My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3125 OAKES AVE 2020-02-24
>
Address Records
>
OAKES AVE
>
3125
>
3125 OAKES AVE 2020-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2020 10:55:23 AM
Creation date
2/24/2020 10:55:01 AM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
3125
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/3/2020 Page 1 <br /> City of Everett <br /> 12:34:18PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1911-002 Site Address 3125 OAKES AVE BLDG B <br /> Applied 11/7/2019 Applicant Lot <br /> Approved 11/7/2019 Owner HOUSING HOPE Block <br /> Issued 11/7/2019 Contractor ALLIED CONSTRUCTION ASSOC INC Tract <br /> Parent Permit No. B1807-025 Description REMOVE&REPL BATHROOM FIXTURES AND MECH ITEMS <br /> Notes BLDG ENVELOPE COMPLIANCE LETTER REQ'D PRIOR TO FINAL(PER RCW 64.55) <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 11/8/2019 11/8/2019 PLUMB SDP OTHER consultation see (11/8/2019 12:24 PM SDP) <br /> 03-ROUGH IN notes The scope of work is to remove the <br /> bathroom fixtures,replace the floors,tubs, <br /> toilets,lays.They are not moving any <br /> plumbing in the walls except the shower <br /> valve. It is ok to do this work without a <br /> rough in inspection provided at final,the <br /> tubs are filled with water up to the overflow <br /> to test for leaks. <br /> 11/8/2019 11/8/2019 MECH 04-ROUGH SDP OTHER consultation see (11/8/2019 12:23 PM SDP) <br /> IN notes The bathroom exhaust fans will require an <br /> upgrade of the fire protection.If you choose <br /> to box around the exhaust fan,please call <br /> for an inspection before you cover.If you <br /> are going to use a radiation damper,the <br /> exhaust fan can be looked at on the final <br /> inspection,please have the cover off so the <br /> inspector can see the damper in place. A <br /> construction tip sheet is scanned into the <br /> attachments. <br /> 12/26/2019 12/26/2019 PLUMB SDP APPROVAL shower valve 425-740-4843 <br /> 03-ROUGH IN <br /> 12/26/2019 12/26/2019 MECH 06-FINAL SDP PARTIAL APPR exhaust fan w/ 425-740-4843 <br /> damper <br /> 1/31/2020 1/31/2020 PLUMB 06-FINAL SDP APPRVD-PERN <br /> 1/31/2020 1/31/2020 MECH 06-FINAL SDP APPRVD-PERN Ryan,Allied Construction360-661-1458 <br /> 1/31/2020 1/31/2020 ADMIN USE HPC APPROVAL <br /> ONLY** <br /> INSP12 CE11016 VS TEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.