Laserfiche WebLink
9/11/2020 City of Everett Page 1 <br /> 9.01:42AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1801-103 Site Address 1610 W MARINE VIEW DR <br /> Applied 1/16/2018 Applicant Lot <br /> Approved 1/16/2018 Owner EVERETT PORT OF Block <br /> Issued 1/16/2018 Contractor ELECTRIC WEST INC Tract <br /> Parent Permit No, Description NEW SERVICEBRANCH CIRCUITS TO SUPPLY PED BRIDGE <br /> Notes AND LIGHTING <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 2/1/2018 2/1/2018 BLDG 04-UFER MCB APPROVAL <br /> GROUND <br /> 4/3/2018 4/4/2018 ELEC MCB APPROVAL OK elevator light <br /> 02-SLAB/CONDUI slab work <br /> 7/11/2018 7/11/2018 ELEC MCB APPROVAL OK conduits in bridge <br /> 02-SLAB/CONDUI <br /> 7/11/2018 7/11/2018 ELEC MCB APPROVAL OK <br /> 02-SLAB/CONDUI <br /> 8/8/2018 8/8/2018 ELEC 01-GROUND MCB APPROVAL OK conduits to vault <br /> WORK <br /> 11/1/2018 11/1/2018 ELEC 05-SERVICE MCB APPROVAL <br /> 12/17/2018 12/17/2018 ELEC 08-OTHER MCB APPROVAL (12/17/2018 3:01 PM MCB) <br /> OK elevator controller. <br /> 6/5/2019 6/5/2019 PERMIT CRB APPROVAL <br /> EXTENSION <br /> 2/11/2020 2/11/2020 ELEC 06-ROUGH MCB NOT READY <br /> IN <br /> 4/9/2020 4/9/2020 ELEC MCB APPROVAL eTRAKiT Inspection 4/8/2020 3:37 PM ELECTRIC WEST INC <br /> 03-SLAB/CONDUI Request Please contact Andy prior to inspection <br /> Contact Name:Andy Graves <br /> Site Address: 1610 W MARINE VIEW DR <br /> Phone:3606310386 <br /> e-Mail:bruno@electric-west.corn <br /> (4/9/2020 2:12 PM MCB) <br /> Ok communication conduits and vaults <br /> west. <br /> 8/21/2020 8/21/2020 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 8/19/2020 2:38 PM ELECTRIC WEST INC <br /> Request We are still missing some light fixtures but <br /> hoping we can get a"partial"final as they <br /> are hoping get the elevator inspected. <br /> Contact Name:ELECTRIC WEST INC <br /> Site Address: 1610 W MARINE VIEW DR <br /> Phone:3604199378 <br /> e-Mail:bruno@electric-west.com <br /> (8/21/2020 12:24 PM SKB) <br /> Connect all grounding electrode systems <br /> present at the bridge building to the service. <br /> Install an exit pathway light in the electrical <br /> room.Install breaker lock off for code and <br /> finish elevator room wiring. <br /> INSP12 CRWSYSTEMS <br />