Laserfiche WebLink
INSPECTION REPORT <br /> _ Date //GZII g Permit: elm,- ?jo <br /> it <br /> .- Contractor: l/l//fft <br /> i✓b i <br /> Owner: PaC/77L 41e/f171-7 <br /> Site Address: /2(22 5 gg ' /4 US <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ■Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In s❑vRO'Ggh In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid eiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final <br /> Fiinall�� ❑GasrdPipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: .l� — 42.-s-2s e›.DCf <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> El OK FOR T.C.O. . ..69'FFECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> L-13 <br /> Inspector: � ate: / i 3 6 <br /> EIR(10/06) DATABAR,INC. <br />