My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10117 EVERGREEN WAY Geotech Report 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
10117
>
Geotech Report
>
10117 EVERGREEN WAY Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:12:16 PM
Creation date
2/21/2020 9:11:32 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10117
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ��yF�R� DAVID L. NELSON AND ASSOCIATES, INC. <br /> ,. r' <br /> �t ,` Consulting Engineering Geology <br /> • '"�.�'j . ��, . <br /> -�"r�£'` 'i <br /> w�:.;,.X. � <br /> ....�..�..�..�.�.� <br /> �_,...��— 13424 Chain Lakc Road Monroc, Washington 98272 206/794-4332 <br /> _._..._._.. <br /> September 28 , 1984 • � <br /> Project No. 7884 � <br /> Terra Realty <br /> c/o Douglas Mulvanny Architects <br /> 12200 Northup Way <br /> Bellevue , Washington 98005. <br /> Reference : Soils Investigation <br /> South Pointe Pl�iza <br /> Everett , Wa�hington <br /> Gentlemen; <br /> This is to serve as a report of a soils investigation performed I <br /> at the above re�erenced project site , ,per your request. �� <br /> Introduction <br /> The purpose of this investigation is to determine suitability <br /> of the sii;e for development of the area as a shopping center. <br /> Construction is to consist of a large three store complex• <br /> within the nor�thern portion of the site , two retail buildings i <br /> and a three story retail/office building within the southern <br /> portion of the site . The balance of the site area is to consist ' <br /> of parking and access driveways . <br /> The scope of services included performance of ten Uorings within <br /> the proposed building areas and seventeen backhoe test pits I <br /> within the.. general .parking areas . Locations of the borings and I <br /> test pits can be seen on the enclosed location map. These <br /> locations are approximate for the backhoe test pits; however, <br /> the borings were located in the field by Mr. Charlie Gliege of I <br /> Northland Construction. <br /> � <br /> ,;��: <br /> �.: . <br /> �W'` <br /> • �i <br /> ' <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.