Laserfiche WebLink
r✓ ` <br /> s <br /> Swenson Say Faget <br /> STRUCTURAL ENGINEERING <br /> 2124 Third Ave,Suite 100 <br /> Seattle,WA 98121 <br /> O 206.443.6212 <br /> 934 Broadway,Suite 100 <br /> Tacoma,WA 98402 <br /> O 253.284.9470 <br /> ssfengineers.com <br /> Memorandum <br /> To: Derek Morgan Date: November 22,2016 <br /> 4320 S 131"Place,Suite 100 From: Karl Rosman <br /> Seattle,-WA'9M68 <br /> Project 2 West Casino <br /> 1 The Bluffs @ Evergreen7- <br /> Project <br /> g E ii/V1 i T <br /> Project#.• 10408-2016-01 _ <br /> Derek, <br /> Based on our conversation and site visit the gable end roof truss that was placed east of gridline E may be reinforced as <br /> shown on the attached partial roof framing plan and associated detail A. <br /> Please advise if you have any questions or concerns. <br /> Sincerely, <br /> �F yeti <br /> Karl Rosman PE <br /> N ' <br /> OCj22q <br /> SS,ONA L 5�' <br />