REJECTED,AND RETEST.
<br /> SHRUB ROTOR,F1XED RISER.ADJUSTABLE AND FULL CiRCLE.PWSTIG RISER. Static Pressure at POC: 80.00 psi 8.) PROTECTIVE SLEEVE WITH LOCKING CAPS:
<br /> Elevation Change: 5.00 ft Elevation Change: 5.00 ft Elevation Ghange: 5.QQ ft c.)TEST OF LATERALS:PURGE ALL AIR FROM LATERALS AND CAP ALL RISERS.OPEN VALVES AND BRING SYSTEM TO LINE PRESSURE.
<br /> DRAIN CHECK VALVE.STANDARD NOZZLE. „ 2"DIAMETER CIASS 160 PVC,LENGTH AS REQUIRED.CAPS:(SEE SCHEDULE OR APPROVED EQUA�). ALL DRAIN VALVES AND MANUAL CONTROL VALVES TO LATERAL LINES WILL BE INSPECTED VISUALLY.LINES WHICH EVIDENCE VISUAL LEAKAGE SHALL BE RE)ECTED.
<br /> Service Line Size: 8 Service Line Size: $° Service Line Size: $" BE ENCLOSED IN PROTECTIVE SLEEVES/LOCKING CAPS.
<br /> - ' Length of Service Line: 20.00 ft Length of Service Line: 20A0 ft Length of Service Line: 20.00 ft d.)REJECTED SYSTEMS:CORRECT REJECTED SYSTEMS OR PORTIONS OF SYSTEMS REQUIRWG REPAIR,AND RETEST.
<br /> HUNTER i-20-00 55 45 5.00 pressure Available: 78.00 si Pressure Availabie: 78.00 psi 4.)FINAL INSPECTION/OPERATION AND COVERAGE CHECK: •
<br /> SHRUB ROTOR,FIXED RISER.ADJUSTABLE AND FULL CIRCLE.PI.ASTIC RISER. p Pressure Available: 78.00 psi 9.) VALVE KEYS AND VA�VE 80X COVER KEYS:
<br /> DRAfN CHECK VALVE.STANDARD NOZZLE. PROVIDE TWO COMPLETE SETS OF ALL KEYS REQUIRED FOR VALVES,VALVE BOX COVERS,AND PROTECTIVE S�EEVE CAP COVERS. a.)PR�OR TO REQRIEST,COMPLETE ALL WORK,INCLUDING BALANCING,ADJUSTING THE SYSTEM(PRESSURE-REDUGING VALVES,FLOW
<br /> DESIGN ANALYSIS DESiGN ANALYSIS DESIGN ANALYSIS ADJUSTMENT KEYS,NOZZLES,ETC.)TO PROVIDE OPTIMUM COVERAGE WITHOUT FOGGING. �i
<br /> - Maximum Station Flow: 37.50 gpm Maximum Station Flow: 24.66 gpm Maximum Station Flow: 37.50 gpm 10. DRAIN ROCK: b.)COVERAGE CHECK:OPERATE EACH ZONE OF THE SYSTEM FOR THE OWNER'S INSPEGTION AND APPROVAL.MAKE MINOR �
<br /> HUNTER 1-20-00 1 45 6.00 Flow Available at PQC: 37.50 gpm Flow Available at POC: 37.50�pm � o o , „ ADJUSTMENTS AND CORRECTIONS REQUESTED TO IMPROVE COVERAGE AT NO ADDITIONAL CHARGE TO THE OWNER.
<br /> SHRUB ROTOR,FIXED RISER.ADJUSTABLE AND FULL CIRCLE.PLASTIC RISER. Flow Available at POC: 37.50 gpm UNFRACTURED ROCK,100%PASSING 1-1/2"SQUARE SIEVE AND 0%PASSING /< SQUARE SIEVE. cp � �
<br /> Residual Flow Available: Q.00 gpm Residual Flow Available: 12.84 gpm Residual Flow Available: 0.00 gpm � CJ w
<br /> DRAIN CHECK VALVE.STANDARD NOZZLE. 15.)SYSTEM OPERATION ORIENTATION: � O Q
<br /> Critical Station: T11 Critical Station: 28 11.)AUTOMATIC CONTROLLER(IF OUTDOOR LOCATION): AT FINAL INSPECTION OR OTHER OWNER-APPROVED TIME,CONDUCT A TRAINING AND ORIENTATION SESSION FOR THE OWNER COVERING THE �
<br /> Critical Station: 4 RAINBIRD,HUNTER,OR TORO COMMERCIAL GRADE,Ui APPROVED,(SE�SCHEDULE OR APPROVED EQUAI.)I.00KING META�CABINET WITH MINiMUM � m Q
<br /> Design Pressure: 45.OQ psi Design Pressure: 40.00 psi Design Pressure: 40.00 psi OPERATION,ADJUSTMENT,AND MAlNTENANCE OF THE IRRIGATION SYSTEM.SUBMIT ALL KEYS,THE AS-BUILT DRAWINGS,AND OPERATION MANUAL
<br /> SYMBOL MANUFACTURER/MODEL/DESGRIPTION � Elevation Loss: 0.00 si Elevation Loss: 0.00 si FEATURES: FOR APPROVAL. � _ �
<br /> � P Elevation Loss: 0.00 psi P 0. �
<br /> Friction Loss: 7.84 psi Friction Loss: 2.63 psi Friction Loss: 6.09 psi � � �
<br /> HUNTER PGV-151 ANGLE $7 -DUAL PROGRAMMING 16.j WINTERIZATION: ~ � � m Z C)
<br /> Fittings Loss: 0.78 psi Fittings Loss: 0.26 psi Fittings Loss: 0.61 psi -WATER BUDGETING v � W � W
<br /> 1-1/2"PLASTIC ELECTRIC REMOTE CONTROL VALVE,FOR RESIDENTIAL/LIGHT PROVIDE,AS PART OF THlS CONTRACT,ONE WINTERIZATION OF THE SYSTEM IN THE MID FALL.WINTERIZE THE SYSTEM WITH COMPRESSED AIR IN � � Lj � �
<br /> COMMERCIAL USE. FEMALE NPT INLET/OUTLET,WITH FLOW CONTROL Loss through Valve: 3A0 psi Loss through Valve: 3.00 psi Loss through Valve: 3.00 psi -MASTER VALVE SHORT CYCLES AT NO MORE THAN 40 PSI AIR PRESSURE.DO NQT ALLOW PIPE CLOSE TO THE GOMPRESSOR TO GET HOT TO THE TOUCH. O
<br /> ANGLE CONFIGURATION. Pressure Req.at Critical Station: 56.63 psi Pressure Req.at Critical Station: 45.90 psi Pressure Req.at Critical Station: 49.71 psi -RAIN SHUT-OFF � �
<br /> Loss for Fittings: 0.63 psi Lass for Fittings: 1.94 psi Loss for Fittings: 0.96 psi -TEST CYCLE � �
<br /> Loss for Main Line: 6.30 psi Loss for Main Line: 19.36 psi Loss for Main Line: 9.60 psi �
<br /> "' ZURN 950XL 1" 3 -ENOUGH ZONES FOR SYSTEM DESIGN,PLUS FOUR EXTRA. �
<br /> Loss for POC to Valve Elevation: 0.00 psi Loss for POC to Valve Elevation: Q.00 si Loss for POC to Valve Elevation: 0.00 psi o W
<br /> DOUBIE CHECK VALVE ASSEMBLY Loss for Backflow: 6.30 psi Loss for Backfiow: 5.73 psi Loss for Backfiow: 6.53 psi �' � �
<br /> Loss for Water Meter: 6.53 si Loss for Water Meter: 7.48 si TEMPORARY/RRIGA T/ON NOTES >
<br /> CP HUNTER ACC-99D-PED-SS 1 p Loss for Water Meter: 3.60 psi p W � � �
<br /> 2-WIRE DEGODER CONTROLLER WITH 99 STATION CAPACITY,METAL CABINET, Critical Station Pressure at POC: 76.39 psi Critieal Station Pressure at POC: 76.53 psi Critical Station Pressure at POC: 74.28 psi � � ¢ �
<br /> Pressure Available: 78.00 psi Pressure Availabie: 78.00 psi Pressure Available: 7$.00 psi
<br /> STAWL.ESS STEEL PEDESTAL Residual Pressure Available: 1.61 si Residual Pressure Availabie: 3.72 si MITIGATION AREAS AND EROSION CONTROL AREAS TO BE IRRIGATED BY A TEMPORARY IRRIGA?ION,AND TO BE MAiNTAINED FOR 2 YEARS TO ENSURE � � � Q
<br /> P Residual Pressure Availabie: 1.47 psi p ESTABLISHMENT OF VEGETATION.
<br /> CS HUNTER ACG1200-PED-SS 1 S H E E T O F
<br /> 12 STATION OUTDOOR MODULAR CONTROLIER.NO MODULE REQUIRED.
<br /> HtGH-END COMMERCIAL USE.STAINLESS STEEL PEDESTAL L�.�V Z�J
<br /> PROJECT NUMBER
<br /> .�2156E
<br />
|